787-v5 |
325 MHz Cavity Test Cryostat 2K Conversion Functional Requirements Specification |
Thomas H. Nicol |
HINS
325 MHz
SRF
Requirements and Specifications
Presentations
Linac
LE Linac
|
18 May 2011 |
1379-v1 |
PXIE 50 Ohm Fast Kicker: Measurement and Power Test Results of First Half Prototype |
Alex Z Chen et al. |
Presentations
|
18 Jun 2015 |
1380-v2 |
200 Ohm MEBT Chopper Development Progress |
Alex Z Chen et al. |
Instrumentation
Presentations
|
10 Jun 2015 |
1375-v1 |
PXIE Operating Modes and Timing Events |
Jim Steimel |
Presentations
Controls
|
26 May 2015 |
1372-v1 |
Space-Charge Compensation in the PXIE LEBT |
Jean-Paul Carneiro et al. |
Presentations
Linac
|
11 May 2015 |
1365-v1 |
Summary for SLHiPP-5 |
Valeri A Lebedev |
Reports
Presentations
Linac
|
15 Apr 2015 |
1361-v1 |
PXIE Controls Status |
Michael J Kucera et al. |
Presentations
Controls
|
07 Apr 2015 |
1359-v1 |
PXIE LLR Update |
Brian E Chase |
Presentations
|
31 Mar 2015 |
1358-v2 |
PXIE LEBT Commissioning Update |
Lionel R Prost |
Presentations
LE Linac
|
25 Mar 2015 |
1355-v1 |
HTS Vibration Analsys |
Jeremiah Holzbauer et al. |
Presentations
|
11 Mar 2015 |
1352-v1 |
Booster Longitudinal Impedance |
Valeri A Lebedev |
Instabilities
Presentations
RCS
|
10 Feb 2015 |
1331-v1 |
Painting in the course of PIP-II injection to Booster |
Valeri A Lebedev |
Presentations
RCS
|
21 Oct 2014 |
1327-v4 |
Controls for PXIE and PIP-II |
Jim Patrick |
Presentations
Controls
|
07 Oct 2014 |
1325-v1 |
PXIE LEBT Commissioning Update |
Lionel R Prost |
Presentations
LE Linac
|
01 Oct 2014 |
1319-v1 |
Results of Hight Power Test of 325 MHz Couplers |
Sergey Kazakov |
SRF
Presentations
|
27 Aug 2014 |
1318-v1 |
HIGH POWER DENSITY TEST OF PXIE MEBT ABSORBER PROTOTYPE |
Curtis Baffes et al. |
Presentations
|
26 Aug 2014 |
1315-v1 |
PXIE LEBT Emittance Scanner Commissioning |
Richard D'Arcy |
Presentations
LE Linac
|
14 Aug 2014 |
1312-v1 |
Proton Capabilities at Fermilab |
Steve Holmes |
Presentations
|
07 Aug 2014 |
1311-v1 |
Proton Improvement Plan-II |
Steve Holmes |
Presentations
|
07 Aug 2014 |
1310-v1 |
PIP-II Overview: Goals, Status, Strategy |
Steve Holmes |
Presentations
|
07 Aug 2014 |
1309-v1 |
MegaWatt Proton Beams for Particle Physics at Fermilab |
Steve Holmes |
Presentations
|
07 Aug 2014 |
1308-v1 |
PXIE LEBT Commissioning Status |
Lionel R Prost |
Presentations
LE Linac
|
29 Jul 2014 |
1307-v1 |
Intense Beams for Particle Physics |
Bob Tschirhart |
Presentations
|
17 Jul 2014 |
1298-v1 |
Tasks for the PIP-II RDR |
Valeri A Lebedev |
Presentations
|
25 Jun 2014 |
1292-v1 |
PXIE IS/LEBT Commissioning Update |
Lionel R Prost |
Ion Source
Presentations
LE Linac
|
15 May 2014 |
1290-v1 |
Highlights of the trip to SNS on May 5-6, 2014 |
Alexander Shemyakin et al. |
Other Labs
Presentations
|
13 May 2014 |
1279-v1 |
Status of Mechanical Design of LEBT_08APR14 |
Rich Andrews |
Presentations
|
09 Apr 2014 |
1278-v1 |
PXIE LEBT Commissioning Status |
Lionel R Prost |
Presentations
|
08 Apr 2014 |
1274-v2 |
Preparation for the PIP-II RDR |
Valeri A Lebedev |
Main Injector
Presentations
LE Linac
|
01 Apr 2014 |
1273-v1 |
Engineering Document Management in Teamcenter |
Donald Mitchell |
Project Management
Presentations
|
25 Mar 2014 |
1267-v1 |
Determination of Access controls for PXIE cave during RFQ RF powered operation |
Anthony F Leveling |
Reports
Presentations
LE Linac
|
04 Mar 2014 |
1263-v1 |
PXIE Ion Source & LEBT Commissioning Update |
Rich Andrews et al. |
Ion Source
Presentations
|
18 Feb 2014 |
1261-v1 |
North American PAC 2013 Conference paper |
Greg Saewert |
Hardware
Presentations
|
13 Feb 2014 |
1260-v2 |
PIP-II and PXIE |
Valeri A Lebedev |
HE Linac
Presentations
LE Linac
|
12 Feb 2014 |
1257-v1 |
Booster Injection in the Era of PIP-II: A preliminary assessment |
David E. Johnson |
Presentations
|
04 Feb 2014 |
1244-v1 |
Progress on RFQ couplers test stand |
Sergey Kazakov |
SRF
Presentations
|
14 Jan 2014 |
1243-v2 |
PXIE CAD Model: Status, Responsibilities and Plan Forward |
Curtis Baffes |
Presentations
Conventional Facilities
|
14 Jan 2014 |
1240-v1 |
PXIE Ion Source Commissioning Status - Update |
Bruce Hanna et al. |
Reports
Ion Source
Presentations
|
07 Jan 2014 |
1239-v1 |
Intensity Frontier materials for a general audience |
Bob Tschirhart |
Presentations
|
26 Dec 2013 |
1236-v1 |
Status of HWR Cryomodule Development |
Peter N Ostroumov |
SRF
Presentations
|
17 Dec 2013 |
1228-v1 |
PXIE RFQ Status |
Matt Hoff et al. |
Presentations
LE Linac
|
05 Nov 2013 |
1227-v1 |
PXIE Ion Source and LEBTInstallation Status |
Lionel R Prost |
Reports
Front End
Presentations
|
29 Oct 2013 |
1215-v1 |
PXIE Controls |
Jim Patrick |
Presentations
Controls
|
20 Aug 2013 |
1216-v1 |
PXIE IS & LEBT Installation Status Report |
Lionel R Prost |
Presentations
|
20 Aug 2013 |
1209-v2 |
Summary of Project X Research Program Book |
Bob Tschirhart |
Experiments
Presentations
|
25 Jul 2013 |
1208-v1 |
PROJECT X INJECTOR EXPERIMENT: GOALS, PLAN, AND STATUS |
Steve Holmes et al. |
Presentations
LE Linac
|
03 Jul 2013 |
1207-v1 |
Modifications of PXIE Shielding Cave |
Jerry Leibfritz |
Presentations
Conventional Facilities
|
24 Jun 2013 |
1206-v1 |
The Conceptual Design of the PXIE Beam Dump. Radiation Shielding and PXIE Complex Enclosure |
Nikolay A. Solyak |
Absorbers
Presentations
|
24 Jun 2013 |
1202-v2 |
Project X Research Program presentation at the 2013 Fermilab Users Meeting |
Bob Tschirhart |
Experiments
Presentations
|
12 Jun 2013 |
1203-v1 |
Project X Accelerator Status: Goals, Status, and Strategy |
Steve Holmes |
Presentations
|
12 Jun 2013 |
1190-v1 |
Project X Colloquium at the University of Washington |
Bob Tschirhart |
Experiments
Presentations
|
11 Jun 2013 |
1198-v1 |
Update on Project X in the Snowmass Process |
Bob Tschirhart |
Experiments
Presentations
|
10 Jun 2013 |
1196-v1 |
650 MHz high beta dressed cavity development plan |
Timergali Khabiboulline et al. |
SRF
CW Linac
HE Linac
Presentations
Cavities and Cryomodules
650 MHz
|
06 Jun 2013 |
1197-v1 |
Fermilab Intensity Frontier Research Program |
Eric J. Prebys |
Experiments
Presentations
|
03 Jun 2013 |
1195-v1 |
Review of the US Intensity Frontier Research Program at the 'Snowmass on the Pacific Meeting' |
Bob Tschirhart |
Experiments
Presentations
|
03 Jun 2013 |
1194-v1 |
Future Fermilab Intensity Frontier Program at the Snowmass ISOUPS meeting |
Bob Tschirhart |
Experiments
Presentations
|
03 Jun 2013 |
1187-v1 |
Current Leads for Project X Cold Magnets |
Thomas J. Peterson |
Cryogenics
Presentations
|
14 May 2013 |
1185-v1 |
Review of CLFV Facilities |
Bob Tschirhart |
Presentations
|
07 May 2013 |
1180-v1 |
Review of DOE Office of Science Facilites Exercise |
Bob Tschirhart |
Experiments
Presentations
|
16 Apr 2013 |
1177-v1 |
Intensity Frontier overview to the March 2013 FRA Visting Committee |
Bob Tschirhart |
Presentations
|
29 Mar 2013 |
1174-v1 |
PXIE RFQ Update |
Derun Li |
Presentations
|
19 Mar 2013 |
1165-v1 |
Power test of a short 50 ohm kicker prototype |
Ding Sun et al. |
Reports
Presentations
|
20 Feb 2013 |
1158-v1 |
MEBT BPM Prototype Flange Assembly Design Presentations |
Matthew L Alvarez |
Presentations
|
18 Feb 2013 |
1137-v1 |
RF Modeling of the Helical Kicker for Project X |
Mohamed H A Hassan et al. |
Instrumentation
Presentations
|
13 Feb 2013 |
1154-v1 |
Project X HEP seminar at Caltech, January 2013 |
Bob Tschirhart |
Experiments
Presentations
|
30 Jan 2013 |
1151-v1 |
PXIE MEBT Bunching Cavity Status Update |
Meiyu Chen et al. |
Presentations
Cavities and Cryomodules
LE Linac
|
18 Jan 2013 |
1147-v1 |
Project-X Beam Transfer to Booster |
Brian E Chase et al. |
Presentations
LE Linac
|
21 Dec 2012 |
1144-v1 |
PXIE MEBT Triplets, Doublets, and Dipole Correctors |
Vladimir Kashikhin |
Reports
Front End
Presentations
Linac
Simulations
|
21 Dec 2012 |
1141-v1 |
Chopper Scenarios for injection into Booster (part 1) |
Brian E Chase et al. |
Presentations
H- Injection
|
18 Dec 2012 |
1139-v1 |
Project X HEP Seminar at University of Wisconsin Dec 2012 |
Bob Tschirhart |
Experiments
Presentations
|
11 Dec 2012 |
1136-v1 |
200 Ohm Chopper Update - Dec. 4, 2012 |
Greg Saewert |
Instrumentation
Presentations
|
04 Dec 2012 |
1131-v1 |
PXIE RFQ Installation & Commissioning Plan |
Vic E Scarpine et al. |
Front End
Presentations
|
29 Nov 2012 |
1135-v1 |
Project X Plans for Snowmass |
Bob Tschirhart |
Experiments
Presentations
|
29 Nov 2012 |
1134-v1 |
Project X Research Program staging plan |
Bob Tschirhart |
Experiments
Presentations
|
29 Nov 2012 |
1133-v1 |
Project X Research Program |
Bob Tschirhart |
Experiments
Presentations
|
29 Nov 2012 |
1121-v2 |
Snowmass strategy briefing to the Fermilab PPD Intensity Frontier department |
Bob Tschirhart |
Experiments
Presentations
|
27 Nov 2012 |
1126-v3 |
PXIE Collaboration Meeting - Ion Source & LEBT |
Lionel R Prost |
Presentations
|
27 Nov 2012 |
1129-v1 |
PXIE LEBT studies at LBNL |
Qing Ji |
Presentations
|
27 Nov 2012 |
1128-v1 |
PXIE RFQ report |
Derun Li |
Presentations
|
27 Nov 2012 |
1127-v1 |
PXIE goals and plan |
Sergei Nagaitsev |
Presentations
|
27 Nov 2012 |
1125-v1 |
Project X presentation to the NuFACT meeting in July 2012 |
Bob Tschirhart |
Experiments
Presentations
|
26 Nov 2012 |
1124-v1 |
Project-X presentation to the CIPANP meeting, May 2012 |
Bob Tschirhart |
Experiments
Presentations
|
26 Nov 2012 |
1123-v1 |
Muon Physics in the Project X era |
Bob Tschirhart |
Experiments
Presentations
|
26 Nov 2012 |
1122-v1 |
Project X outreach presentation at the November 2012 Physics Slam |
Bob Tschirhart |
Experiments
Presentations
|
26 Nov 2012 |
1120-v1 |
Project X Research Program presentation to Fermilab PAC Oct 2012 |
Bob Tschirhart |
Experiments
Presentations
|
26 Nov 2012 |
1115-v2 |
Summary of Recent Research Program Activities |
Bob Tschirhart |
Experiments
Presentations
|
16 Nov 2012 |
1113-v1 |
Project X: Technolgy, Perspectives, and Applications |
Steve Holmes |
Presentations
|
05 Nov 2012 |
1110-v1 |
RFQ coupler |
Sergey Kazakov |
Presentations
LE Linac
|
25 Oct 2012 |
1107-v1 |
PXIE MEBTstatus and plans for FY2013 |
Alexander Shemyakin |
Reports
Front End
Presentations
|
16 Oct 2012 |
1098-v3 |
Proposal for a Phase I PXIE LEBT |
Bruce Hanna et al. |
Experiments
Presentations
Space Charge Effects
|
02 Oct 2012 |
1086-v1 |
MEBT Buncher Cavity pre-Design Review |
Meiyu Chen et al. |
Reviews
Presentations
162.5 MHz
|
19 Jul 2012 |
1078-v1 |
Ion Source and LEBTStatuses |
Lionel R Prost |
Ion Source
Front End
Presentations
LE Linac
|
03 Jul 2012 |
1076-v1 |
Project X Physics Study W&C June 22nd 2012 |
Bob Tschirhart |
Presentations
|
29 Jun 2012 |
1075-v1 |
Summary of Project X Physics Study |
Bob Tschirhart |
Experiments
Presentations
|
29 Jun 2012 |
1073-v1 |
PXIE Machine Protection System |
Jim Steimel et al. |
Accelerator Physics & System Integration
CW Linac
Presentations
|
26 Jun 2012 |
1070-v1 |
Project X Research Program presentation to the June 2012 PAC |
Bob Tschirhart |
Experiments
Presentations
|
19 Jun 2012 |
1069-v2 |
Project X: Accelerator Goals and Challenges |
Steve Holmes |
Presentations
|
16 Jun 2012 |
1063-v1 |
Project X presentation to the May 2012 IPAC meeting |
Bob Tschirhart |
Presentations
|
04 Jun 2012 |
1062-v1 |
Project X presentation to the CIPANP conference |
Bob Tschirhart |
Presentations
|
04 Jun 2012 |
1056-v1 |
Project X chopper update (5/16/12) |
Tao Tang |
Instrumentation
Other Labs
Presentations
Linac
|
16 May 2012 |
1055-v1 |
SLAC Project-X RF Development (May 16 2012) |
Rosa Ciprian et al. |
Other Labs
Presentations
Linac
|
16 May 2012 |
1052-v1 |
Project X and the Endless Frontier |
Bob Tschirhart |
Experiments
Presentations
|
11 May 2012 |
1049-v1 |
Staging Opportunities for Project X |
Steve Holmes |
Presentations
|
08 May 2012 |
1048-v1 |
Summary of Project X interactions with the LBNE reconfiguration study |
Bob Tschirhart |
Friday Meeting
Presentations
|
04 May 2012 |
1046-v1 |
BARC IIFC on Instrumentation - April 2012 Visit Summary |
Gopal Joshi et al. |
Instrumentation
Collaboration
Other Labs
Presentations
|
03 May 2012 |
1037-v1 |
SSR1 Cryomodule Development - Project X Collaboration Meeting - April 10-12, 2012 |
Thomas H. Nicol |
SRF
Presentations
|
13 Apr 2012 |
1036-v1 |
Project X Beta = 0.9, 650 MHz, Cavity and Cryomodule Status |
Thomas J. Peterson |
Cryogenics
SRF
Presentations
|
12 Apr 2012 |
1034-v1 |
PX front end SC cavity design and measurements |
Timergali Khabiboulline |
SRF
Presentations
Cavities and Cryomodules
|
12 Apr 2012 |
1033-v1 |
Cavity Test Stands for Project X |
Andy Hocker |
SRF
Presentations
|
11 Apr 2012 |
1032-v1 |
Cavity Processing Issues for Project X |
Allan M Rowe |
Presentations
|
11 Apr 2012 |
1031-v1 |
PXIE Beam Diagnostics |
Manfred Wendt |
Instrumentation
Presentations
|
11 Apr 2012 |
1029-v2 |
RF Power Sources for PXIE LBNL collaboration meeting |
Ralph J. Pasquinelli |
Presentations
|
11 Apr 2012 |
1022-v3 |
PXIE Vacuum Concept |
Alex Z Chen |
Presentations
|
11 Apr 2012 |
1028-v3 |
200Ohm Chopper R&D Progress |
Greg Saewert |
Instrumentation
Front End
Presentations
|
10 Apr 2012 |
1025-v2 |
PXIE Overview: Goals, Concepts and Planning |
Sergei Nagaitsev |
Presentations
|
09 Apr 2012 |
1026-v2 |
Project X: News, Strategy, Meeting Goals |
Steve Holmes |
Presentations
|
09 Apr 2012 |
1024-v1 |
MEBT Buncher Cavities.Por |
Gennady Romanov |
Presentations
|
08 Apr 2012 |
1023-v1 |
Bunch-by-Bunch Kicker and its Driver: 50 choice |
Ralph J. Pasquinelli et al. |
Instrumentation
Absorbers
Presentations
|
08 Apr 2012 |
1009-v1 |
Updates on Broadband Chopper Driver Development in SLAC (Mar. 2012) |
Tao Tang |
Instrumentation
Other Labs
Presentations
Linac
|
08 Mar 2012 |
1011-v1 |
EM analysis of a helical electrode for a broadband chopper |
Manfred Wendt |
Instrumentation
Presentations
Linac
Simulations
|
08 Mar 2012 |
1010-v1 |
SLAC Project-X RF Development, March 7 2012 |
Rosa Ciprian |
Other Labs
Presentations
Linac
|
08 Mar 2012 |
1006-v4 |
PXIE Accelerator Physics |
Valeri A Lebedev |
Reviews
Presentations
|
06 Mar 2012 |
1007-v2 |
SSR1 cryomodule for PXIE - PXIE review - March 6-7, 2012 |
Thomas H. Nicol |
Reviews
Presentations
|
06 Mar 2012 |
1008-v2 |
PXIE HWR Cryomodule |
Peter N Ostroumov |
Reviews
Presentations
|
05 Mar 2012 |
1005-v1 |
RF Power Sources for PXIE |
Ralph J. Pasquinelli |
Reviews
SRF
Presentations
|
05 Mar 2012 |
1001-v1 |
PXIE Review - Ion Source & LEBT |
Qing Ji et al. |
Reviews
Presentations
|
05 Mar 2012 |
984-v1 |
Beam Diagnostic Instrumentation for PXIE |
Vic E Scarpine |
Instrumentation
Presentations
|
17 Jan 2012 |
972-v1 |
PXIE Vacuum Considerations |
Alex Z Chen et al. |
Presentations
|
21 Dec 2011 |
963-v1 |
Electron Beam Dynamics Simulations for the Proposed Test of the PXIE/Project X MEBT Absorber |
Lionel R Prost et al. |
Experiments
Absorbers
Presentations
Simulations
|
15 Nov 2011 |
959-v1 |
Project X Update |
Steve Holmes |
Presentations
|
09 Nov 2011 |
953-v1 |
Project X: Status and Plans |
Steve Holmes |
Presentations
|
28 Oct 2011 |
950-v1 |
Project X: Status, Strategy, Meeting Goals |
Steve Holmes |
Collaboration
Presentations
|
26 Oct 2011 |
949-v1 |
SSR1 cryomodule for PXIE - Project X collaboration meeting - October 26, 2011 |
Thomas H. Nicol |
Presentations
|
26 Oct 2011 |
944-v1 |
Project X Reference Design andR&D Plan |
Sergei Nagaitsev |
Presentations
|
24 Oct 2011 |
940-v1 |
Project X Pulsed Linac, Overview and plans |
Nikolay A. Solyak |
Presentations
Linac
|
23 Oct 2011 |
937-v1 |
Progress report on fast kicker (cooling version) |
Valeri A Lebedev et al. |
Presentations
|
19 Oct 2011 |
921-v1 |
Front End Test Facility |
Sergei Nagaitsev |
Presentations
|
19 Aug 2011 |
913-v1 |
Notes from the SPL & ESS Collaboration Meeting |
Manfred Wendt |
Presentations
|
08 Jul 2011 |
903-v1 |
Project X Upgrade Options for 4 MW at 8 GeV |
Sergei Nagaitsev |
Presentations
|
05 Jul 2011 |
893-v2 |
Beam chopping for injection into RR/MI |
Sergei Nagaitsev |
Presentations
H- Injection
|
25 May 2011 |
889-v1 |
Design Limitations for MEBT Kicker |
Valeri A Lebedev |
Presentations
|
17 May 2011 |
877-v1 |
Project X: A New Multi-Megawatt Proton Source at Fermilab |
Sergei Nagaitsev |
Presentations
|
05 May 2011 |
874-v1 |
Bandwidth Considerations for the Project X Fast Kicker |
Brian E Chase |
Presentations
|
03 May 2011 |
872-v1 |
SNS/ProjectX Commissioning/Infrastructure |
Willem Blokland |
Operations
Instrumentation
Instabilities
Presentations
Linac
Controls
|
22 Apr 2011 |
871-v1 |
Beam Diagnostics: Requirements |
David E. Johnson et al. |
Instrumentation
Presentations
Linac
|
22 Apr 2011 |
870-v1 |
Beam Diagnostics & Beam Studies at HINS / MDB |
Vic E Scarpine |
Instrumentation
HINS
Presentations
Linac
|
22 Apr 2011 |
869-v1 |
Beam Loss Monitors operating at Cryogenic Temperature with FPGA- Based TDC Signal Processing |
Arden A. Warner et al. |
Instrumentation
Presentations
Linac
|
22 Apr 2011 |
868-v1 |
Propagation and noise experiments for a fiber-delivered laser wire |
John M Byrd et al. |
Instrumentation
Collaboration
Presentations
Linac
|
22 Apr 2011 |
866-v1 |
High Power Fast Faraday Cup R&D |
Craig Deibele et al. |
Instrumentation
Collaboration
Presentations
Linac
|
22 Apr 2011 |
865-v1 |
BPMs as Phase Monitors |
Craig Deibele |
Instrumentation
Collaboration
Presentations
Linac
|
22 Apr 2011 |
864-v1 |
Considerations for FET-based Broadband Chopper Modulator |
Craig Burkhart et al. |
Instrumentation
Collaboration
Presentations
Linac
|
22 Apr 2011 |
863-v1 |
Status of the Kicker R&D for a Broadband Chopper |
Greg Saewert et al. |
Instrumentation
Presentations
Linac
|
22 Apr 2011 |
844-v1 |
Front End WG: Introduction |
Sergei Nagaitsev |
Presentations
|
12 Apr 2011 |
843-v1 |
Project X Reference Design Overview |
Sergei Nagaitsev |
Presentations
|
12 Apr 2011 |
841-v1 |
Project X - A New Multi-MW Proton Source at Fermilab |
Sergei Nagaitsev |
Presentations
|
07 Apr 2011 |
840-v1 |
Project X Cryomodule Configurations |
Thomas H. Nicol |
325 MHz
Cryogenics
Presentations
Cavities and Cryomodules
LE Linac
|
22 Mar 2011 |
832-v1 |
CW Re-Buncher Cavity Design for Project X |
Gennady Romanov |
Presentations
LE Linac
|
09 Mar 2011 |
831-v1 |
FNAL RFQ Studies for Project-X |
Andrey Kolomiets et al. |
Presentations
LE Linac
|
09 Mar 2011 |
834-v1 |
Project X Front End Workshop |
Sergei Nagaitsev |
Presentations
|
09 Mar 2011 |
830-v1 |
Project X Poster at InPAC 2011 |
Jim Kerby |
Project Management
Presentations
|
07 Mar 2011 |
829-v1 |
Project X Overview Talk at InPAC2011 |
Jim Kerby |
Project Management
Presentations
|
07 Mar 2011 |
824-v1 |
650 MHz Cryomodule, Stand-alone TESLA-style |
Thomas J. Peterson |
Cryogenics
HE Linac
Presentations
|
10 Feb 2011 |
823-v1 |
Solenoid Lenses for SSR Cryomodules |
Iouri Terechkine |
HINS
SRF
Presentations
Linac
|
10 Feb 2011 |
816-v1 |
Project X Front-end concept for 162.5 MHz RFQ |
Alexander Vostrikov |
Presentations
Linac
|
04 Feb 2011 |
814-v1 |
Cryomodule Helium Pressure Stability |
Thomas J. Peterson |
Cryogenics
Instabilities
HE Linac
Presentations
|
30 Jan 2011 |
809-v1 |
Design studies of 162.5 MHz RFQ |
Sunny Lalitha sanyasirao Sista venugopal |
Presentations
Linac
LE Linac
|
20 Jan 2011 |
803-v1 |
Project-X Front-End Update |
John Staples |
Front End
Other Labs
Presentations
|
15 Dec 2010 |
802-v1 |
Project X update |
Sergei Nagaitsev |
Presentations
|
14 Dec 2010 |
798-v1 |
Possible Configurations for Prototypes of PX Cryomodules:SSR0 and SSR1 |
Iouri Terechkine |
HINS
SRF
Presentations
Linac
LE Linac
|
10 Dec 2010 |
792-v2 |
Chopping and Limitations to MEBT |
Valeri A Lebedev |
Absorbers
Presentations
LE Linac
Space Charge Effects
Transfer Line
|
03 Dec 2010 |
797-v1 |
Broadband Chopper |
Manfred Wendt |
Presentations
|
03 Dec 2010 |
796-v1 |
Project X: A Multi-MW Proton Source at Fermilab |
Steve Holmes |
Presentations
|
02 Dec 2010 |
793-v1 |
Scenarios with 325 and 162.5 MHz linac bunches |
Sergei Nagaitsev |
Experiments
Presentations
Linac
|
01 Dec 2010 |
786-v1 |
Project-X Presentation to the Fermilab PAC |
Bob Tschirhart |
Presentations
|
13 Nov 2010 |
785-v1 |
Project X: A Multi-MW Proton Source at Fermilab |
Steve Holmes |
Presentations
|
10 Nov 2010 |
783-v1 |
325 MHz Spoke Cavity Status and FY11 Plans |
Bob Webber |
HINS
SRF
Presentations
Linac
LE Linac
|
04 Nov 2010 |
780-v1 |
RF Issues with Configuration Options |
Brian E Chase |
Presentations
|
02 Nov 2010 |
773-v1 |
Front-end R&D Plans - SSR Prototype and Chopper Section |
Bob Webber |
HINS
Presentations
Linac
LE Linac
|
01 Nov 2010 |
770-v1 |
SSR1 Cryomodule Status |
Thomas H. Nicol |
HINS
SRF
Presentations
Linac
LE Linac
|
01 Nov 2010 |
767-v1 |
MEBT Chopper Beam Dump |
Nikolai Mokhov |
HINS
Presentations
Linac
LE Linac
|
27 Oct 2010 |
750-v1 |
Integration of the SSR cryomodules into the Project X cryo system and implications for the SSR1 prototype |
Thomas J. Peterson |
Cryogenics
Presentations
|
30 Sep 2010 |
748-v1 |
IIFC on Instrumentation and Controls |
TS Ananthakrishnan et al. |
Instrumentation
Other Labs
Presentations
Linac
Controls
|
24 Sep 2010 |
706-v1 |
RF Controls Strategies |
Brian E Chase |
Presentations
LLRF
|
08 Sep 2010 |
715-v2 |
ESS Opportunities |
Andreas Jansson |
Instrumentation
Other Labs
Presentations
|
08 Sep 2010 |
713-v3 |
Laser Diagnostics |
John M Byrd et al. |
Instrumentation
Other Labs
Presentations
|
08 Sep 2010 |
721-v2 |
Project X: Status, Strategy, Meeting Goals |
Steve Holmes |
Collaboration
Presentations
|
08 Sep 2010 |
704-v1 |
MOSFET Chopper |
Tao Tang |
HINS
Other Labs
Presentations
Linac
|
07 Sep 2010 |
725-v2 |
FRIB Instrumentation |
Saeed Assadi |
Instrumentation
Other Labs
Presentations
|
07 Sep 2010 |
731-v1 |
RFQ Activities in India |
Sunny Lalitha sanyasirao Sista venugopal |
Collaboration
Presentations
Linac
LE Linac
|
07 Sep 2010 |
678-v1 |
SNS Diagnostics |
John D Galambos |
Other Labs
Presentations
|
07 Sep 2010 |
714-v0 |
SNS Activities |
Willem Blokland |
None
|
04 Sep 2010 |
716-v1 |
H- Ion Source for Project X |
Qing Ji |
Ion Source
Presentations
Linac
LE Linac
|
07 Sep 2010 |
659-v1 |
Laser Chopper for Project X |
David E. Johnson |
Presentations
|
03 Sep 2010 |
657-v1 |
Third Report on SSR1-01 RF Results in MDB Cryostat and Power Coupler Qext Calculations |
Timergali Khabiboulline |
HINS
SRF
Presentations
Linac
LE Linac
|
27 Aug 2010 |
654-v2 |
HINS Report for DOE Site Visit - B&R Code KA15-02-011_August_23_2010 |
Bob Webber |
HINS
SRF
Presentations
Linac
LE Linac
|
23 Aug 2010 |
650-v1 |
SSR1 cold test - FAST/SLOW TUNER - first data |
Yuriy Pischalnikov |
HINS
SRF
Presentations
Linac
LE Linac
|
20 Aug 2010 |
642-v1 |
Optimization of Wire Scanner position for HINS Energy Spread Measurement |
Eliana Gianfelice-Wendt |
Instrumentation
HINS
Presentations
Simulations
LE Linac
|
04 Aug 2010 |
635-v4 |
Project-X presentation for ICHEP |
Bob Tschirhart |
Presentations
|
02 Aug 2010 |
633-v1 |
HINS Six-Cavity Test Presentation to PX Front-End Meeting |
Bob Webber |
HINS
Presentations
LE Linac
|
07 Jul 2010 |
630-v1 |
Analysis of CC2 data at 4K |
Gustavo I Cancelo |
Presentations
Controls
LLRF
|
30 Jun 2010 |
620-v1 |
Project X: A multi-MW Proton Source at Fermilab |
Steve Holmes |
Presentations
|
06 Jun 2010 |
617-v1 |
PX_solyak_lattice_front-end_in_HINS_Cave |
Bob Webber |
HINS
Presentations
LE Linac
|
26 May 2010 |
600-v3 |
An Estimate of Orbit Correction for SSR0 section of the Project X |
Valeri A Lebedev |
HINS
Presentations
Linac
|
12 May 2010 |
598-v1 |
HINS Beam Absorber MARS15 Simulations (extended) |
Nikolai Mokhov |
HINS
Absorbers
Presentations
|
30 Apr 2010 |
450-v3 |
Project X CW linac design |
Nikolay A. Solyak |
Presentations
Linac
|
26 Mar 2010 |
447-v2 |
Project X Update |
Vyacheslav P. Yakovlev et al. |
Presentations
Linac
|
24 Mar 2010 |
452-v1 |
Using Booster, Switchyard and MI-8 in Project X |
Robert M. Zwaska et al. |
Presentations
|
20 Mar 2010 |
451-v1 |
Project X Status and Strategy |
Steve Holmes |
Presentations
|
17 Mar 2010 |
449-v1 |
The Front-End System Study of Project X |
Derun Li |
Presentations
|
16 Mar 2010 |
448-v1 |
Project X Status Report |
Sergei Nagaitsev |
Presentations
|
16 Mar 2010 |
442-v1 |
A Multi-Stripline Chopper with individual MOSFET Drivers |
Manfred Wendt |
Instrumentation
Presentations
Linac
|
02 Mar 2010 |
441-v2 |
Options for Locating 325MHz Cryomodule Test Stand at MDB |
Bob Webber |
HINS
Presentations
|
24 Feb 2010 |
438-v1 |
Project X: A multi-MW Proton Source at Fermilab |
Steve Holmes |
Presentations
|
16 Feb 2010 |
430-v1 |
Design concepts for a pulsed multi-GeV H¯ LINAC |
Peter N Ostroumov |
HINS
Presentations
Linac
|
03 Feb 2010 |
426-v1 |
HINS Possibilities for Project X, January 2010 |
Bob Webber |
Instrumentation
HINS
SRF
Presentations
|
26 Jan 2010 |
416-v1 |
Lifetime of Stark States Hydrogen Atom in Magnetic Field Calculation and Estimation of Losses at Stripping Injection |
Alexandr Drozhdin et al. |
Main Injector
Presentations
RCS
|
20 Jan 2010 |
421-v1 |
Overview of proton drivers for neutrino super beams and neutrino factories |
Weiren Chou |
Main Injector
Presentations
Linac
RCS
|
20 Jan 2010 |
352-v1 |
Project X: A multi-MW Proton Source at Fermilab |
Steve Holmes |
Presentations
|
07 Jan 2010 |
335-v1 |
Design and Engineering Limitations for SSR1 Cavities and Cryomodules |
Thomas H. Nicol |
Presentations
LE Linac
|
16 Dec 2009 |
334-v1 |
Project X Linac: Beam Preparation and Distribution |
Iouri Terechkine et al. |
Presentations
LE Linac
|
09 Dec 2009 |
330-v1 |
SPL Meeting impressions |
Vyacheslav P. Yakovlev |
Presentations
Linac
|
25 Nov 2009 |
327-v1 |
Project X: A multi-MW Proton Source at Fermilab |
Steve Holmes |
Presentations
|
05 Nov 2009 |
278-v2 |
RFQ Studies |
John Staples |
Collaboration
Presentations
LE Linac
|
12 Sep 2009 |
306-v1 |
325 MHz Couplers |
Timergali Khabiboulline |
Collaboration
Presentations
LE Linac
|
12 Sep 2009 |
305-v1 |
1.3 GHz Couplers |
Chris Adolphsen |
Collaboration
HE Linac
Presentations
|
12 Sep 2009 |
304-v1 |
Triple Spoke Cavities for a CW Linac |
Peter N Ostroumov |
Collaboration
Presentations
LE Linac
|
12 Sep 2009 |
303-v1 |
Linac Design: Single Spoke Cavities |
Vyacheslav P. Yakovlev |
Collaboration
Presentations
LE Linac
|
12 Sep 2009 |
302-v1 |
Front End |
Derun Li |
Collaboration
Presentations
LE Linac
|
12 Sep 2009 |
301-v1 |
Overall Linac Design, 1.3 GHz Cavities |
Nikolay A. Solyak |
Collaboration
HE Linac
Presentations
|
12 Sep 2009 |
300-v1 |
RF Working Group Summary |
Leigh Harwood et al. |
Collaboration
HE Linac
Presentations
LE Linac
LLRF
|
12 Sep 2009 |
299-v1 |
RCS and Transfer Line WG Summary |
David E. Johnson et al. |
Collaboration
Presentations
RCS
Transfer Line
|
12 Sep 2009 |
295-v2 |
Summary Instrumentation & Controls Working Group |
Willem Blokland |
Instrumentation
Presentations
Controls
|
12 Sep 2009 |
297-v1 |
Cavities and Cryomodules Working Group Summary |
Mark Champion |
SRF
Presentations
|
12 Sep 2009 |
298-v2 |
Cryomodule Development at Fermilab |
Donald Mitchell |
SRF
Presentations
|
12 Sep 2009 |
294-v2 |
Linac WG summary |
Sergei Nagaitsev |
Collaboration
Presentations
Linac
|
12 Sep 2009 |
277-v2 |
Project X ICD-1 and ICD-2 Overview |
Sergei Nagaitsev |
Collaboration
Presentations
|
12 Sep 2009 |
264-v3 |
xTCA for Physics Standards - Progress & Applications Summary for Project X Collaboration |
Ray Larsen |
Instrumentation
Presentations
Controls
|
12 Sep 2009 |
291-v2 |
Longitudinal Laser Wire for Project X / HINS |
John M Byrd |
Instrumentation
Presentations
|
12 Sep 2009 |
281-v2 |
MI/RR Space Charge Simulations with Synergia |
James F Amundson et al. |
Collaboration
Main Injector
Presentations
Simulations
Space Charge Effects
|
11 Sep 2009 |
258-v2 |
Cryomodule design changes for ICD-2 |
Arkadiy Klebaner |
Presentations
|
11 Sep 2009 |
284-v5 |
RCS High Power RF System |
John S Reid |
Presentations
|
11 Sep 2009 |
282-v1 |
Project X Control System |
Jim Patrick |
Presentations
Controls
|
11 Sep 2009 |
270-v3 |
Linac Design - Chopper Ideas |
Bob Webber |
Presentations
Linac
|
11 Sep 2009 |
279-v1 |
HINS as a Beam Diagnostics Test Facility |
Vic E Scarpine |
Instrumentation
Presentations
|
11 Sep 2009 |
273-v1 |
RCS for Project-X |
Valeri A Lebedev |
Presentations
Space Charge Effects
|
11 Sep 2009 |
271-v1 |
Project X Physics Program Review |
Bob Tschirhart |
Collaboration
Presentations
|
11 Sep 2009 |
262-v1 |
Fermi Timing Systems and Project X |
Gregory L. Vogel |
Instrumentation
Presentations
Controls
|
10 Sep 2009 |
266-v1 |
Bunch Shape Monitor for HINS |
Wai-Ming Tam |
Instrumentation
Presentations
|
10 Sep 2009 |
268-v1 |
E-Beam Scanner R&D |
Randy M Thurman-Keup |
Instrumentation
Presentations
|
10 Sep 2009 |
265-v1 |
Experience on SNS Beam Instrumentation Collaborations |
Willem Blokland |
Instrumentation
Presentations
Controls
|
10 Sep 2009 |
263-v1 |
Collaboration Opportunities on Project X Beam Instrumentation |
Manfred Wendt |
Instrumentation
Presentations
|
10 Sep 2009 |
253-v3 |
Review Transfer/Injection R&D Plan Siting Issues |
David E. Johnson |
Collaboration
Presentations
Transfer Line
|
10 Sep 2009 |
261-v1 |
Design Considerations for CW SRF Linacs |
Arkadiy Klebaner et al. |
Cryogenics
Presentations
|
10 Sep 2009 |
259-v1 |
Project X ICD-2 Cryogenic System Overview |
Jay C. Theilacker |
Cryogenics
Presentations
|
10 Sep 2009 |
250-v5 |
Project X: Introduction, Strategy, and Collaboration Meeting Goals |
Steve Holmes |
Presentations
|
10 Sep 2009 |
251-v1 |
Project X ICD-1 Cryogenics and associated RD&D Plan Overview |
Arkadiy Klebaner |
Cryogenics
Presentations
|
10 Sep 2009 |
252-v1 |
J-PARC RCS Injection Issues |
Pranab K Saha |
Collaboration
Other Labs
Absorbers
Presentations
H- Injection
|
10 Sep 2009 |
249-v1 |
Deflecting Cavity for the Beam RF Splitter |
Vyacheslav P. Yakovlev |
SRF
Presentations
Transfer Line
|
01 Sep 2009 |
248-v1 |
Project X: A multi-MW Proton Source at Fermilab |
Steve Holmes |
Presentations
|
31 Aug 2009 |
247-v1 |
Project X ICD2 briefing |
Sergei Nagaitsev |
Presentations
|
21 Aug 2009 |
227-v1 |
HINS Status Report for June 19, 2009 Project X Meeting |
Bob Webber |
HINS
Presentations
|
19 Jun 2009 |
221-v1 |
ACD proton front end |
Sergei Nagaitsev |
Presentations
LE Linac
|
17 Jun 2009 |
218-v2 |
Project X: A multi-MW Proton Source at Fermilab |
Steve Holmes |
Presentations
|
14 Jun 2009 |
216-v1 |
Project-X ACD write-up |
Valeri A Lebedev |
Basis of Estimate
Presentations
|
02 Jun 2009 |
211-v2 |
Project X at Fermilab: Prospects and Plans |
Steve Holmes |
Presentations
|
08 May 2009 |
21-v1 |
High Energy Linac Overview |
Sergei Nagaitsev |
HE Linac
Presentations
|
23 Apr 2009 |
108-v1 |
Beam physics, linac lattice |
Peter N Ostroumov |
Presentations
Linac
|
23 Apr 2009 |
137-v1 |
Fermilab proposal for the PrX Linac RF distribution |
Oleg Nezhevenko |
Presentations
Linac
|
23 Apr 2009 |
138-v1 |
CERN interests/views |
Roland Garoby |
Presentations
Linac
|
23 Apr 2009 |
139-v1 |
LLRF and other activities (LBNL) |
Lawrence Doolittle |
Presentations
Linac
|
23 Apr 2009 |
98-v1 |
Present details of transfer line and injection ICD |
David E. Johnson |
Recycler
Presentations
|
23 Apr 2009 |
99-v1 |
Recycler Lattice |
Meiqin Xiao |
Recycler
Presentations
|
23 Apr 2009 |
100-v1 |
Transverse phase space painting |
Alexandr Drozhdin et al. |
Recycler
Presentations
|
23 Apr 2009 |
101-v1 |
Laser stripping |
Robert M. Zwaska |
Presentations
H- Injection
|
23 Apr 2009 |
102-v1 |
Injection absorber design |
Igor L Rakhno et al. |
Presentations
H- Injection
|
23 Apr 2009 |
103-v1 |
Footprint and Siting Issues |
David E. Johnson |
Recycler
Presentations
|
23 Apr 2009 |
104-v1 |
PS2 Injection: thoughts and concerns |
Brennan Goddard |
Recycler
Presentations
|
23 Apr 2009 |
88-v1 |
Px Overview/Goals of working grp/elliptical cav. |
Robert D Kephart |
SRF
Presentations
|
23 Apr 2009 |
89-v1 |
FNAL program and ANL/FNAL infrastructure |
Shekar Mishra |
SRF
Presentations
|
23 Apr 2009 |
112-v1 |
Superconducting Accelerator Segmentation Overview |
Jay C. Theilacker |
Cryogenics
Presentations
|
23 Apr 2009 |
181-v2 |
Project X Directors Review - Controls |
Jim Patrick |
Basis of Estimate
Presentations
Controls
Directors Reviews
|
16 Mar 2009 |
190-v1 |
PX Dir Review 8 GeV Transport Line Components |
David E. Johnson |
Basis of Estimate
Presentations
Directors Reviews
Transfer Line
|
15 Mar 2009 |
189-v1 |
PX Dir Review 8 GeV Injection Components |
David E. Johnson |
Basis of Estimate
Presentations
Directors Reviews
H- Injection
|
15 Mar 2009 |
188-v2 |
Project Management Overview - Director's Review |
Steve Holmes |
Presentations
Directors Reviews
|
15 Mar 2009 |
175-v2 |
PX Dir Review 8 GeV level 2 Overview |
David E. Johnson |
Presentations
Directors Reviews
Transfer Line
H- Injection
|
15 Mar 2009 |
176-v2 |
Introduction and Overview - Director's Cost Review |
Steve Holmes |
Presentations
Directors Reviews
|
13 Mar 2009 |
178-v1 |
Project X: Initial Configuration |
Paul Derwent |
Instrumentation
HINS
Cryogenics
Main Injector
Recycler
Presentations
Linac
Controls
Directors Reviews
Transfer Line
Conventional Facilities
|
13 Mar 2009 |
129-v1 |
JLab interests and capabilities |
Andrew Hutton |
SRF
Presentations
|
24 Feb 2009 |
147-v1 |
PrX SC quads/solenoids |
Michael A Tartaglia |
Presentations
Linac
|
24 Feb 2009 |
128-v1 |
SLAC interest in Px RF equipment (dist, klystrons, modulators), RF R&D needed |
Chris Adolphsen |
Presentations
Linac
|
24 Feb 2009 |
127-v1 |
HINS Solenoids Head Load |
Thomas M. Page |
Cryogenics
Presentations
|
24 Feb 2009 |
126-v1 |
NML Cryogenic System Overview |
Alexander Martinez |
Cryogenics
Presentations
|
24 Feb 2009 |
125-v1 |
The 1.3 GHzCryomodule Heat Load |
Thomas J. Peterson |
Cryogenics
Presentations
|
24 Feb 2009 |
124-v1 |
MI Collimation experience |
Bruce C. Brown |
Main Injector
Presentations
|
24 Feb 2009 |
123-v1 |
Review of MI e-cloud simulations |
Miguel A Furman |
Main Injector
Presentations
|
24 Feb 2009 |
122-v1 |
MI e-cloud measurements |
Robert M. Zwaska |
Main Injector
Presentations
|
24 Feb 2009 |
121-v1 |
How to design/build top loaded cryostats |
Joel D. Fuerst |
Cryogenics
Presentations
|
24 Feb 2009 |
120-v1 |
Cornell interests and capabilities |
Maury Tigner |
Presentations
Linac
|
24 Feb 2009 |
119-v1 |
SLAC proposals for PrX (1.3) couplers |
Chris Adolphsen |
Presentations
Linac
|
24 Feb 2009 |
140-v1 |
PrX coupler requirements |
Nikolay A. Solyak et al. |
Presentations
Linac
|
24 Feb 2009 |
118-v1 |
ANL interests and capabilities (spokes + ellipticals) |
Michael P. Kelly |
SRF
Presentations
|
24 Feb 2009 |
117-v1 |
Intro to PrX front end/Low Beta Cavities |
Bob Webber |
Presentations
LE Linac
|
24 Feb 2009 |
116-v1 |
Linac lattice requirements on cryomodules |
Peter N Ostroumov |
Presentations
Linac
Conventional Facilities
|
24 Feb 2009 |
115-v1 |
Present initial draft of RD&D plan |
David E. Johnson |
Recycler
Presentations
|
24 Feb 2009 |
114-v1 |
Present current R&D issues |
David E. Johnson |
Recycler
Presentations
|
24 Feb 2009 |
113-v1 |
SRF Pressure Safety at Fermilab |
Thomas H. Nicol |
Cryogenics
SRF
Presentations
|
24 Feb 2009 |
111-v1 |
Potential Cryogenic Cycles |
Dana Arenius |
Presentations
Conventional Facilities
|
24 Feb 2009 |
110-v1 |
Project X Cryogenic System Overview |
Arkadiy Klebaner |
Cryogenics
Presentations
|
24 Feb 2009 |
109-v1 |
Presentation of possible Project X Beam Instrumentation R&D projects |
Vic E Scarpine et al. |
Instrumentation
Presentations
|
24 Feb 2009 |
92-v1 |
India interest in beta = 0.8 CM and capabilities |
V. Sahni |
SRF
Presentations
|
24 Feb 2009 |
91-v1 |
India interest in Spoke resonators |
A. Roy |
SRF
Presentations
|
24 Feb 2009 |
107-v1 |
Experience with the RHIC yt-jump system |
Thomas Roser |
Main Injector
Presentations
|
24 Feb 2009 |
105-v1 |
Review of MI Issues |
Ioanis Kourbanis |
Main Injector
Presentations
|
24 Feb 2009 |
106-v1 |
New rf system requirements/preliminary design |
John S Reid |
Main Injector
Presentations
|
24 Feb 2009 |
143-v1 |
Accelerator Issues of Project X 8/7/2007 |
Dave McGinnis |
Reports
Presentations
Linac
|
28 Jan 2009 |
90-v1 |
MSU on Beta = 0.8 R&D so far, what is needed, and interests |
Richard York |
SRF
Presentations
|
17 Dec 2008 |
97-v1 |
A Personal View of Beam Instrumentation Collaborations |
Manfred Wendt |
Instrumentation
Presentations
|
02 Dec 2008 |
95-v2 |
Overview of SNS Beam Instrumentation (Incl. Collaboration Aspects) |
Willem Blokland |
Instrumentation
Presentations
|
02 Dec 2008 |
96-v1 |
HINS Beam Instrumentation R&D |
Vic E Scarpine |
Instrumentation
Presentations
|
02 Dec 2008 |
94-v1 |
Project X Initial Configuration Overview |
Paul Derwent |
Presentations
|
02 Dec 2008 |
93-v1 |
Project X Introduction, Strategy, and Collaboration Goals |
Steve Holmes |
Presentations
|
02 Dec 2008 |
84-v2 |
XYZ |
Valeri A Lebedev et al. |
Presentations
|
25 Nov 2008 |
87-v1 |
Project X Presentation to Linear Collider Workshop 11-16-08 |
Steve Holmes |
Presentations
|
17 Nov 2008 |
86-v1 |
Project X Talk to HEPAP 11-13-08 |
Steve Holmes |
Presentations
|
14 Nov 2008 |
82-v1 |
AP&T Seminar 30 Oct 08 on the ICD |
Paul Derwent |
Project Management
Presentations
|
30 Oct 2008 |
78-v1 |
120 GeV Targeting |
James Hylen |
Reviews
Targetting
Presentations
|
07 Oct 2008 |
77-v1 |
Recycler 8.9 GeV/c Extraction |
David E. Johnson |
Reviews
Recycler
Presentations
|
07 Oct 2008 |
76-v1 |
Project X Main Injector |
Valeri A Lebedev |
Reviews
Main Injector
Presentations
|
07 Oct 2008 |
75-v1 |
Project-X Related Issues in Recycler |
Alexander A Valishev |
Reviews
Recycler
Presentations
|
07 Oct 2008 |
74-v1 |
Project X: 8 GeV Recycler Injection |
David E. Johnson |
Reviews
Presentations
H- Injection
|
07 Oct 2008 |
73-v1 |
Project X Linac |
Giorgio Apolinari |
Reviews
Presentations
Linac
|
07 Oct 2008 |
72-v1 |
Project X Overview |
Dave McGinnis |
Reviews
Presentations
|
07 Oct 2008 |
67-v1 |
Issues and Challenges of High Power Targets for Muon Colliders |
Kirk T McDonald |
Targetting
Presentations
|
01 Oct 2008 |
66-v1 |
Experimental Radiation Damage Assessment of High Power Accelerator Targets |
Nikolaos Simos |
Targetting
Presentations
|
01 Oct 2008 |
65-v1 |
Issues with Liquid vs. Solid Targets |
John C Sheppard |
Targetting
Presentations
|
01 Oct 2008 |
64-v1 |
IHEP 2 Megawatt Target Design |
James Hylen |
Targetting
Presentations
|
01 Oct 2008 |
63-v1 |
High Power Targets for Project X and Beyond |
Kirk T McDonald |
Targetting
Presentations
|
01 Oct 2008 |
62-v1 |
Activation and Remote Handling |
John C Sheppard |
Targetting
Presentations
|
01 Oct 2008 |
61-v1 |
Engineering Issues for the NuMI Beamline at 2 MW |
Patrick G Hurh |
Targetting
Presentations
|
01 Oct 2008 |
60-v1 |
Modeling of Ring Performance |
Robert D Ryne |
Main Injector
Recycler
Presentations
Simulations
|
01 Oct 2008 |
59-v1 |
Injection and Extraction |
David E. Johnson |
Main Injector
Recycler
Presentations
Transfer Line
|
01 Oct 2008 |
58-v1 |
Transverse Damper |
Phil Adamson |
Main Injector
Instabilities
Recycler
Presentations
|
01 Oct 2008 |
57-v1 |
RF System and Beam Loading Compensation |
John S Reid |
Main Injector
Recycler
Presentations
|
01 Oct 2008 |
56-v1 |
Transition Crossing Simulations |
Ioanis Kourbanis |
Main Injector
Presentations
Simulations
|
01 Oct 2008 |
55-v1 |
Gamma Transition Jump |
Weiren Chou et al. |
Main Injector
Presentations
|
01 Oct 2008 |
54-v1 |
Present MI Operation and Near Future Plans |
Ioanis Kourbanis |
Operations
Main Injector
Presentations
|
01 Oct 2008 |
53-v1 |
SNS Laser Stripping Development |
Aleksandrov V Aleksandrov |
Other Labs
Presentations
H- Injection
|
01 Oct 2008 |
52-v1 |
Transfer lines, H- stripping and injection |
Deepak Raparia |
Presentations
Transfer Line
H- Injection
|
01 Oct 2008 |
51-v1 |
Present RR operation |
Consolato Gattuso |
Operations
Recycler
Presentations
|
01 Oct 2008 |
50-v1 |
Beam Loss and Collimation |
Nikolai Mokhov |
Main Injector
Absorbers
Presentations
|
01 Oct 2008 |
49-v1 |
Electron Cloud, EP Instability and Requirements for Vacuum |
Miguel A Furman |
Main Injector
Instabilities
Recycler
Presentations
|
01 Oct 2008 |
48-v1 |
Theoretical Expectations for Instabilities |
Alexey V Burov |
Main Injector
Instabilities
Recycler
Presentations
|
01 Oct 2008 |
47-v1 |
Experimental Observations of Instabilities at Main Injector |
Ioanis Kourbanis |
Main Injector
Instabilities
Presentations
|
01 Oct 2008 |
45-v1 |
Linac Instrumentation |
Nathan Eddy |
Instrumentation
Presentations
Linac
|
01 Oct 2008 |
44-v1 |
Electron source at a 2-GeV location |
Philippe Piot |
Presentations
Linac
|
01 Oct 2008 |
43-v1 |
MSU Collaboration Report - Beta 0.8 Cavities |
Walter Hartung |
Other Labs
Presentations
Linac
|
01 Oct 2008 |
42-v1 |
Automated Linac Re-tuning |
John D Galambos |
Presentations
Linac
|
01 Oct 2008 |
41-v1 |
PrX Civil Construction and Layout |
Dixon Bogert |
Presentations
Linac
Conventional Facilities
|
01 Oct 2008 |
40-v1 |
Cryo Systems Needed for Project X |
Arkadiy Klebaner |
Cryogenics
Presentations
Linac
|
01 Oct 2008 |
39-v1 |
Berkeley Collaboration Report - Buncher Cavities and LLRF |
Alessandro Ratti |
Other Labs
Presentations
LE Linac
|
01 Oct 2008 |
38-v1 |
Brookhaven Collaboration Report - Instrumentation |
Roger Connolly |
Instrumentation
Other Labs
Presentations
LE Linac
|
01 Oct 2008 |
37-v1 |
Argonne Collaboration Report - Accelerator Physics and Spoke Cavities |
Donald F Geesaman |
Other Labs
Presentations
LE Linac
|
01 Oct 2008 |
36-v1 |
History of SNS Design and Decisions |
Robert L Kustom |
Other Labs
Presentations
LE Linac
|
01 Oct 2008 |
35-v1 |
LLRF Challenges |
Brian E Chase |
HE Linac
Presentations
|
01 Oct 2008 |
34-v1 |
RF Distribution for Project X |
Christopher Nantista |
HE Linac
Presentations
|
01 Oct 2008 |
33-v1 |
Project X and ILC: Differences and Similarities |
Chris Adolphsen |
HE Linac
Presentations
|
01 Oct 2008 |
31-v1 |
SC Spoke Cavity Design and Status |
Timergali Khabiboulline |
Presentations
LE Linac
|
01 Oct 2008 |
32-v1 |
Superconducting Solenoid Design |
Iouri Terechkine |
Presentations
LE Linac
|
01 Oct 2008 |
30-v1 |
Room Temperature Cavity Design |
Gennady Romanov |
Presentations
LE Linac
|
30 Sep 2008 |
29-v1 |
325 MHz RF Distribution |
Alfred Moretti |
Presentations
LE Linac
|
30 Sep 2008 |
28-v1 |
SNS Superconducting Linac operating experience and issues |
Isidoro E Campisi |
Other Labs
Presentations
Linac
|
30 Sep 2008 |
27-v1 |
What It Will Take to Produce 1 Cryomodule per Month |
Robert D Kephart |
Cryogenics
Presentations
|
30 Sep 2008 |
24-v1 |
120 GeV Targeting Overview |
James Hylen |
Targetting
Presentations
|
30 Sep 2008 |
23-v1 |
Main Injector Overview |
Valeri A Lebedev |
Main Injector
Presentations
|
30 Sep 2008 |
22-v1 |
Recycler Overview |
Alexander A Valishev |
Recycler
Presentations
|
30 Sep 2008 |
20-v1 |
Low Energy Linac Overview |
Bob Webber |
Presentations
LE Linac
|
30 Sep 2008 |
19-v1 |
Project X Overview |
Dave McGinnis |
Presentations
|
30 Sep 2008 |
18-v1 |
Introductory Remarks |
Steve Holmes |
Presentations
|
30 Sep 2008 |