Project X


Document List by Topic


Project X DocDB Home

These documents on Transfer Line are available:
(List events on Transfer Line)

Project X-doc-# Title Author(s) Topic(s) Last Updated
1330-v1 Status of PIP-II transfer line design Alessandro Vivoli Transfer Line
21 Oct 2014
776-v7 Reference Design Report Russ Alber et al. Controls
Linac
Absorbers
Reports
Recycler
Transfer Line
Conventional Facilities
Instrumentation
Cryogenics
Main Injector
17 Jul 2013
1105-v1 Project X Siting Workshop Presentations - October 2012 Russ Alber et al. Experiments
Transfer Line
Conventional Facilities
Main Injector
05 Oct 2012
1074-v1 Project X Siting Concepts Presentation Marc Kaducak Experiments
Linac
Transfer Line
Conventional Facilities
29 Jun 2012
792-v2 Chopping and Limitations to MEBT Valeri A Lebedev Presentations
Absorbers
Space Charge Effects
Transfer Line
LE Linac
03 Dec 2010
639-v2 Implications of Beam Energy on Transport Line David E. Johnson Transfer Line
27 Jul 2010
255-v5 Foil heating and cooling, Injection beam dump Alexandr Drozhdin et al. Transfer Line
06 Oct 2009
299-v1 RCS and Transfer Line WG Summary David E. Johnson et al. Presentations
RCS
Transfer Line
Collaboration
12 Sep 2009
253-v3 Review Transfer/Injection R&D Plan – Siting Issues David E. Johnson Presentations
Transfer Line
Collaboration
10 Sep 2009
249-v1 Deflecting Cavity for the Beam RF Splitter Vyacheslav P. Yakovlev Presentations
SRF
Transfer Line
01 Sep 2009
214-v1 Project X FY09 R&D Plan for Transport and Injection David E. Johnson Transfer Line
H- Injection
18 May 2009
166-v3 Item 1.10 - BoE for CD-0 Director's Cost Review David E. Johnson Directors Reviews
Basis of Estimate
Transfer Line
H- Injection
13 Mar 2009
83-v2 Initial Configuration Document v1.1 Russ Alber et al. Controls
Project Management
Absorbers
Space Charge Effects
Reports
Transfer Line
Conventional Facilities
Instabilities
HE Linac
Instrumentation
HINS
Cryogenics
H- Injection
LE Linac
Main Injector
16 Mar 2009
190-v1 PX Dir Review 8 GeV Transport Line Components David E. Johnson Directors Reviews
Presentations
Basis of Estimate
Transfer Line
15 Mar 2009
175-v2 PX Dir Review 8 GeV level 2 Overview David E. Johnson Directors Reviews
Presentations
Transfer Line
H- Injection
15 Mar 2009
178-v1 Project X: Initial Configuration Paul Derwent Controls
Directors Reviews
Presentations
Linac
Recycler
Transfer Line
Conventional Facilities
Instrumentation
HINS
Cryogenics
Main Injector
13 Mar 2009
149-v2 RD&D Plan from ICD Russ Alber et al. Controls
Linac
Reports
Recycler
Transfer Line
Conventional Facilities
Instrumentation
HINS
Cryogenics
H- Injection
Main Injector
11 Mar 2009
134-v1 Transfer Line & Injection WG Report David E. Johnson et al. Reports
Transfer Line
24 Feb 2009
59-v1 Injection and Extraction David E. Johnson Presentations
Recycler
Transfer Line
Main Injector
01 Oct 2008
52-v1 Transfer lines, H- stripping and injection Deepak Raparia Presentations
Transfer Line
H- Injection
01 Oct 2008
584-v1 SNS visit David E. Johnson Transfer Line
28 Mar 2006

Number of documents found: 21

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.26 usr + 0.05 sys = 0.31 CPU)