Project X


Project X Document 1051-v2


Project X DocDB Home

PXIE Preliminary Shielding Assessment

Document #:
Project X-doc-1051-v2
Document type:
technical note
Submitted by:
Anthony F Leveling
Updated by:
Anthony F Leveling
Document Created:
10 May 2012, 14:48
Contents Revised:
18 Jun 2012, 07:30
DB Info Revised:
28 Feb 2013, 12:41
Viewable by:
  • Public document
Modifiable by:
Other Versions:
Project X-doc-1051-v1
08 Jun 2012, 15:06
Abstract:
The proposed test facility at CMTF for PXIE is reviewed in this document for compliance with requirements of the Fermilab Radiological Controls Manual.

A design change was made for generic penetrations and RFQ penetrations in September 2012. An addendum to version 2 of the assessment is included for consideration of those latest penetration designs.

Files in Document:
Other Files:
Notes and Changes:
A new design for the upstream labyrinth has been developed. A three legged labyrinth replaces the original two legged one. The consequence of the new design is that attenuation through the labyrinth is improved resulting in lower effective dose rate than possible with the original design.
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators