Project X


Project X Document 1317-v1


Project X DocDB Home

STATUS OF THE WARM FRONT END OF PXIE

Document #:
Project X-doc-1317-v1
Document type:
proceeding
Submitted by:
Alexander Shemyakin
Updated by:
Alexander Shemyakin
Document Created:
25 Aug 2014, 16:15
Contents Revised:
25 Aug 2014, 16:15
DB Info Revised:
25 Aug 2014, 16:15
Viewable by:
  • Public document
Modifiable by:
Abstract:
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab’s injection complex. To validate the concept of the front-end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chopping system.
Files in Document:
Topics:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators