794-v1 |
325 MHz Spoke Cavity Prototype Cryomodule Functional Requirements Specification |
Bob Webber |
SRF
Linac
Cavities and Cryomodules
Front End
HINS
CW Linac
LE Linac
SRF Specifications
|
01 Dec 2010 |
776-v7 |
Reference Design Report |
Russ Alber et al. |
Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
Cryogenics
Absorbers
Reports
Main Injector
|
17 Jul 2013 |
778-v3 |
PX/HINS Six-Cavity Test Documents |
Bob Webber |
Linac
HINS
LE Linac
|
08 Sep 2011 |
918-v2 |
Thoughts on Radiation Shielding for PX Front-End Test Facility |
Bob Webber |
Test Facilities
Conventional Facilities
HINS
LE Linac
Ion Source
|
08 Aug 2011 |
901-v1 |
Six-Cavity Test Installation Plan - June 2011 |
Bob Webber |
HINS
|
16 Jun 2011 |
655-v22 |
HINS Linac Safety Assessment and Radiation Shielding Assessment Docs |
Peter Kasper et al. |
Linac
HINS
LE Linac
|
15 Apr 2011 |
795-v1 |
Status and plans for SSR0 and SSR1 Cavities |
Bob Webber |
SRF
HINS
SRF Specifications
LE Linac
|
01 Dec 2010 |
783-v1 |
325 MHz Spoke Cavity Status and FY11 Plans |
Bob Webber |
SRF
Presentations
Linac
HINS
LE Linac
|
04 Nov 2010 |
782-v1 |
325 MHz Spoke Cavity Prototype Cryomodule |
Bob Webber |
SRF
Linac
HINS
SRF Specifications
LE Linac
|
03 Nov 2010 |
773-v1 |
Front-end R&D Plans - SSR Prototype and Chopper Section |
Bob Webber |
Presentations
Linac
HINS
LE Linac
|
01 Nov 2010 |
542-v2 |
HINS R&D Activities at Meson Detector Building |
Jim Steimel et al. |
HINS
|
22 Oct 2010 |
764-v1 |
MDB Beam Test Facility Plan |
Bob Webber |
Linac
HINS
LE Linac
Ion Source
|
21 Oct 2010 |
538-v3 |
Estimate of X-Ray Shielding and Radiation Monitoring for Safe Operation of the HINS Cavity Test Cave in the Meson Detector Building |
Jim Steimel et al. |
HINS
|
12 Oct 2010 |
744-v2 |
Linac Front End Woking Group Summary |
Bob Webber |
Linac
Collaboration
LE Linac
Ion Source
|
09 Sep 2010 |
666-v2 |
325 MHz Cavity Tests |
Timergali Khabiboulline et al. |
SRF
HINS
|
09 Sep 2010 |
728-v1 |
Experiences with the Fermilab HINS 325 MHz RFQ |
Timergali Khabiboulline et al. |
Linac
HINS
LE Linac
|
07 Sep 2010 |
724-v1 |
FIRST HIGH GRADIENT TEST RESULTS OF A DRESSED 325 MHZ SUPERCONDUCTING SINGLE SPOKE RESONATOR AT FERMILAB |
Timergali Khabiboulline et al. |
SRF
Linac
HINS
LE Linac
|
07 Sep 2010 |
654-v2 |
HINS Report for DOE Site Visit - B&R Code KA15-02-011_August_23_2010 |
Bob Webber |
SRF
Presentations
Linac
HINS
LE Linac
|
23 Aug 2010 |
633-v1 |
HINS Six-Cavity Test Presentation to PX Front-End Meeting |
Bob Webber |
Presentations
HINS
LE Linac
|
07 Jul 2010 |
623-v1 |
Pearson Current Toroid Vacuum and Bake-out Test Results |
Bob Webber |
Instrumentation
HINS
LE Linac
|
15 Jun 2010 |
617-v1 |
PX_solyak_lattice_front-end_in_HINS_Cave |
Bob Webber |
Presentations
HINS
LE Linac
|
26 May 2010 |
612-v1 |
Meson Detector Building Plans for Project X and SRF |
Bob Webber |
SRF
HINS
LE Linac
|
17 May 2010 |
593-v1 |
HINS H- Ion Source Status |
Bob Webber |
HINS
Ion Source
|
14 Apr 2010 |
586-v1 |
Possible Siting of HTS2 in Meson Detector Building |
Bob Webber |
HINS
|
02 Apr 2010 |
585-v1 |
HINS Front-end Beam Facility Status |
Bob Webber |
HINS
LE Linac
|
01 Apr 2010 |
457-v1 |
Project X MEBT/Chopper and 3-Cavity SSR0 in MDB |
Bob Webber |
HINS
LE Linac
|
01 Apr 2010 |
441-v2 |
Options for Locating 325MHz Cryomodule Test Stand at MDB |
Bob Webber |
Presentations
HINS
|
24 Feb 2010 |
428-v1 |
HINS R&D Program Goals Statement |
Bob Webber |
HINS
|
02 Feb 2010 |
426-v1 |
HINS Possibilities for Project X, January 2010 |
Bob Webber |
SRF
Presentations
Instrumentation
HINS
|
26 Jan 2010 |
408-v1 |
Results of First Wire Scans of HINS 2.5 MeV Beam |
Bob Webber |
Instrumentation
HINS
|
19 Jan 2010 |
549-v1 |
HINS Clock Events, Definitions, and Usage |
Bob Webber |
HINS
|
12 Jan 2010 |
520-v1 |
HINS 2.5 MeV Beam Operations and Commissioning Documents |
Jim Steimel et al. |
HINS
|
16 Dec 2009 |
578-v1 |
HINS RFQ Heating Estimates |
Bob Webber |
HINS
|
10 Dec 2009 |
270-v3 |
Linac Design - Chopper Ideas |
Bob Webber |
Presentations
Linac
|
11 Sep 2009 |
512-v1 |
HINS RoadMap August 2009 |
Bob Webber |
HINS
|
28 Aug 2009 |
508-v1 |
HINS 325 MHz Cavity Test Cave Documentation |
Rick Bossert et al. |
Controls
HINS
|
23 Jul 2009 |
227-v1 |
HINS Status Report for June 19, 2009 Project X Meeting |
Bob Webber |
Presentations
HINS
|
19 Jun 2009 |
154-v0 |
Item 1.2.1 to 1.2.7 - BoE for CD-0 Director's Cost Review |
Bob Webber |
Basis of Estimate
Directors Reviews
LE Linac
|
04 Mar 2009 |
83-v2 |
Initial Configuration Document v1.1 |
Russ Alber et al. |
Transfer Line
Controls
Conventional Facilities
Instabilities
HE Linac
Instrumentation
HINS
Cryogenics
H- Injection
Project Management
Absorbers
Space Charge Effects
Reports
LE Linac
Main Injector
|
16 Mar 2009 |
149-v2 |
RD&D Plan from ICD |
Russ Alber et al. |
Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
HINS
Cryogenics
H- Injection
Reports
Main Injector
|
11 Mar 2009 |
117-v1 |
Intro to PrX front end/Low Beta Cavities |
Bob Webber |
Presentations
LE Linac
|
24 Feb 2009 |
583-v1 |
Estimate of RF Cavity X-rays in the HINS Linac Enclosure and Shielding Required |
Bob Webber |
HINS
|
27 Jan 2009 |
563-v1 |
HINS Linac Baseline Design Documents |
Bob Webber |
HINS
|
30 Dec 2008 |
68-v1 |
Summary--Low Energy Linac Component and System Designs |
Peter N Ostroumov et al. |
LE Linac
|
02 Oct 2008 |
20-v1 |
Low Energy Linac Overview |
Bob Webber |
Presentations
LE Linac
|
30 Sep 2008 |
4-v1 |
Project X Linac Front-end Thoughts and Facts |
Bob Webber |
Linac
|
28 Aug 2008 |
475-v1 |
HINS Talk to AD Controls Dept - April 2008 |
Bob Webber |
Controls
HINS
|
29 Apr 2008 |
471-v1 |
H- Ion Source Spec for HINS and Considerations for Project X H- Ion Source |
Charles W. Schmidt et al. |
HINS
Ion Source
|
19 Mar 2008 |
467-v1 |
HINS Presentation to AD Instrumentation Department 2/20/2008 |
Bob Webber |
Instrumentation
HINS
|
20 Feb 2008 |
561-v1 |
Testing 325 MHz Cavities in the ILC IB1 Vertical Test System |
Bob Webber |
HINS
|
14 Dec 2007 |
564-v1 |
Overview of HINS Operations and Radiation Shielding Considerations in MDB |
Bob Webber |
HINS
|
05 Nov 2007 |
534-v1 |
High Intensity Proton Source Naming Convention |
Sharon L. Lackey et al. |
Controls
|
18 Apr 2007 |
552-v1 |
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac |
Bob Webber |
Proton Driver
|
16 Apr 2007 |
546-v1 |
HINS Presentation to AD Department Heads |
Bob Webber |
HINS
|
16 Mar 2007 |
535-v1 |
HINS/PD Meson Planning Meeting Minutes |
Jim Steimel et al. |
HINS
|
02 Mar 2007 |
533-v1 |
HINS Program Overview for CD Controls Management Meeting |
Bob Webber |
Controls
HINS
|
09 Oct 2006 |
531-v1 |
Proposed Proton Driver/HINS Beam Operations at Meson Detector Building |
Bob Webber |
Proton Driver
HINS
|
15 Aug 2006 |