976-v9 |
Preliminary Layout of PXIE |
Curtis Baffes et al. |
CW Linac
Requirements and Specifications
|
14 Jun 2017 |
1224-v1 |
Functional Requirement Specification (FRS) PXIE MEBT BPM at the initial stage |
Alexander Shemyakin |
Front End
|
09 Oct 2013 |
977-v1 |
PXIE MEBT kicker specifications |
Valeri A Lebedev et al. |
LE Linac
Front End
|
20 Dec 2011 |
938-v3 |
Functional specifications for PXIE MEBT |
Valeri A Lebedev et al. |
Requirements and Specifications
Front End
|
25 Jun 2012 |
1379-v1 |
PXIE 50 Ohm Fast Kicker: Measurement and Power Test Results of First Half Prototype |
Alex Z Chen et al. |
Presentations
|
18 Jun 2015 |
1370-v3 |
The PIP-II Reference Design Rep |
Valeri A Lebedev |
Reports
Linac
Main Injector
|
21 May 2015 |
1371-v3 |
IPAC-15 Summary for PIP-II |
Valeri A Lebedev et al. |
Linac
|
29 Apr 2015 |
1365-v1 |
Summary for SLHiPP-5 |
Valeri A Lebedev |
Reports
Presentations
Linac
|
15 Apr 2015 |
1352-v1 |
Booster Longitudinal Impedance |
Valeri A Lebedev |
RCS
Presentations
Instabilities
|
10 Feb 2015 |
1343-v1 |
Painting in the course of PIP-II injection to Booster Part II |
Valeri A Lebedev |
RCS
Simulations
|
02 Dec 2014 |
1331-v1 |
Painting in the course of PIP-II injection to Booster |
Valeri A Lebedev |
RCS
Presentations
|
21 Oct 2014 |
1298-v1 |
Tasks for the PIP-II RDR |
Valeri A Lebedev |
Presentations
|
25 Jun 2014 |
1295-v1 |
POT vs Energy and cycle time for high power operation |
Paul Derwent et al. |
Unassigned
|
13 Jun 2014 |
1286-v1 |
SSR2 beta 0.47 and 0.51 comparison |
Paolo Berrutti et al. |
LE Linac
|
29 Apr 2014 |
1274-v2 |
Preparation for the PIP-II RDR |
Valeri A Lebedev |
LE Linac
Presentations
Main Injector
|
01 Apr 2014 |
1260-v2 |
PIP-II and PXIE |
Valeri A Lebedev |
LE Linac
Presentations
HE Linac
|
12 Feb 2014 |
1232-v3 |
Proton Improvement Plan-II |
Paul Derwent et al. |
Reports
|
12 Dec 2013 |
776-v7 |
Reference Design Report |
Russ Alber et al. |
Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
Cryogenics
Absorbers
Reports
Main Injector
|
17 Jul 2013 |
1208-v1 |
PROJECT X INJECTOR EXPERIMENT: GOALS, PLAN, AND STATUS |
Steve Holmes et al. |
Presentations
LE Linac
|
03 Jul 2013 |
1182-v4 |
PROJECT X INJECTOR EXPERIMENT: GOALS, PLAN, AND STATUS |
Steve Holmes et al. |
Reports
|
08 May 2013 |
1138-v1 |
Acceleration of Muons with Project X Linac |
Valeri A Lebedev |
HE Linac
|
06 Dec 2012 |
1105-v1 |
Project X Siting Workshop Presentations - October 2012 |
Russ Alber et al. |
Experiments
Transfer Line
Conventional Facilities
Main Injector
|
05 Oct 2012 |
1006-v4 |
PXIE Accelerator Physics |
Valeri A Lebedev |
Presentations
Reviews
|
06 Mar 2012 |
990-v1 |
Test of TESEQ CBA 1G-150 wide band 150-Watt amplifier As a Project X Chopper Kicker Driver |
Valeri A Lebedev et al. |
Front End
|
09 Feb 2012 |
971-v1 |
Beam - related vacuum requirements for PXIE |
Valeri A Lebedev |
Vacuum
|
13 Dec 2011 |
969-v1 |
Operation Of Project X Linac As A Driver For Muon Collider |
Alexander Sukhanov et al. |
HE Linac
|
06 Dec 2011 |
939-v2 |
Medium Energy Beam Transport Design for PXIE |
Valeri A Lebedev et al. |
LE Linac
|
25 Oct 2011 |
937-v1 |
Progress report on fast kicker (cooling version) |
Valeri A Lebedev et al. |
Presentations
|
19 Oct 2011 |
935-v2 |
Requirements for the PXIE MEBT chopper |
Valeri A Lebedev et al. |
Front End
LE Linac
|
18 Oct 2011 |
930-v1 |
Major Requirements to PXIE Optics and Design |
Valeri A Lebedev |
LE Linac
|
17 Sep 2011 |
928-v2 |
Analysis of MEBT Beam Dump |
Mohamed H A Hassan et al. |
LE Linac
|
16 Sep 2011 |
889-v1 |
Design Limitations for MEBT Kicker |
Valeri A Lebedev |
Presentations
|
17 May 2011 |
871-v1 |
Beam Diagnostics: Requirements |
David E. Johnson et al. |
Presentations
Linac
Instrumentation
|
22 Apr 2011 |
849-v1 |
MEBT and Chopper Section |
Valeri A Lebedev |
LE Linac
|
12 Apr 2011 |
835-v1 |
MEBT Design |
Eliana Gianfelice-Wendt et al. |
Linac
Simulations
|
09 Mar 2011 |
792-v2 |
Chopping and Limitations to MEBT |
Valeri A Lebedev |
Transfer Line
Presentations
Absorbers
Space Charge Effects
LE Linac
|
03 Dec 2010 |
771-v1 |
Chopping and Limitations to MEBT; Injection to Recycler |
Valeri A Lebedev |
H- Injection
Absorbers
LE Linac
|
02 Nov 2010 |
600-v3 |
An Estimate of Orbit Correction for SSR0 section of the Project X |
Valeri A Lebedev |
Presentations
Linac
HINS
|
12 May 2010 |
447-v2 |
Project X Update |
Vyacheslav P. Yakovlev et al. |
Presentations
Linac
|
24 Mar 2010 |
444-v1 |
Intrabeam Stripping |
Valeri A Lebedev |
SRF
HE Linac
LE Linac
|
03 Mar 2010 |
329-v1 |
ICD-2: Next Step in the Process |
Valeri A Lebedev |
H- Injection
RCS
Main Injector
|
25 Nov 2009 |
321-v1 |
Lattice/Document Repository for Injection Collaboration |
Alexandr Drozhdin et al. |
Other Labs
RCS
Simulations
|
15 Oct 2009 |
315-v1 |
ICD-II Update |
Valeri A Lebedev |
Linac
RCS
|
30 Sep 2009 |
299-v1 |
RCS and Transfer Line WG Summary |
David E. Johnson et al. |
Transfer Line
Presentations
RCS
Collaboration
|
12 Sep 2009 |
273-v1 |
RCS for Project-X |
Valeri A Lebedev |
Presentations
Space Charge Effects
|
11 Sep 2009 |
226-v1 |
Project X ICD Siting Analysis Summary Presentation |
David E. Johnson et al. |
Conventional Facilities
|
19 Jun 2009 |
215-v2 |
Alternative Design Concept for Project-X 8 GeV complex |
Valeri A Lebedev et al. |
Basis of Estimate
Instabilities
Instrumentation
|
07 Jun 2009 |
216-v1 |
Project-X ACD write-up |
Valeri A Lebedev |
Basis of Estimate
Presentations
|
02 Jun 2009 |
83-v2 |
Initial Configuration Document v1.1 |
Russ Alber et al. |
Transfer Line
Controls
Conventional Facilities
Instabilities
HE Linac
Instrumentation
HINS
Cryogenics
H- Injection
Project Management
Absorbers
Space Charge Effects
Reports
LE Linac
Main Injector
|
16 Mar 2009 |
84-v2 |
XYZ |
Valeri A Lebedev et al. |
Presentations
|
25 Nov 2008 |
71-v1 |
MI Injection Energy |
Valeri A Lebedev |
Instabilities
HE Linac
Absorbers
Space Charge Effects
|
08 Oct 2008 |
76-v1 |
Project X Main Injector |
Valeri A Lebedev |
Presentations
Reviews
Main Injector
|
07 Oct 2008 |
23-v1 |
Main Injector Overview |
Valeri A Lebedev |
Presentations
Main Injector
|
30 Sep 2008 |