Project X-doc-# Title Author(s) Topic(s) Last Updated
776-v7 Reference Design Report Russ Alber et al. Controls
Absorbers
Reports
Instrumentation
Linac
Recycler
Transfer Line
Conventional Facilities
Cryogenics
Main Injector
17 Jul 2013
1141-v1 Chopper Scenarios for injection into Booster (part 1) Brian E Chase et al. Presentations
H- Injection
18 Dec 2012
893-v2 Beam chopping for injection into RR/MI Sergei Nagaitsev Presentations
H- Injection
25 May 2011
888-v1 Investigating the problem space of beam injection schemes for Project X Julien Branlard H- Injection
17 May 2011
771-v1 Chopping and Limitations to MEBT; Injection to Recycler Valeri A Lebedev Absorbers
LE Linac
H- Injection
02 Nov 2010
745-v1 Main Injector/Recycler Ioanis Kourbanis Recycler
Main Injector
09 Sep 2010
727-v2 Laser Stripping Options David E. Johnson H- Injection
08 Sep 2010
726-v1 Recycler Injection with Foil David E. Johnson H- Injection
08 Sep 2010
701-v5 Foil Issues Deepak Raparia H- Injection
08 Sep 2010
722-v1 ICD-2 Overview Sergei Nagaitsev Linac
Recycler
Main Injector
07 Sep 2010
336-v1 Beam Lattice Parameters for Recycler Injection using Laser Assisted Stripping David E. Johnson H- Injection
18 Dec 2009
329-v1 ICD-2: Next Step in the Process Valeri A Lebedev RCS
H- Injection
Main Injector
25 Nov 2009
293-v1 MI and RR Rings, Wworking Group Report Ioanis Kourbanis Recycler
Main Injector
12 Sep 2009
289-v1 Space Charge Simulations at Berkeley Ji Qiang Recycler
Main Injector
12 Sep 2009
254-v4 Injection simulations into RCS Leonid Vorobiev Simulations
H- Injection
11 Sep 2009
280-v1 MI/RR RIngs. Introduction/Update Ioanis Kourbanis Recycler
Main Injector
11 Sep 2009
252-v1 J-PARC RCS Injection Issues Pranab K Saha Other Labs
Absorbers
Presentations
Collaboration
H- Injection
10 Sep 2009
214-v1 Project X FY09 R&D Plan for Transport and Injection David E. Johnson Transfer Line
H- Injection
18 May 2009
98-v1 Present details of transfer line and injection ICD David E. Johnson Presentations
Recycler
23 Apr 2009
99-v1 Recycler Lattice Meiqin Xiao Presentations
Recycler
23 Apr 2009
100-v1 Transverse phase space painting Alexandr Drozhdin et al. Presentations
Recycler
23 Apr 2009
101-v1 Laser stripping Robert M. Zwaska Presentations
H- Injection
23 Apr 2009
102-v1 Injection absorber design Igor L Rakhno et al. Presentations
H- Injection
23 Apr 2009
103-v1 Footprint and Siting Issues David E. Johnson Presentations
Recycler
23 Apr 2009
104-v1 PS2 Injection: thoughts and concerns Brennan Goddard Presentations
Recycler
23 Apr 2009
166-v3 Item 1.10 - BoE for CD-0 Director's Cost Review David E. Johnson Directors Reviews
Basis of Estimate
Transfer Line
H- Injection
13 Mar 2009
161-v0 Item 1.4.7 - BoE for CD-0 Director's Cost Review Paul Derwent Directors Reviews
Basis of Estimate
Recycler
04 Mar 2009
83-v2 Initial Configuration Document v1.1 Russ Alber et al. Controls
Absorbers
Reports
HE Linac
Instabilities
Instrumentation
LE Linac
Project Management
HINS
Space Charge Effects
Transfer Line
Conventional Facilities
Cryogenics
H- Injection
Main Injector
16 Mar 2009
189-v1 PX Dir Review 8 GeV Injection Components David E. Johnson Directors Reviews
Basis of Estimate
Presentations
H- Injection
15 Mar 2009
175-v2 PX Dir Review 8 GeV level 2 Overview David E. Johnson Directors Reviews
Presentations
Transfer Line
H- Injection
15 Mar 2009
174-v1 Main Injector and Recycler RF Joseph E Dey Directors Reviews
Basis of Estimate
Recycler
Main Injector
13 Mar 2009
178-v1 Project X: Initial Configuration Paul Derwent Controls
Directors Reviews
Instrumentation
Presentations
Linac
HINS
Recycler
Transfer Line
Conventional Facilities
Cryogenics
Main Injector
13 Mar 2009
149-v2 RD&D Plan from ICD Russ Alber et al. Controls
Reports
Instrumentation
Linac
HINS
Recycler
Transfer Line
Conventional Facilities
Cryogenics
H- Injection
Main Injector
11 Mar 2009
115-v1 Present initial draft of RD&D plan David E. Johnson Presentations
Recycler
24 Feb 2009
114-v1 Present current R&D issues David E. Johnson Presentations
Recycler
24 Feb 2009
136-v1 Lattice files for Project X Injection and Painting David E. Johnson Simulations
H- Injection
10 Dec 2008
496-v1 Injection painting for Project-X Alexandr Drozhdin et al. Recycler
20 Nov 2008
77-v1 Recycler 8.9 GeV/c Extraction David E. Johnson Presentations
Reviews
Recycler
07 Oct 2008
75-v1 Project-X Related Issues in Recycler Alexander A Valishev Presentations
Reviews
Recycler
07 Oct 2008
74-v1 Project X: 8 GeV Recycler Injection David E. Johnson Presentations
Reviews
H- Injection
07 Oct 2008
60-v1 Modeling of Ring Performance Robert D Ryne Simulations
Presentations
Recycler
Main Injector
01 Oct 2008
59-v1 Injection and Extraction David E. Johnson Presentations
Recycler
Transfer Line
Main Injector
01 Oct 2008
58-v1 Transverse Damper Phil Adamson Instabilities
Presentations
Recycler
Main Injector
01 Oct 2008
57-v1 RF System and Beam Loading Compensation John S Reid Presentations
Recycler
Main Injector
01 Oct 2008
53-v1 SNS Laser Stripping Development Aleksandrov V Aleksandrov Other Labs
Presentations
H- Injection
01 Oct 2008
52-v1 Transfer lines, H- stripping and injection Deepak Raparia Presentations
Transfer Line
H- Injection
01 Oct 2008
51-v1 Present RR operation Consolato Gattuso Operations
Presentations
Recycler
01 Oct 2008
49-v1 Electron Cloud, EP Instability and Requirements for Vacuum Miguel A Furman Instabilities
Presentations
Recycler
Main Injector
01 Oct 2008
48-v1 Theoretical Expectations for Instabilities Alexey V Burov Instabilities
Presentations
Recycler
Main Injector
01 Oct 2008
25-v1 Linac Beam Physics Design and Special Requirements of H- vs e Peter N Ostroumov Linac
H- Injection
30 Sep 2008
22-v1 Recycler Overview Alexander A Valishev Presentations
Recycler
30 Sep 2008
5-v1 Project X ICD: High-energy linac parameters Sergei Nagaitsev Controls
Linac
Conventional Facilities
Cryogenics
H- Injection
Main Injector
29 Aug 2008

Number of documents found: 52

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.31 usr + 0.07 sys = 0.38 CPU)