828-v2 |
HINS six cavity test RF distribution block diagram |
Ralph J. Pasquinelli |
HINS
|
09 Sep 2011 |
579-v3 |
HINS Six-Cavity Test |
Gennady Romanov |
HINS
|
08 Sep 2011 |
901-v1 |
Six-Cavity Test Installation Plan - June 2011 |
Bob Webber |
HINS
|
16 Jun 2011 |
887-v1 |
First Beam Measurements from Longitudinal Bunch Shape Monitor at HINS |
Christoph Maag |
HINS
|
17 May 2011 |
883-v1 |
First Beam Data from Fast Faraday Cup at HINS |
Vic E Scarpine |
HINS
|
12 May 2011 |
882-v1 |
Mechanical Readiness for Six-Cavity Test Installation |
Alex Z Chen |
HINS
|
12 May 2011 |
881-v1 |
HINS 2.5 MeV Beam Optics and Emittance Measurements |
Bruce Hanna |
HINS
|
12 May 2011 |
655-v22 |
HINS Linac Safety Assessment and Radiation Shielding Assessment Docs |
Peter Kasper et al. |
LE Linac
Linac
HINS
|
15 Apr 2011 |
810-v1 |
HINS H- ion source test stand at pre-acc R&D lab |
Daniel S Bollinger et al. |
Experiments
HINS
|
07 Apr 2011 |
798-v1 |
Possible Configurations for Prototypes of PX Cryomodules:SSR0 and SSR1 |
Iouri Terechkine |
LE Linac
Presentations
Linac
SRF
HINS
|
10 Dec 2010 |
795-v1 |
Status and plans for SSR0 and SSR1 Cavities |
Bob Webber |
LE Linac
SRF
HINS
SRF Specifications
|
01 Dec 2010 |
542-v2 |
HINS R&D Activities at Meson Detector Building |
Jim Steimel et al. |
HINS
|
22 Oct 2010 |
764-v1 |
MDB Beam Test Facility Plan |
Bob Webber |
Ion Source
LE Linac
Linac
HINS
|
21 Oct 2010 |
538-v3 |
Estimate of X-Ray Shielding and Radiation Monitoring for Safe Operation of the HINS Cavity Test Cave in the Meson Detector Building |
Jim Steimel et al. |
HINS
|
12 Oct 2010 |
616-v1 |
Chopper in HINS (RFQ+matcher+Chopper) |
Nikolay A. Solyak |
Simulations
SRF
HINS
|
04 Oct 2010 |
728-v1 |
Experiences with the Fermilab HINS 325 MHz RFQ |
Timergali Khabiboulline et al. |
LE Linac
Linac
HINS
|
07 Sep 2010 |
724-v1 |
FIRST HIGH GRADIENT TEST RESULTS OF A DRESSED 325 MHZ SUPERCONDUCTING SINGLE SPOKE RESONATOR AT FERMILAB |
Timergali Khabiboulline et al. |
LE Linac
Linac
SRF
HINS
|
07 Sep 2010 |
657-v1 |
Third Report on SSR1-01 RF Results in MDB Cryostat and Power Coupler Qext Calculations |
Timergali Khabiboulline |
LE Linac
Presentations
Linac
SRF
HINS
|
27 Aug 2010 |
519-v1 |
HINS MDB Ion Source Safety Documents |
Roger Dixon et al. |
HINS
|
24 Aug 2010 |
654-v2 |
HINS Report for DOE Site Visit - B&R Code KA15-02-011_August_23_2010 |
Bob Webber |
LE Linac
Presentations
Linac
SRF
HINS
|
23 Aug 2010 |
652-v1 |
Second Report on SSR0-1 RF Results in MDB Cryostat |
Timergali Khabiboulline |
LE Linac
Linac
SRF
HINS
|
22 Aug 2010 |
650-v1 |
SSR1 cold test - FAST/SLOW TUNER - first data |
Yuriy Pischalnikov |
LE Linac
Presentations
Linac
SRF
HINS
|
20 Aug 2010 |
649-v1 |
SSR1-01 First Cooldown and RF Results in MDB Test Cryostat |
Timergali Khabiboulline |
LE Linac
Linac
HINS
|
20 Aug 2010 |
642-v1 |
Optimization of Wire Scanner position for HINS Energy Spread Measurement |
Eliana Gianfelice-Wendt |
Simulations
Instrumentation
LE Linac
Presentations
HINS
|
04 Aug 2010 |
633-v1 |
HINS Six-Cavity Test Presentation to PX Front-End Meeting |
Bob Webber |
LE Linac
Presentations
HINS
|
07 Jul 2010 |
617-v1 |
PX_solyak_lattice_front-end_in_HINS_Cave |
Bob Webber |
LE Linac
Presentations
HINS
|
26 May 2010 |
611-v1 |
A Review of Low β Resonator Performance |
Gennady Romanov |
LE Linac
SRF
HINS
|
14 May 2010 |
610-v1 |
SC options for low energy part of Project X linac |
Gennady Romanov |
LE Linac
SRF
HINS
|
14 May 2010 |
609-v1 |
Single-spoke Cavity Cryomodule Integration and Fabrication Considerations |
Iouri Terechkine |
SRF
HINS
|
14 May 2010 |
598-v1 |
HINS Beam Absorber MARS15 Simulations (extended) |
Nikolai Mokhov |
Absorbers
Presentations
HINS
|
30 Apr 2010 |
593-v1 |
HINS H- Ion Source Status |
Bob Webber |
Ion Source
HINS
|
14 Apr 2010 |
585-v1 |
HINS Front-end Beam Facility Status |
Bob Webber |
LE Linac
HINS
|
01 Apr 2010 |
457-v1 |
Project X MEBT/Chopper and 3-Cavity SSR0 in MDB |
Bob Webber |
LE Linac
HINS
|
01 Apr 2010 |
439-v1 |
Wai-Ming Tam's Thesis and Final Reports |
Wai-Ming Tam |
HINS
|
18 Feb 2010 |
428-v1 |
HINS R&D Program Goals Statement |
Bob Webber |
HINS
|
02 Feb 2010 |
426-v1 |
HINS Possibilities for Project X, January 2010 |
Bob Webber |
Instrumentation
Presentations
SRF
HINS
|
26 Jan 2010 |
409-v1 |
Initial Observations of Beam Transmission vs. RF Power for the HINS RFQ |
Jim Steimel et al. |
HINS
|
19 Jan 2010 |
408-v1 |
Results of First Wire Scans of HINS 2.5 MeV Beam |
Bob Webber |
Instrumentation
HINS
|
19 Jan 2010 |
549-v1 |
HINS Clock Events, Definitions, and Usage |
Bob Webber |
HINS
|
12 Jan 2010 |
577-v1 |
HINS PLC Documentation |
Dave McDowell et al. |
HINS
|
22 Dec 2009 |
520-v1 |
HINS 2.5 MeV Beam Operations and Commissioning Documents |
Jim Steimel et al. |
HINS
|
16 Dec 2009 |
578-v1 |
HINS RFQ Heating Estimates |
Bob Webber |
HINS
|
10 Dec 2009 |
518-v1 |
HINS Shielding/Dose Calculation with Shielding Cracks |
Nikolai Mokhov |
HINS
|
19 Nov 2009 |
510-v1 |
HINS 325 MHz Cavity Test Cave 3D Model |
David Peterson et al. |
HINS
|
18 Nov 2009 |
513-v1 |
HINS - LLRF |
Julien Branlard |
LLRF
HINS
|
23 Sep 2009 |
512-v1 |
HINS RoadMap August 2009 |
Bob Webber |
HINS
|
28 Aug 2009 |
508-v1 |
HINS 325 MHz Cavity Test Cave Documentation |
Rick Bossert et al. |
Controls
HINS
|
23 Jul 2009 |
509-v1 |
HINS LLRF Update |
Brian E Chase |
HINS
|
21 Jul 2009 |
227-v1 |
HINS Status Report for June 19, 2009 Project X Meeting |
Bob Webber |
Presentations
HINS
|
19 Jun 2009 |
507-v1 |
HINS LCW System Flow Distribution |
Maurice Ball |
HINS
|
08 Jun 2009 |
474-v1 |
HINS RFQ_layout |
Elmie Peoples |
HINS
|
17 Apr 2009 |
582-v1 |
Analysis of RFQ Vacuum System for HINS Tests at MDB |
Henryk Piekarz |
HINS
|
18 Feb 2009 |
583-v1 |
Estimate of RF Cavity X-rays in the HINS Linac Enclosure and Shielding Required |
Bob Webber |
HINS
|
27 Jan 2009 |
563-v1 |
HINS Linac Baseline Design Documents |
Bob Webber |
HINS
|
30 Dec 2008 |
495-v1 |
HINS RF distribution test block diagram |
Ralph J. Pasquinelli |
HINS
|
19 Nov 2008 |
571-v1 |
Autosave at HINS |
Sharon L. Lackey |
HINS
|
21 Jul 2008 |
570-v1 |
Saving and Restoring Epics devices at HINS and HTS |
Sharon L. Lackey |
Controls
HINS
|
17 Jun 2008 |
479-v1 |
HINS with 8 ILC-units at 31.5 MV/m : Acceleration of H- (15 mA) and e- (1 nC) |
Jean-Paul Carneiro |
HINS
|
12 Jun 2008 |
569-v1 |
HINS Alarms |
Sharon L. Lackey |
Controls
HINS
|
07 Jun 2008 |
475-v1 |
HINS Talk to AD Controls Dept - April 2008 |
Bob Webber |
Controls
HINS
|
29 Apr 2008 |
471-v1 |
H- Ion Source Spec for HINS and Considerations for Project X H- Ion Source |
Charles W. Schmidt et al. |
Ion Source
HINS
|
19 Mar 2008 |
467-v1 |
HINS Presentation to AD Instrumentation Department 2/20/2008 |
Bob Webber |
Instrumentation
HINS
|
20 Feb 2008 |
567-v1 |
Final Report on Design and Test of a 325 MHz Hybrid and Circulator for Fermilab Proton Driver |
Ding Sun |
Proton Driver
HINS
|
28 Dec 2007 |
561-v1 |
Testing 325 MHz Cavities in the ILC IB1 Vertical Test System |
Bob Webber |
HINS
|
14 Dec 2007 |
564-v1 |
Overview of HINS Operations and Radiation Shielding Considerations in MDB |
Bob Webber |
HINS
|
05 Nov 2007 |
560-v1 |
A Simple Model for a Superconducting RF cavity with a Vector Phase Modulator |
Dave McGinnis |
Unassigned
|
27 Oct 2007 |
558-v1 |
High Power RF Distribution and Control in the HINS |
Alfred Moretti |
HINS
|
11 Oct 2007 |
557-v1 |
HINS with 8 ILC-units at 45 mA: jitter studies. |
Jean-Paul Carneiro |
HINS
|
12 Jul 2007 |
553-v1 |
HINS with 8 ILC-units at 45 mA : misalignment and jitter studies. |
Jean-Paul Carneiro |
HINS
|
26 Apr 2007 |
534-v1 |
High Intensity Proton Source Naming Convention |
Sharon L. Lackey et al. |
Controls
|
18 Apr 2007 |
550-v1 |
HINS with 8 ILC-units at 45 mA |
Jean-Paul Carneiro |
HINS
|
29 Mar 2007 |
548-v1 |
Waveguide Coupler Monitors and RF Interlock Detector Cable Distribution and Attenuation |
Jim Steimel |
Unassigned
|
21 Mar 2007 |
547-v1 |
Isolation Verification of HINS Meson Power RF Distribution Components |
Jim Steimel |
HINS
|
21 Mar 2007 |
535-v1 |
HINS/PD Meson Planning Meeting Minutes |
Jim Steimel et al. |
HINS
|
02 Mar 2007 |
545-v1 |
Meson HINS/ILCTA LCW System Block Diagram/ Schematic |
Maurice Ball |
HINS
|
28 Feb 2007 |
533-v1 |
HINS Program Overview for CD Controls Management Meeting |
Bob Webber |
Controls
HINS
|
09 Oct 2006 |
531-v1 |
Proposed Proton Driver/HINS Beam Operations at Meson Detector Building |
Bob Webber |
Proton Driver
HINS
|
15 Aug 2006 |