1067-v2 |
Functional specifications for PXIE MEBT scrapers |
Alexander Shemyakin |
Front End
|
02 May 2019 |
976-v9 |
Preliminary Layout of PXIE |
Curtis Baffes et al. |
Requirements and Specifications
CW Linac
|
14 Jun 2017 |
1344-v0 |
PXIE LEBT and MEBT Toroids for measurement of the beam loss in RFQ FRS |
Vic E Scarpine et al. |
Instrumentation
Instrumentation
Front End
|
05 Dec 2014 |
1224-v1 |
Functional Requirement Specification (FRS) PXIE MEBT BPM at the initial stage |
Alexander Shemyakin |
Front End
|
09 Oct 2013 |
1173-v3 |
Project X and PXIE LEBT Scraper FRS |
Lionel R Prost |
Instrumentation
Front End
|
09 Apr 2013 |
1164-v3 |
650 MHz Beta=0.9 Cavity Functional Requirements Specification |
Timergali Khabiboulline |
Requirements and Specifications
Cavities and Cryomodules
650 MHz
|
12 Mar 2013 |
1163-v2 |
PXIE LEBT Chopper FRS |
Lionel R Prost et al. |
Absorbers
Front End
|
13 Feb 2013 |
1160-v5 |
Project X & PXIE LEBT/RFQ Interface Functional Requirement Specification |
Lionel R Prost |
Front End
|
22 Mar 2013 |
1079-v2 |
325 MHz SSR1 Cavity Functional Requirements Specification (FRS) |
Leonardo Ristori |
Requirements and Specifications
SRF
325 MHz
SRF Specifications
|
09 Jul 2012 |
977-v1 |
PXIE MEBT kicker specifications |
Valeri A Lebedev et al. |
LE Linac
Front End
|
20 Dec 2011 |
968-v5 |
Project X and PXIE Ion Source Functional Requirement Specifications |
Qing Ji et al. |
Requirements and Specifications
Front End
|
22 Mar 2013 |
964-v1 |
Functional specifications for PXIE MEBT absorber |
Alexander Shemyakin |
Requirements and Specifications
LE Linac
Front End
|
19 Dec 2011 |
938-v3 |
Functional specifications for PXIE MEBT |
Valeri A Lebedev et al. |
Requirements and Specifications
Front End
|
25 Jun 2012 |
931-v3 |
Preliminary HW and SSR1 Cryomodule Functional Requirements Specifications for PXIE |
Thomas H. Nicol |
325 MHz
|
07 Oct 2011 |
912-v7 |
Functional Requirement Specification - Project X and PXIE Low Energy Beam Transport Section |
Lionel R Prost |
Requirements and Specifications
Front End
|
22 Mar 2013 |
894-v9 |
Project X RFQ: functional physics requirements |
Sergei Nagaitsev et al. |
Requirements and Specifications
Front End
|
11 Feb 2013 |
885-v4 |
650 MHz Beta=0.9 Cryomodule Functional Requirements Specification |
Thomas H. Nicol |
Requirements and Specifications
HE Linac
650 MHz
Cavities and Cryomodules
Cryogenics
|
20 Feb 2013 |
794-v1 |
325 MHz Spoke Cavity Prototype Cryomodule Functional Requirements Specification |
Bob Webber |
Cavities and Cryomodules
LE Linac
Linac
SRF
HINS
CW Linac
Front End
SRF Specifications
|
01 Dec 2010 |
787-v5 |
325 MHz Cavity Test Cryostat 2K Conversion Functional Requirements Specification |
Thomas H. Nicol |
Requirements and Specifications
LE Linac
Presentations
Linac
SRF
HINS
325 MHz
|
18 May 2011 |
1221-v3 |
Feasibility of a radiation-cooled scraper for PXIE MEBT |
Curtis Baffes et al. |
Absorbers
Front End
|
08 Dec 2015 |
1373-v3 |
MEBT Vacuum Protection of SRF for PXIE and PIP-II |
Curtis Baffes et al. |
LE Linac
Linac
Front End
|
12 May 2015 |
1360-v1 |
PXIE RFQ Thermal Control Overview |
Daniel Bowring |
162.5 MHz
|
01 Apr 2015 |
965-v5 |
Proposal for names assignment of PXIE components |
Bruce Hanna et al. |
Requirements and Specifications
LE Linac
Front End
|
15 Dec 2014 |
1341-v1 |
Summary of RFQ RF system number 1 performenace |
Ralph J. Pasquinelli |
162.5 MHz
|
19 Nov 2014 |
1334-v1 |
PIPII RFQ circulator measurements |
Ralph J. Pasquinelli |
162.5 MHz
|
30 Oct 2014 |
1324-v1 |
Acceptance of PXIE RFQ |
Gennady Romanov |
Reports
Front End
|
01 Oct 2014 |
1313-v1 |
Electron Stimulated Desorption in the PXIE Test Stand |
Alexander Shemyakin |
Absorbers
Front End
|
08 Aug 2014 |
1293-v1 |
Commissioning Plan for PXIE RFQ System - Amplifiers |
Ralph J. Pasquinelli et al. |
162.5 MHz
Front End
|
15 May 2014 |
1252-v2 |
Analysis of Potential Radiation Hazards from the PXIE RFQ |
Lionel R Prost et al. |
Front End
|
14 May 2014 |
1291-v2 |
SNS Visit RFQ |
Jim Steimel |
Other Labs
Front End
|
14 May 2014 |
1287-v1 |
162.5 MHz 7 kW CW power amp spec |
Ralph J. Pasquinelli |
162.5 MHz
|
30 Apr 2014 |
1283-v1 |
PXIE RFQ Status 4-22-2014 |
Curtis Baffes et al. |
162.5 MHz
CW Linac
|
22 Apr 2014 |
1223-v3 |
PXIE Low Energy Beam Transport Chopper - Mechanical Design Specifications Constraints |
Lionel R Prost |
Front End
|
16 Apr 2014 |
1277-v1 |
Beam size and emittance measurements in LEBT |
Richard D'Arcy et al. |
Reports
Front End
|
08 Apr 2014 |
1265-v1 |
PXIE RFQ System - Amplifiers - Overview of Hazards |
Ralph J. Pasquinelli et al. |
162.5 MHz
Front End
|
19 Feb 2014 |
1264-v1 |
PXIE RFQ System - Amplifiers Maximum Ratings |
Ralph J. Pasquinelli et al. |
162.5 MHz
Front End
|
19 Feb 2014 |
1254-v1 |
PXIE RFQ System - Input Couplers Hazards and Maximum Ratings |
Sergey Kazakov et al. |
Requirements and Specifications
CW Linac
Front End
|
30 Jan 2014 |
1242-v1 |
PXIE RFQ Meeting Minutes from LBNL Visit |
Curtis Baffes et al. |
LE Linac
Front End
|
10 Jan 2014 |
1241-v1 |
Summary of PXIE RFQ Progress at LBNL |
Curtis Baffes et al. |
Reports
CW Linac
|
07 Jan 2014 |
1235-v1 |
Maximum Ratings - RFQ Systems |
Andrew Lambert et al. |
Front End
|
02 Dec 2013 |
1234-v1 |
Overview of Hazards - RFQ Systems |
Matt Hoff et al. |
Front End
|
02 Dec 2013 |
1220-v3 |
PXIE MEBT 200 Ohm kicker technical requirements specification (TRS) |
Alex Z Chen et al. |
Front End
|
31 Oct 2013 |
1227-v1 |
PXIE Ion Source and LEBTInstallation Status |
Lionel R Prost |
Reports
Presentations
Front End
|
29 Oct 2013 |
1219-v1 |
Considerations for the Design of the LEBT Chopper for PXIE |
Lionel R Prost et al. |
Absorbers
Front End
|
06 Sep 2013 |
1213-v1 |
Project X RF update for PXIE |
Ralph J. Pasquinelli |
162.5 MHz
|
20 Aug 2013 |
1205-v1 |
RF Sources for Project X |
Ralph J. Pasquinelli |
RF Sources
|
21 Jun 2013 |
1196-v1 |
650 MHz high beta dressed cavity development plan |
Timergali Khabiboulline et al. |
HE Linac
Cavities and Cryomodules
650 MHz
Presentations
SRF
CW Linac
|
06 Jun 2013 |
1176-v0 |
Project X & PXIE LEBT Isolated Diaphragm |
Lionel R Prost |
Front End
|
20 Mar 2013 |
1043-v2 |
Specifications for PXIE MEBT BPMs |
Alexander Shemyakin |
Instrumentation
Front End
|
14 Mar 2013 |
1172-v1 |
Documents for PXIE BPM meeting on 12-Mar-2013 |
Alexander Shemyakin |
Instrumentation
Front End
|
14 Mar 2013 |
1161-v1 |
RFQ- MEBT interface information |
Alexander Shemyakin |
Front End
|
13 Feb 2013 |
1159-v1 |
Technical Requirement Specification PXIE MEBT and HEBT quadrupoles and dipole correctors |
Alexander Shemyakin et al. |
Front End
|
08 Feb 2013 |
1060-v3 |
PXIE LEBT Solenoid 'preliminary' Design from TD |
Vladimir Kashikhin et al. |
Front End
|
30 Jan 2013 |
1059-v3 |
Request for proposal for the PXIE LEBT solenoids (i.e. specs) |
Lionel R Prost et al. |
Front End
|
30 Jan 2013 |
1151-v1 |
PXIE MEBT Bunching Cavity Status Update |
Meiyu Chen et al. |
Cavities and Cryomodules
LE Linac
Presentations
|
18 Jan 2013 |
1149-v1 |
MEBT Buncher Cavity Design Proposal and Specification |
Meiyu Chen et al. |
Cavities and Cryomodules
162.5 MHz
SRF Specifications
|
03 Jan 2013 |
1144-v1 |
PXIE MEBT Triplets, Doublets, and Dipole Correctors |
Vladimir Kashikhin |
Reports
Simulations
Presentations
Linac
Front End
|
21 Dec 2012 |
1131-v1 |
PXIE RFQ Installation & Commissioning Plan |
Vic E Scarpine et al. |
Presentations
Front End
|
29 Nov 2012 |
1117-v3 |
PXIE MEBT status |
Alexander Shemyakin |
Front End
|
27 Nov 2012 |
1109-v1 |
PXIE RFQ RF power source and schedule |
Ralph J. Pasquinelli |
162.5 MHz
|
23 Oct 2012 |
1107-v1 |
PXIE MEBTstatus and plans for FY2013 |
Alexander Shemyakin |
Reports
Presentations
Front End
|
16 Oct 2012 |
1104-v1 |
Ion Source Assembly Requirements |
Lionel R Prost |
Vacuum
Ion Source
Front End
|
05 Oct 2012 |
1097-v1 |
PXIE RFQ Interface Control Document |
Richard P Stanek |
LE Linac
Front End
|
13 Aug 2012 |
1086-v1 |
MEBT Buncher Cavity pre-Design Review |
Meiyu Chen et al. |
162.5 MHz
Presentations
Reviews
|
19 Jul 2012 |
1082-v1 |
PIXIE LCW Requirements |
Bruce Hanna |
Conventional Facilities
Front End
|
12 Jul 2012 |
1078-v1 |
Ion Source and LEBTStatuses |
Lionel R Prost |
Ion Source
LE Linac
Presentations
Front End
|
03 Jul 2012 |
1073-v1 |
PXIE Machine Protection System |
Jim Steimel et al. |
Accelerator Physics & System Integration
Presentations
CW Linac
|
26 Jun 2012 |
966-v4 |
Project X Front End R&D Program - PXIE |
Steve Holmes |
Requirements and Specifications
Front End
|
29 May 2012 |
1045-v1 |
PXIE MEBT 200 Ohm kicker structure technical specifications |
Alexander Shemyakin |
LE Linac
Front End
|
30 Apr 2012 |
1044-v1 |
50 ohm chopper amplifier specification |
Ralph J. Pasquinelli |
Front End
|
30 Apr 2012 |
1034-v1 |
PX front end SC cavity design and measurements |
Timergali Khabiboulline |
Cavities and Cryomodules
Presentations
SRF
|
12 Apr 2012 |
1030-v1 |
LLRF for PXIE |
Brian E Chase |
1300 MHz/CW
LLRF
|
11 Apr 2012 |
1028-v3 |
200Ohm Chopper R&D Progress |
Greg Saewert |
Instrumentation
Presentations
Front End
|
10 Apr 2012 |
1020-v2 |
PXIE MEBT concept |
Alexander Shemyakin |
Front End
|
09 Apr 2012 |
990-v1 |
Test of TESEQ CBA 1G-150 wide band 150-Watt amplifier As a Project X Chopper Kicker Driver |
Valeri A Lebedev et al. |
Front End
|
09 Feb 2012 |
979-v1 |
PXIE MEBT Chopper Driver Specifications (Unipolar scheme) |
Greg Saewert et al. |
CW Linac
|
23 Dec 2011 |
915-v1 |
Functional Requirement Specification |
Camille Ginsburg |
Requirements and Specifications
650 MHz
|
19 Dec 2011 |
934-v1 |
Specifications for PXIE MEBT BPMs |
Alexander Shemyakin |
Requirements and Specifications
LE Linac
Front End
|
19 Dec 2011 |
962-v1 |
Requirements for PXIE MEBT absorber |
Alexander Shemyakin |
Absorbers
LE Linac
Front End
|
15 Nov 2011 |
941-v1 |
RF Power Sources for PXIE |
Ralph J. Pasquinelli |
RF Sources
|
26 Oct 2011 |
935-v2 |
Requirements for the PXIE MEBT chopper |
Valeri A Lebedev et al. |
LE Linac
Front End
|
18 Oct 2011 |
919-v1 |
Current Status and Plans for SRF Cavity Processing for Project X |
Allan M Rowe |
Cavities and Cryomodules
SRF
|
19 Aug 2011 |
916-v1 |
Overview of field emission problem in SRF cavities |
Alexander Romanenko |
Cavities and Cryomodules
SRF
Conventional Facilities
|
14 Jul 2011 |
898-v1 |
Spoke014 Cavity for ADS in China |
Jianping Dai et al. |
325 MHz
|
09 Jun 2011 |
886-v1 |
Project-X RFQ. EM design issues. |
Gennady Romanov |
Front End
|
18 May 2011 |
840-v1 |
Project X Cryomodule Configurations |
Thomas H. Nicol |
Cavities and Cryomodules
LE Linac
Presentations
325 MHz
Cryogenics
|
22 Mar 2011 |
839-v1 |
LEBT, 81 MHz RFQ,
|
Milorad B. Popovic |
LE Linac
Front End
|
17 Mar 2011 |
819-v1 |
SSR1-01 Pulsed Tests |
Robert L Wagner |
SRF
HINS
325 MHz
|
10 Feb 2011 |
813-v1 |
SSR0 design update |
Leonardo Ristori |
Simulations
Cavities and Cryomodules
Cavities and Cryomodules
SRF
325 MHz
Front End
|
27 Jan 2011 |
811-v1 |
Project-X 162.5 MHz RFQ Design Proposal |
Andrey Kolomiets |
LE Linac
Front End
|
24 Jan 2011 |
803-v1 |
Project-X Front-End Update |
John Staples |
Other Labs
Presentations
Front End
|
15 Dec 2010 |
789-v1 |
IOT power compression test |
Ralph J. Pasquinelli |
650 MHz
|
16 Nov 2010 |