Project X


Document List by Topic


Project X DocDB Home

These documents on Superconducting Radio Frequency Cavities (subtopic of Linac) and sub-topics are available:
(List events on Superconducting Radio Frequency Cavities)

Project X-doc-# Title Author(s) Topic(s) Last Updated
1079-v2 325 MHz SSR1 Cavity Functional Requirements Specification (FRS) Leonardo Ristori Requirements and Specifications
SRF
325 MHz
SRF Specifications
09 Jul 2012
794-v1 325 MHz Spoke Cavity Prototype Cryomodule Functional Requirements Specification Bob Webber Cavities and Cryomodules
LE Linac
Linac
SRF
HINS
CW Linac
Front End
SRF Specifications
01 Dec 2010
787-v5 325 MHz Cavity Test Cryostat 2K Conversion Functional Requirements Specification Thomas H. Nicol Requirements and Specifications
LE Linac
Presentations
Linac
SRF
HINS
325 MHz
18 May 2011
1333-v1 650 MHz coupler, couple of new ideas Sergey Kazakov SRF
29 Oct 2014
1319-v1 Results of Hight Power Test of 325 MHz Couplers Sergey Kazakov Presentations
SRF
27 Aug 2014
1297-v1 Progress in “High Q” Program Alexander Romanenko et al. SRF
10 Jun 2014
1282-v1 LFD and Microphonics Suppression for PIP-II Warren Schappert SRF
16 Apr 2014
1275-v1 SSR1-G3 Tuner Donato Passarelli SRF
02 Apr 2014
1244-v1 Progress on RFQ couplers test stand Sergey Kazakov Presentations
SRF
14 Jan 2014
1236-v1 Status of HWR Cryomodule Development Peter N Ostroumov Presentations
SRF
17 Dec 2013
1196-v1 650 MHz high beta dressed cavity development plan Timergali Khabiboulline et al. HE Linac
Cavities and Cryomodules
650 MHz
Presentations
SRF
CW Linac
06 Jun 2013
1149-v1 MEBT Buncher Cavity Design Proposal and Specification Meiyu Chen et al. Cavities and Cryomodules
162.5 MHz
SRF Specifications
03 Jan 2013
1037-v1 SSR1 Cryomodule Development - Project X Collaboration Meeting - April 10-12, 2012 Thomas H. Nicol Presentations
SRF
13 Apr 2012
1036-v1 Project X Beta = 0.9, 650 MHz, Cavity and Cryomodule Status Thomas J. Peterson Presentations
SRF
Cryogenics
12 Apr 2012
1034-v1 PX front end SC cavity design and measurements Timergali Khabiboulline Cavities and Cryomodules
Presentations
SRF
12 Apr 2012
1033-v1 Cavity Test Stands for Project X Andy Hocker Presentations
SRF
11 Apr 2012
1013-v1 Power Loss in Project X SSR1 Cavities due to Resonance Excitation of Monopole HOMs Alexander Sukhanov et al. SRF
12 Mar 2012
1005-v1 RF Power Sources for PXIE Ralph J. Pasquinelli Presentations
SRF
Reviews
05 Mar 2012
997-v1 Cryomodule Assembly Facility (CAF) at Fermilab: Feasibility Overview for Project X & future SRF Cryomodules Assemblies Tug T Arkan SRF
21 Feb 2012
978-v1 Effect of condensed gases on SRF cavities Alexander Romanenko SRF
20 Dec 2011
919-v1 Current Status and Plans for SRF Cavity Processing for Project X Allan M Rowe Cavities and Cryomodules
SRF
19 Aug 2011
916-v1 Overview of field emission problem in SRF cavities Alexander Romanenko Cavities and Cryomodules
SRF
Conventional Facilities
14 Jul 2011
900-v1 Raising Medium field Q0 : Ways to Proceed Alexander Romanenko SRF
14 Jun 2011
884-v1 325 MHz coupler designs Sergey Kazakov SRF
13 May 2011
821-v1 SSR1-01 Pulsed tests Robyn L. Madrak et al. SRF
HINS
10 Feb 2011
819-v1 SSR1-01 Pulsed Tests Robert L Wagner SRF
HINS
325 MHz
10 Feb 2011
822-v1 Brief Summary of SSR1 LFD Compensation Yuriy Pischalnikov et al. LE Linac
Linac
SRF
HINS
10 Feb 2011
823-v1 Solenoid Lenses for SSR Cryomodules Iouri Terechkine Presentations
Linac
SRF
HINS
10 Feb 2011
820-v1 Multipactor simulation in 650MHz cavities of Project X Sergey Kazakov SRF
09 Feb 2011
813-v1 SSR0 design update Leonardo Ristori Simulations
Cavities and Cryomodules
Cavities and Cryomodules
SRF
325 MHz
Front End
27 Jan 2011
798-v1 Possible Configurations for Prototypes of PX Cryomodules: SSR0 and SSR1 Iouri Terechkine LE Linac
Presentations
Linac
SRF
HINS
10 Dec 2010
795-v1 Status and plans for SSR0 and SSR1 Cavities Bob Webber LE Linac
SRF
HINS
SRF Specifications
01 Dec 2010
783-v1 325 MHz Spoke Cavity Status and FY11 Plans Bob Webber LE Linac
Presentations
Linac
SRF
HINS
04 Nov 2010
782-v1 325 MHz Spoke Cavity Prototype Cryomodule Bob Webber LE Linac
Linac
SRF
HINS
SRF Specifications
03 Nov 2010
770-v1 SSR1 Cryomodule Status Thomas H. Nicol LE Linac
Presentations
Linac
SRF
HINS
01 Nov 2010
766-v1 Current Leads for Superconducting Solenoids Valeri Poloubotko LE Linac
Linac
SRF
HINS
25 Oct 2010
759-v1 325MHz Cavity Processing Proposal for FY11 Allan M Rowe LE Linac
Linac
SRF
14 Oct 2010
755-v1 HINS Test Cryostat 2 K Conversion Status Thomas H. Nicol SRF
HINS
Cryogenics
07 Oct 2010
616-v1 Chopper in HINS (RFQ+matcher+Chopper) Nikolay A. Solyak Simulations
SRF
HINS
04 Oct 2010
666-v2 325 MHz Cavity Tests Timergali Khabiboulline et al. SRF
HINS
09 Sep 2010
741-v1 Cavities & Cryomodules Robert Rimmer SRF
09 Sep 2010
680-v4 325/650 Cavity EM Design Vyacheslav P. Yakovlev et al. SRF
08 Sep 2010
711-v1 650 CM Design Concepts Robert Rimmer SRF
Cryogenics
08 Sep 2010
682-v1 650 Cavity Design Concepts Frank Marhauser et al. SRF
08 Sep 2010
707-v1 Project X Cavity Detuning Warren Schappert SRF
08 Sep 2010
737-v3 SRF Cavity Processing for Project X Allan M Rowe SRF
08 Sep 2010
677-v1 CW Linac Design Nikolay A. Solyak HE Linac
LE Linac
Linac
SRF
Collaboration
08 Sep 2010
733-v1 Microphonics (Remote Access) - Mathias Liepe Matthias Liepe HE Linac
LE Linac
SRF
LLRF
08 Sep 2010
667-v1 Joint ANL/FNAL Chemistry Facility at Argonne Michael P. Kelly et al. SRF
08 Sep 2010
665-v2 CCM R&D Plan Robert D Kephart SRF
08 Sep 2010
724-v1 FIRST HIGH GRADIENT TEST RESULTS OF A DRESSED 325 MHZ SUPERCONDUCTING SINGLE SPOKE RESONATOR AT FERMILAB Timergali Khabiboulline et al. LE Linac
Linac
SRF
HINS
07 Sep 2010
663-v1 1300 MHz Sources Sam Chu SRF
07 Sep 2010
657-v1 Third Report on SSR1-01 RF Results in MDB Cryostat and Power Coupler Qext Calculations Timergali Khabiboulline LE Linac
Presentations
Linac
SRF
HINS
27 Aug 2010
647-v1 Couplers for Project X Sergey Kazakov SRF
26 Aug 2010
654-v2 HINS Report for DOE Site Visit - B&R Code KA15-02-011_August_23_2010 Bob Webber LE Linac
Presentations
Linac
SRF
HINS
23 Aug 2010
653-v1 Second Report on SSR1 Tuner Results in MDB Cryostat Yuriy Pischalnikov LE Linac
Linac
SRF
HINS
22 Aug 2010
652-v1 Second Report on SSR0-1 RF Results in MDB Cryostat Timergali Khabiboulline LE Linac
Linac
SRF
HINS
22 Aug 2010
650-v1 SSR1 cold test - FAST/SLOW TUNER - first data Yuriy Pischalnikov LE Linac
Presentations
Linac
SRF
HINS
20 Aug 2010
614-v4 Cavities for the 650 MHz part of CW Project X linac (FNAL-JLAB meeting). Vyacheslav P. Yakovlev et al. SRF
19 Jul 2010
615-v1 Chopper Lattice in TraceWin Nikolay A. Solyak SRF
HINS
20 May 2010
613-v2 Impressions_of_CWRF2010 Sergey Kazakov SRF
19 May 2010
612-v1 Meson Detector Building Plans for Project X and SRF Bob Webber LE Linac
SRF
HINS
17 May 2010
611-v1 A Review of Low β Resonator Performance Gennady Romanov LE Linac
SRF
HINS
14 May 2010
610-v1 SC options for low energy part of Project X linac Gennady Romanov LE Linac
SRF
HINS
14 May 2010
609-v1 Single-spoke Cavity Cryomodule Integration and Fabrication Considerations Iouri Terechkine SRF
HINS
14 May 2010
594-v1 Project X (Tesla Technology Collaboration meeting, April 19, 2010 Robert D Kephart SRF
19 Apr 2010
590-v1 Assumptions about Q values in cw linac Nikolay A. Solyak SRF
07 Apr 2010
444-v1 Intrabeam Stripping Valeri A Lebedev HE Linac
LE Linac
SRF
03 Mar 2010
426-v1 HINS Possibilities for Project X, January 2010 Bob Webber Instrumentation
Presentations
SRF
HINS
26 Jan 2010
297-v1 Cavities and Cryomodules Working Group Summary Mark Champion Presentations
SRF
12 Sep 2009
298-v2 Cryomodule Development at Fermilab Donald Mitchell Presentations
SRF
12 Sep 2009
274-v1 2 GeV linac RF block diagram, Ralph J. Pasquinelli SRF
11 Sep 2009
275-v1 basis of Linac RF costing Ralph J. Pasquinelli SRF
11 Sep 2009
276-v1 cost estimate for CW linac RF systems Ralph J. Pasquinelli SRF
11 Sep 2009
249-v1 Deflecting Cavity for the Beam RF Splitter Vyacheslav P. Yakovlev Presentations
SRF
Transfer Line
01 Sep 2009
234-v1 Cavity rf power vs. detuning Warren Schappert SRF
15 Jul 2009
232-v2 Discussion on cw linac rf power issues Brian E Chase SRF
LLRF
14 Jul 2009
88-v1 Px Overview/Goals of working grp/elliptical cav. Robert D Kephart Presentations
SRF
23 Apr 2009
89-v1 FNAL program and ANL/FNAL infrastructure Shekar Mishra Presentations
SRF
23 Apr 2009
157-v1 Item 1.3.1 to 1.3.2 - BoE for CD-0 Director's Cost Review Mark Champion et al. Directors Reviews
Basis of Estimate
HE Linac
LE Linac
SRF
04 Mar 2009
158-v0 Item 1.3.4 - BoE for CD-0 Director's Cost Review John S Reid Directors Reviews
Basis of Estimate
HE Linac
SRF
04 Mar 2009
202-v1 RF Interlocks - Director's Cost Review Peter Prieto Directors Reviews
Basis of Estimate
SRF
16 Mar 2009
201-v1 Vector Modulators - Director's Cost Review Oleg Nezhevenko Directors Reviews
Basis of Estimate
SRF
16 Mar 2009
200-v1 325MHz & 1300MHz RF Systems - Director's Cost Review John S Reid Directors Reviews
Basis of Estimate
SRF
16 Mar 2009
199-v1 RF Systems Overview - Director's Cost Review John S Reid Directors Reviews
Basis of Estimate
SRF
16 Mar 2009
193-v1 Modulators and Charging Power Supplies - Director's Cost Review Chris Jensen et al. Directors Reviews
Basis of Estimate
SRF
15 Mar 2009
133-v1 SRF Report Giorgio Apolinari et al. Reports
SRF
24 Feb 2009
129-v1 JLab interests and capabilities Andrew Hutton Presentations
SRF
24 Feb 2009
118-v1 ANL interests and capabilities (spokes + ellipticals) Michael P. Kelly Presentations
SRF
24 Feb 2009
113-v1 SRF Pressure Safety at Fermilab Thomas H. Nicol Presentations
SRF
Cryogenics
24 Feb 2009
92-v1 India interest in beta = 0.8 CM and capabilities V. Sahni Presentations
SRF
24 Feb 2009
91-v1 India interest in Spoke resonators A. Roy Presentations
SRF
24 Feb 2009
90-v1 MSU on Beta = 0.8 R&D so far, what is needed, and interests Richard York Presentations
SRF
17 Dec 2008

Number of documents found: 93

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.53 usr + 0.09 sys = 0.62 CPU)