Project X


Project X Document 523-v1


Project X DocDB Home

Rapid Cycling Synchrotron Option for Project X

Document #:
Project X-doc-523-v1
Document type:
proceeding
Submitted by:
Alan A Wehmann
Updated by:
Alan A Wehmann
Document Created:
07 Dec 2009, 15:10
Contents Revised:
07 Dec 2009, 15:10
Metadata Revised:
07 Dec 2009, 15:10
Actually Revised:
31 Mar 2010, 11:59
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
This paper presents an 8 GeV Rapid Cycling Synchrotron (RCS) option for Project X. It has several advantages over an 8 GeV SC linac. In particular, the cost could be lower. With a 2 GeV 10 mA pulsed linac as injector, the RCS would be able to deliver 4 MW beam power for a muon collider. If, instead, a 2 GeV 1 mA CW linac is used, the RCS would still be able to meet the Project X requirements but it would be difficult for it to serve a muon collider due to the very long injection time.
Files in Document:
Topics:
Authors:
Notes and Changes:
Presentation at the AHIPA09 Workshop, Oct 19-21, 2009, Fermilab
document migrated from BD DocDB docid=3518, version=1
AW: add cross reference to BD DocDB source document
Related Documents:
Publication Information:
document migrated from BD DocDB docid=3518, version=1
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.8.9, contact Document Database Administrators