Project X


Project X Document 17-v2


Project X DocDB Home

A Staged Approach to a High Intensity Proton Source

Document #:
Project X-doc-17-v2
Document type:
technical note
Submitted by:
Dave McGinnis
Updated by:
Dave McGinnis
Document Created:
26 Sep 2008, 15:12
Contents Revised:
15 Oct 2008, 15:44
DB Info Revised:
15 Oct 2008, 15:44
Viewable by:
  • Public document
Modifiable by:
Other Versions:
Project X-doc-17-v1
26 Sep 2008, 15:12
Abstract:
By combining a 2 GeV linac with rapid cycling synchrotron, a 200kW, 8 GeV proton source can enable a 2.1 MW, 120 GeV beam from the Main Injector. This source can be built with standard accelerator technology and little technical risk. This source can then be upgraded in a straight forward manner with more advanced accelerator technology such as an 8 GeV superconducting linac and a super-ferric, medium energy Booster to provide enough beam for 10.4 MW at 120 GeV in the Main Injector. In addition, the upgraded source can provide 1.7 MW at 8 GeV and 4.7 MW at 22 GeV. This staged approach avoids the “all-or-nothing” pitfalls of the current Project X concept.
Files in Document:
Topics:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators