Recent changes in ICD-2 scope are discussed. An increse of CW linac energy can result in that a pulsed linac will be prefered to the RCS. Concequently, a low current H- beam has to be strip-injected to Recycler. If not addressed it can be a serious problem. A possible injection scheme to Recycler is considered.