1163-v2 |
PXIE LEBT Chopper FRS |
Lionel R Prost et al. |
Absorbers
Front End
|
13 Feb 2013 |
1221-v3 |
Feasibility of a radiation-cooled scraper for PXIE MEBT |
Curtis Baffes et al. |
Absorbers
Front End
|
08 Dec 2015 |
1313-v1 |
Electron Stimulated Desorption in the PXIE Test Stand |
Alexander Shemyakin |
Absorbers
Front End
|
08 Aug 2014 |
1226-v2 |
PXIE MEBT Absorber Prototype Status Update |
Curtis Baffes et al. |
Absorbers
LE Linac
|
15 Oct 2013 |
1219-v1 |
Considerations for the Design of the LEBT Chopper for PXIE |
Lionel R Prost et al. |
Absorbers
Front End
|
06 Sep 2013 |
776-v7 |
Reference Design Report |
Russ Alber et al. |
Controls
Linac
Absorbers
Reports
Recycler
Transfer Line
Conventional Facilities
Instrumentation
Cryogenics
Main Injector
|
17 Jul 2013 |
1206-v1 |
The Conceptual Design of the PXIE Beam Dump. Radiation Shielding and PXIE Complex Enclosure |
Nikolay A. Solyak |
Presentations
Absorbers
|
24 Jun 2013 |
1186-v5 |
Evaluation of Tritium Generation in the Soil under the PXIE Beam Dump (Problem of the Groundwater Activation) |
Yury I Eidelman |
Absorbers
|
24 Jun 2013 |
1112-v5 |
PXIE MEBT Absorber Prototype Status Update |
Curtis Baffes et al. |
Absorbers
LE Linac
|
15 Nov 2012 |
1100-v2 |
Measurements of the electron beam size at the absorber prototype test bench |
Anna Mitskovets |
Experiments
Absorbers
|
03 Oct 2012 |
1091-v2 |
Sputtering of Materials for MEBT Absorber and PXIE Beam Dump |
Yury I Eidelman |
Absorbers
|
02 Aug 2012 |
1088-v1 |
Beam absorber for a 2.1-MeV proton beam |
Igor L Rakhno |
Absorbers
|
25 Jul 2012 |
986-v6 |
Analysis of Materials for MEBT Absorber |
Yury I Eidelman |
Absorbers
|
25 Jul 2012 |
1084-v1 |
Estimates of X-Ray production and dose rate for the Project X MEBT absorber test bench |
Lionel R Prost et al. |
Experiments
Absorbers
|
13 Jul 2012 |
1042-v3 |
SRIM Simulation of the MEBT Absorber |
Yury I Eidelman |
Absorbers
LE Linac
|
26 Apr 2012 |
1027-v2 |
MEBT Absorber Status, Project X Collaboration Meeting |
Curtis Baffes et al. |
Absorbers
|
11 Apr 2012 |
1023-v1 |
Bunch-by-Bunch Kicker and its Driver: 50 choice |
Ralph J. Pasquinelli et al. |
Presentations
Absorbers
Instrumentation
|
08 Apr 2012 |
991-v1 |
MEBT Absorber Design Status Update |
Curtis Baffes et al. |
Absorbers
|
14 Feb 2012 |
963-v1 |
Electron Beam Dynamics Simulations for the Proposed Test of the PXIE/Project X MEBT Absorber |
Lionel R Prost et al. |
Experiments
Presentations
Absorbers
Simulations
|
15 Nov 2011 |
962-v1 |
Requirements for PXIE MEBT absorber |
Alexander Shemyakin |
Absorbers
Front End
LE Linac
|
15 Nov 2011 |
961-v1 |
Preliminary Thermal Analysis of MEBT Absorber |
Curtis Baffes |
Absorbers
|
14 Nov 2011 |
833-v1 |
Beam absorber |
Iouri Terechkine |
Absorbers
LE Linac
|
09 Mar 2011 |
792-v2 |
Chopping and Limitations to MEBT |
Valeri A Lebedev |
Presentations
Absorbers
Space Charge Effects
Transfer Line
LE Linac
|
03 Dec 2010 |
771-v1 |
Chopping and Limitations to MEBT; Injection to Recycler |
Valeri A Lebedev |
Absorbers
H- Injection
LE Linac
|
02 Nov 2010 |
768-v1 |
2.5 MeV Chopper Beam Absorber Thermal Considerations |
Iouri Terechkine |
Linac
Absorbers
LE Linac
|
27 Oct 2010 |
631-v1 |
A Look at PX 2.5 MeV Chopper Beam Dump Thermal Issue |
Iouri Terechkine |
Absorbers
HINS
LE Linac
|
01 Jul 2010 |
598-v1 |
HINS Beam Absorber MARS15 Simulations (extended) |
Nikolai Mokhov |
Presentations
Absorbers
HINS
|
30 Apr 2010 |
252-v1 |
J-PARC RCS Injection Issues |
Pranab K Saha |
Other Labs
Presentations
Absorbers
Collaboration
H- Injection
|
10 Sep 2009 |
83-v2 |
Initial Configuration Document v1.1 |
Russ Alber et al. |
Controls
Project Management
Absorbers
Reports
HE Linac
HINS
Space Charge Effects
Transfer Line
Conventional Facilities
Instabilities
Instrumentation
Cryogenics
H- Injection
LE Linac
Main Injector
|
16 Mar 2009 |
71-v1 |
MI Injection Energy |
Valeri A Lebedev |
Absorbers
HE Linac
Space Charge Effects
Instabilities
|
08 Oct 2008 |
50-v1 |
Beam Loss and Collimation |
Nikolai Mokhov |
Presentations
Absorbers
Main Injector
|
01 Oct 2008 |