Project X


Project X Document 418-v1


Project X DocDB Home

An 8-GeV Synchrotron-Based Proton Driver

Document #:
Project X-doc-418-v1
Document type:
proceeding
Submitted by:
Weiren Chou
Updated by:
Weiren Chou
Document Created:
20 Jan 2010, 18:22
Contents Revised:
20 Jan 2010, 18:22
Metadata Revised:
20 Jan 2010, 18:22
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
In January 2002, the Fermilab Director initiated a design study for a high average power, modest energy proton facility. Such a facility is a possible candidate for a construction project in the U.S. starting in the middle of this decade. The key technical element is a new machine, dubbed the "Proton Driver," as a replacement of the present Booster. The study of an 8-GeV synchrotron-based proton driver has been completed and published [1]. This paper will give a summary report, including machine layout and performance, optics, beam dynamics issues, technical systems design, civil construction,
Files in Document:
Topics:
Authors:
Notes and Changes:
PAC03 paper
Related Documents:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.8.9, contact Document Database Administrators