Project X


Search Results


Project X DocDB Home

Project X-doc-# Title Author(s) Topic(s) Last Updated
787-v5 325 MHz Cavity Test Cryostat 2K Conversion Functional Requirements Specification Thomas H. Nicol SRF
325 MHz
LE Linac
Requirements and Specifications
Presentations
Linac
HINS
18 May 2011
1100-v2 Measurements of the electron beam size at the absorber prototype test bench Anna Mitskovets Experiments
Absorbers
03 Oct 2012
1033-v1 Cavity Test Stands for Project X Andy Hocker SRF
Presentations
11 Apr 2012
963-v1 Electron Beam Dynamics Simulations for the Proposed Test of the PXIE/Project X MEBT Absorber Lionel R Prost et al. Experiments
Absorbers
Simulations
Presentations
15 Nov 2011
789-v1 IOT power compression test Ralph J. Pasquinelli 650 MHz
16 Nov 2010
441-v2 Options for Locating 325MHz Cryomodule Test Stand at MDB Bob Webber Presentations
HINS
24 Feb 2010
Number of documents found: 6

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.8.9, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.16 usr + 0.04 sys = 0.20 CPU)