1344-v0 |
PXIE LEBT and MEBT Toroids for measurement of the beam loss in RFQ FRS |
Vic E Scarpine et al. |
Instrumentation
Front End
Instrumentation
|
05 Dec 2014 |
1224-v1 |
Functional Requirement Specification (FRS) PXIE MEBT BPM at the initial stage |
Alexander Shemyakin |
Front End
|
09 Oct 2013 |
1173-v3 |
Project X and PXIE LEBT Scraper FRS |
Lionel R Prost |
Front End
Instrumentation
|
09 Apr 2013 |
1164-v3 |
650 MHz Beta=0.9 Cavity Functional Requirements Specification |
Timergali Khabiboulline |
650 MHz
Requirements and Specifications
Cavities and Cryomodules
|
12 Mar 2013 |
1163-v2 |
PXIE LEBT Chopper FRS |
Lionel R Prost et al. |
Absorbers
Front End
|
13 Feb 2013 |
1160-v5 |
Project X & PXIE LEBT/RFQ Interface Functional Requirement Specification |
Lionel R Prost |
Front End
|
22 Mar 2013 |
1079-v2 |
325 MHz SSR1 Cavity Functional Requirements Specification (FRS) |
Leonardo Ristori |
SRF
325 MHz
SRF Specifications
Requirements and Specifications
|
09 Jul 2012 |
1077-v0 |
PXIE LEBT Beam Transverse Emittance Station FRS |
Vic E Scarpine |
Instrumentation
|
03 Jul 2012 |
1071-v1 |
FRS for Bunching cavity for PXIE MEBT draft 1.5 |
Timergali Khabiboulline et al. |
Requirements and Specifications
|
22 Jun 2012 |
980-v4 |
PXIE Functional Requirements Specification |
Sergei Nagaitsev |
Accelerator Physics & System Integration
|
03 Feb 2012 |
977-v1 |
PXIE MEBT kicker specifications |
Valeri A Lebedev et al. |
LE Linac
Front End
|
20 Dec 2011 |
968-v5 |
Project X and PXIE Ion Source Functional Requirement Specifications |
Qing Ji et al. |
Requirements and Specifications
Front End
|
22 Mar 2013 |
964-v1 |
Functional specifications for PXIE MEBT absorber |
Alexander Shemyakin |
LE Linac
Requirements and Specifications
Front End
|
19 Dec 2011 |
938-v3 |
Functional specifications for PXIE MEBT |
Valeri A Lebedev et al. |
Requirements and Specifications
Front End
|
25 Jun 2012 |
933-v5 |
PXIE MEBT quadrupoles specifications |
Alexander Shemyakin |
LE Linac
Requirements and Specifications
|
24 Sep 2012 |
931-v3 |
Preliminary HW and SSR1 Cryomodule Functional Requirements Specifications for PXIE |
Thomas H. Nicol |
325 MHz
|
07 Oct 2011 |
912-v7 |
Functional Requirement Specification - Project X and PXIE Low Energy Beam Transport Section |
Lionel R Prost |
Requirements and Specifications
Front End
|
22 Mar 2013 |
894-v9 |
Project X RFQ: functional physics requirements |
Sergei Nagaitsev et al. |
Requirements and Specifications
Front End
|
11 Feb 2013 |
885-v4 |
650 MHz Beta=0.9 Cryomodule Functional Requirements Specification |
Thomas H. Nicol |
Cryogenics
650 MHz
Cavities and Cryomodules
Requirements and Specifications
HE Linac
|
20 Feb 2013 |
794-v1 |
325 MHz Spoke Cavity Prototype Cryomodule Functional Requirements Specification |
Bob Webber |
SRF
Linac
Cavities and Cryomodules
Front End
HINS
CW Linac
LE Linac
SRF Specifications
|
01 Dec 2010 |
787-v5 |
325 MHz Cavity Test Cryostat 2K Conversion Functional Requirements Specification |
Thomas H. Nicol |
SRF
Presentations
Linac
HINS
325 MHz
LE Linac
Requirements and Specifications
|
18 May 2011 |
658-v8 |
Project X Functional Requirements Specification, Draft version 4.12 |
Stuart D Henderson et al. |
Requirements and Specifications
|
17 Oct 2011 |
1370-v3 |
The PIP-II Reference Design Rep |
Valeri A Lebedev |
Linac
Reports
Main Injector
|
21 May 2015 |
1371-v3 |
IPAC-15 Summary for PIP-II |
Valeri A Lebedev et al. |
Linac
|
29 Apr 2015 |
1327-v4 |
Controls for PXIE and PIP-II |
Jim Patrick |
Controls
Presentations
|
07 Oct 2014 |
1259-v1 |
Design and Testing of a Prototype Beam Absorber for the PXIE MEBT |
Curtis Baffes et al. |
Reports
LE Linac
|
06 Feb 2014 |
1232-v3 |
Proton Improvement Plan-II |
Paul Derwent et al. |
Reports
|
12 Dec 2013 |
1217-v3 |
PXIE Instrumentation Update |
Vic E Scarpine |
Instrumentation
|
27 Aug 2013 |
967-v1 |
Project X HWR Functional Specification |
Jim Kerby |
Requirements and Specifications
|
23 Aug 2013 |
1209-v2 |
Summary of Project X Research Program Book |
Bob Tschirhart |
Experiments
Presentations
|
25 Jul 2013 |
776-v7 |
Reference Design Report |
Russ Alber et al. |
Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
Cryogenics
Absorbers
Reports
Main Injector
|
17 Jul 2013 |
1200-v6 |
Project X Broader Impacts volume of the Project X Book |
Stuart D Henderson et al. |
Experiments
Reports
|
17 Jul 2013 |
1199-v8 |
Project X Research Program volume of the Project X Book |
Andreas Kronfeld et al. |
Experiments
Reports
|
17 Jul 2013 |
1186-v5 |
Evaluation of Tritium Generation in the Soil under the PXIE Beam Dump (Problem of the Groundwater Activation) |
Yury I Eidelman |
Absorbers
|
24 Jun 2013 |
1145-v2 |
Project-X Synchronous Transfers to Booster or Recycler |
Brian E Chase |
LLRF
|
21 Dec 2012 |
1126-v3 |
PXIE Collaboration Meeting - Ion Source & LEBT |
Lionel R Prost |
Presentations
|
27 Nov 2012 |
1100-v2 |
Measurements of the electron beam size at the absorber prototype test bench |
Anna Mitskovets |
Experiments
Absorbers
|
03 Oct 2012 |
1091-v2 |
Sputtering of Materials for MEBT Absorber and PXIE Beam Dump |
Yury I Eidelman |
Absorbers
|
02 Aug 2012 |
1081-v2 |
200 Ohm Chopper System Progress - July 2012 |
Greg Saewert |
Instrumentation
|
11 Jul 2012 |
1048-v1 |
Summary of Project X interactions with the LBNE reconfiguration study |
Bob Tschirhart |
Presentations
Friday Meeting
|
04 May 2012 |
1027-v2 |
MEBT Absorber Status, Project X Collaboration Meeting |
Curtis Baffes et al. |
Absorbers
|
11 Apr 2012 |
1028-v3 |
200Ohm Chopper R&D Progress |
Greg Saewert |
Presentations
Front End
Instrumentation
|
10 Apr 2012 |
1026-v2 |
Project X: News, Strategy, Meeting Goals |
Steve Holmes |
Presentations
|
09 Apr 2012 |
223-v1 |
Process to send funds to collaborating institutions |
Elaine McCluskey |
Collaboration
|
17 Jun 2009 |
998-v1 |
Kickoff of March 2012 kaon targetry discussion at BNL |
Bob Tschirhart |
Experiments
Targetting
|
29 Feb 2012 |
991-v1 |
MEBT Absorber Design Status Update |
Curtis Baffes et al. |
Absorbers
|
14 Feb 2012 |
655-v22 |
HINS Linac Safety Assessment and Radiation Shielding Assessment Docs |
Peter Kasper et al. |
Linac
HINS
LE Linac
|
15 Apr 2011 |
779-v3 |
Options for RF power couplers and HOMs |
Vyacheslav P. Yakovlev |
Linac
|
15 Dec 2010 |
713-v3 |
Laser Diagnostics |
John M Byrd et al. |
Other Labs
Presentations
Instrumentation
|
08 Sep 2010 |
701-v5 |
Foil Issues |
Deepak Raparia |
H- Injection
|
08 Sep 2010 |
714-v0 |
SNS Activities |
Willem Blokland |
None
|
04 Sep 2010 |
230-v10 |
Project X ICD-2 Document |
Paul Derwent |
Reports
|
30 Aug 2010 |
241-v4 |
Collaboration Meeting Plan |
Steve Holmes |
Collaboration
|
13 Aug 2010 |
634-v2 |
PX Conventional Facilities - Fixed Target Area Graphics |
Russ Alber |
Conventional Facilities
|
02 Aug 2010 |
614-v4 |
Cavities for the 650 MHz part of CW Project X linac (FNAL-JLAB meeting). |
Vyacheslav P. Yakovlev et al. |
SRF
|
19 Jul 2010 |
632-v3 |
HOMs in 650 MHz section of the Project-X linac |
Vyacheslav P. Yakovlev et al. |
HE Linac
|
19 Jul 2010 |
601-v2 |
A Proposal For An Upgraded Booster For Project X |
W. Pellico et al. |
RCS
|
04 May 2010 |
298-v2 |
Cryomodule Development at Fermilab |
Donald Mitchell |
SRF
Presentations
|
12 Sep 2009 |
290-v2 |
Cavity Simulations in SLAC |
Liling Xiao |
MI RF
|
12 Sep 2009 |
284-v5 |
RCS High Power RF System |
John S Reid |
Presentations
|
11 Sep 2009 |
166-v3 |
Item 1.10 - BoE for CD-0 Director's Cost Review |
David E. Johnson |
Basis of Estimate
Transfer Line
Directors Reviews
H- Injection
|
13 Mar 2009 |
153-v0 |
Item 1.1 - BoE for CD-0 Director's Cost Review |
Steve Holmes et al. |
Basis of Estimate
Directors Reviews
Project Management
|
04 Mar 2009 |
162-v1 |
Item 1.5 - BoE for CD-0 Director's Cost Review |
Manfred Wendt |
Basis of Estimate
Directors Reviews
Instrumentation
|
04 Mar 2009 |
157-v1 |
Item 1.3.1 to 1.3.2 - BoE for CD-0 Director's Cost Review |
Mark Champion et al. |
Basis of Estimate
SRF
Directors Reviews
HE Linac
LE Linac
|
04 Mar 2009 |
165-v0 |
Item 1.9 - BoE for CD-0 Director's Cost Review |
Russ Alber |
Basis of Estimate
Directors Reviews
Conventional Facilities
|
04 Mar 2009 |
164-v0 |
Item 1.7 - BoE for CD-0 Director's Cost Review |
Arkadiy Klebaner |
Basis of Estimate
Directors Reviews
Cryogenics
|
04 Mar 2009 |
163-v0 |
Item 1.6 - BoE for CD-0 Director's Cost Review |
Jim Patrick |
Basis of Estimate
Controls
Directors Reviews
|
04 Mar 2009 |
161-v0 |
Item 1.4.7 - BoE for CD-0 Director's Cost Review |
Paul Derwent |
Recycler
Basis of Estimate
Directors Reviews
|
04 Mar 2009 |
160-v0 |
Item 1.4.6 - BoE for CD-0 Director's Cost Review |
Ioanis Kourbanis |
Basis of Estimate
Directors Reviews
Main Injector
|
04 Mar 2009 |
158-v0 |
Item 1.3.4 - BoE for CD-0 Director's Cost Review |
John S Reid |
Basis of Estimate
SRF
Directors Reviews
HE Linac
|
04 Mar 2009 |
156-v0 |
Item 1.2.9 & 1.3.5 - BoE for CD-0 Director's Cost Review |
Brian E Chase |
Basis of Estimate
Directors Reviews
HE Linac
LE Linac
|
04 Mar 2009 |
155-v0 |
Item 1.2.8 - BoE for CD-0 Director's Cost Review |
Ralph J. Pasquinelli |
Basis of Estimate
Directors Reviews
LE Linac
|
04 Mar 2009 |
154-v0 |
Item 1.2.1 to 1.2.7 - BoE for CD-0 Director's Cost Review |
Bob Webber |
Basis of Estimate
Directors Reviews
LE Linac
|
04 Mar 2009 |
188-v2 |
Project Management Overview - Director's Review |
Steve Holmes |
Directors Reviews
Presentations
|
15 Mar 2009 |
169-v3 |
Civil - CD-0 Talk 031609 |
Russ Alber |
Basis of Estimate
Directors Reviews
Conventional Facilities
|
13 Mar 2009 |
149-v2 |
RD&D Plan from ICD |
Russ Alber et al. |
Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
HINS
Cryogenics
H- Injection
Reports
Main Injector
|
11 Mar 2009 |