The Ecloud Measurement Setup in the Main Injector

Document #:
Project X-doc-758-v1
Document type:
talk
Submitted by:
Cheng-Yang Tan
Updated by:
Cheng-Yang Tan
Document Created:
13 Oct 2010, 10:49
Contents Revised:
13 Oct 2010, 10:49
DB Info Revised:
13 Oct 2010, 10:49
Viewable by:
  • Public document
Modifiable by:
Abstract:
An ecloud measurement setup was installed in a straight section of the Main Injector in 2009. The goal of the setup was to compare
the characteristics of different beam pipe coatings when subjected to proton beam. The setup consists of one coated and one
uncoated beam pipe with the same physical dimensions installed at the same location. Four RFAs (retarding field analysers) and
two BPMs (used for RF measurements) have been used to measure the ecloud densities. The RFAs have performed very well and
have collected both the time evolution and energy distribution of the ecloud for bare and two types of beam pipe coating.
Files in Document:
Keywords:
Ecloud rfa
Publication Information:
Ecloud 2010 Workshop held at Cornell University 8-12 Oct 2010
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators