1232-v3 |
Proton Improvement Plan-II |
Paul Derwent et al. |
Reports
|
12 Dec 2013 |
815-v1 |
Ecloud: A quick check of the microwave method with obstructions ("ears") in MI beam pipe |
Cheng-Yang Tan |
Main Injector
|
03 Feb 2011 |
763-v1 |
MI Magnetic Field Measurements |
Cheng-Yang Tan |
Main Injector
|
21 Oct 2010 |
762-v1 |
Proposal to test TiN at SPS |
Cheng-Yang Tan |
Main Injector
|
21 Oct 2010 |
758-v1 |
The Ecloud Measurement Setup in the Main Injector |
Cheng-Yang Tan et al. |
Experiments
Main Injector
|
13 Oct 2010 |
661-v5 |
Plans for a New Front-End for the existing FNAL Linac |
W. Pellico et al. |
Collaboration
|
08 Sep 2010 |
601-v2 |
A Proposal For An Upgraded Booster For Project X |
W. Pellico et al. |
RCS
|
04 May 2010 |
452-v1 |
Using Booster, Switchyard and MI-8 in Project X |
Robert M. Zwaska et al. |
Presentations
|
20 Mar 2010 |
429-v1 |
"Ecloud" Measurements with MI IPMs |
Cheng-Yang Tan |
Space Charge Effects
|
04 Feb 2010 |
517-v1 |
Magnetometer Possibilities |
Cheng-Yang Tan |
Unassigned
|
19 Nov 2009 |
514-v1 |
Ecloud Energy Distribution |
Cheng-Yang Tan |
Unassigned
|
24 Sep 2009 |
272-v1 |
Electron Cloud Experimental Upgrade in the Main Injector |
Cheng-Yang Tan et al. |
Instabilities
Main Injector
|
11 Sep 2009 |
504-v1 |
Trapped Modes for Measuring Ecloud |
Cheng-Yang Tan |
Unassigned
|
20 May 2009 |
502-v1 |
RFA Electronics |
Cheng-Yang Tan |
Unassigned
|
25 Feb 2009 |
501-v1 |
High Gain 3kHz LPF for RFA |
Cheng-Yang Tan |
Unassigned
|
28 Jan 2009 |
499-v1 |
Preliminary Measurements of RFA and Beam Measurements |
Cheng-Yang Tan |
Unassigned
|
23 Dec 2008 |
486-v1 |
RFA Design |
Cheng-Yang Tan |
Unassigned
|
22 Jul 2008 |
484-v1 |
Simulations of Various RFAs for Future Designs |
Cheng-Yang Tan |
Unassigned
|
03 Jul 2008 |
476-v1 |
Preliminary RFA Design |
Cheng-Yang Tan |
Unassigned
|
06 May 2008 |
469-v1 |
Survey of RFAs (Retarding Field Analysers) |
Cheng-Yang Tan |
Unassigned
|
26 Feb 2008 |