Project X


Document List by Topic


Project X DocDB Home

These documents on Presentations are available:

Project X-doc-# Title Author(s) Topic(s) Last Updated
787-v5 325 MHz Cavity Test Cryostat 2K Conversion Functional Requirements Specification Thomas H. Nicol HINS
325 MHz
SRF
Requirements and Specifications
Presentations
Linac
LE Linac
18 May 2011
1379-v1 PXIE 50 Ohm Fast Kicker: Measurement and Power Test Results of First Half Prototype Alex Z Chen et al. Presentations
18 Jun 2015
1380-v2 200 Ohm MEBT Chopper Development Progress Alex Z Chen et al. Instrumentation
Presentations
10 Jun 2015
1375-v1 PXIE Operating Modes and Timing Events Jim Steimel Presentations
Controls
26 May 2015
1372-v1 Space-Charge Compensation in the PXIE LEBT Jean-Paul Carneiro et al. Presentations
Linac
11 May 2015
1365-v1 Summary for SLHiPP-5 Valeri A Lebedev Reports
Presentations
Linac
15 Apr 2015
1361-v1 PXIE Controls Status Michael J Kucera et al. Presentations
Controls
07 Apr 2015
1359-v1 PXIE LLR Update Brian E Chase Presentations
31 Mar 2015
1358-v2 PXIE LEBT Commissioning Update Lionel R Prost Presentations
LE Linac
25 Mar 2015
1355-v1 HTS Vibration Analsys Jeremiah Holzbauer et al. Presentations
11 Mar 2015
1352-v1 Booster Longitudinal Impedance Valeri A Lebedev Instabilities
Presentations
RCS
10 Feb 2015
1331-v1 Painting in the course of PIP-II injection to Booster Valeri A Lebedev Presentations
RCS
21 Oct 2014
1327-v4 Controls for PXIE and PIP-II Jim Patrick Presentations
Controls
07 Oct 2014
1325-v1 PXIE LEBT Commissioning Update Lionel R Prost Presentations
LE Linac
01 Oct 2014
1319-v1 Results of Hight Power Test of 325 MHz Couplers Sergey Kazakov SRF
Presentations
27 Aug 2014
1318-v1 HIGH POWER DENSITY TEST OF PXIE MEBT ABSORBER PROTOTYPE Curtis Baffes et al. Presentations
26 Aug 2014
1315-v1 PXIE LEBT Emittance Scanner Commissioning Richard D'Arcy Presentations
LE Linac
14 Aug 2014
1312-v1 Proton Capabilities at Fermilab Steve Holmes Presentations
07 Aug 2014
1311-v1 Proton Improvement Plan-II Steve Holmes Presentations
07 Aug 2014
1310-v1 PIP-II Overview: Goals, Status, Strategy Steve Holmes Presentations
07 Aug 2014
1309-v1 MegaWatt Proton Beams for Particle Physics at Fermilab Steve Holmes Presentations
07 Aug 2014
1308-v1 PXIE LEBT Commissioning Status Lionel R Prost Presentations
LE Linac
29 Jul 2014
1307-v1 Intense Beams for Particle Physics Bob Tschirhart Presentations
17 Jul 2014
1298-v1 Tasks for the PIP-II RDR Valeri A Lebedev Presentations
25 Jun 2014
1292-v1 PXIE IS/LEBT Commissioning Update Lionel R Prost Ion Source
Presentations
LE Linac
15 May 2014
1290-v1 Highlights of the trip to SNS on May 5-6, 2014 Alexander Shemyakin et al. Other Labs
Presentations
13 May 2014
1279-v1 Status of Mechanical Design of LEBT_08APR14 Rich Andrews Presentations
09 Apr 2014
1278-v1 PXIE LEBT Commissioning Status Lionel R Prost Presentations
08 Apr 2014
1274-v2 Preparation for the PIP-II RDR Valeri A Lebedev Main Injector
Presentations
LE Linac
01 Apr 2014
1273-v1 Engineering Document Management in Teamcenter Donald Mitchell Project Management
Presentations
25 Mar 2014
1267-v1 Determination of Access controls for PXIE cave during RFQ RF powered operation Anthony F Leveling Reports
Presentations
LE Linac
04 Mar 2014
1263-v1 PXIE Ion Source & LEBT Commissioning Update Rich Andrews et al. Ion Source
Presentations
18 Feb 2014
1261-v1 North American PAC 2013 Conference paper Greg Saewert Hardware
Presentations
13 Feb 2014
1260-v2 PIP-II and PXIE Valeri A Lebedev HE Linac
Presentations
LE Linac
12 Feb 2014
1257-v1 Booster Injection in the Era of PIP-II: A preliminary assessment David E. Johnson Presentations
04 Feb 2014
1244-v1 Progress on RFQ couplers test stand Sergey Kazakov SRF
Presentations
14 Jan 2014
1243-v2 PXIE CAD Model: Status, Responsibilities and Plan Forward Curtis Baffes Presentations
Conventional Facilities
14 Jan 2014
1240-v1 PXIE Ion Source Commissioning Status - Update Bruce Hanna et al. Reports
Ion Source
Presentations
07 Jan 2014
1239-v1 Intensity Frontier materials for a general audience Bob Tschirhart Presentations
26 Dec 2013
1236-v1 Status of HWR Cryomodule Development Peter N Ostroumov SRF
Presentations
17 Dec 2013
1228-v1 PXIE RFQ Status Matt Hoff et al. Presentations
LE Linac
05 Nov 2013
1227-v1 PXIE Ion Source and LEBT Installation Status Lionel R Prost Reports
Front End
Presentations
29 Oct 2013
1215-v1 PXIE Controls Jim Patrick Presentations
Controls
20 Aug 2013
1216-v1 PXIE IS & LEBT Installation Status Report Lionel R Prost Presentations
20 Aug 2013
1209-v2 Summary of Project X Research Program Book Bob Tschirhart Experiments
Presentations
25 Jul 2013
1208-v1 PROJECT X INJECTOR EXPERIMENT: GOALS, PLAN, AND STATUS Steve Holmes et al. Presentations
LE Linac
03 Jul 2013
1207-v1 Modifications of PXIE Shielding Cave Jerry Leibfritz Presentations
Conventional Facilities
24 Jun 2013
1206-v1 The Conceptual Design of the PXIE Beam Dump. Radiation Shielding and PXIE Complex Enclosure Nikolay A. Solyak Absorbers
Presentations
24 Jun 2013
1202-v2 Project X Research Program presentation at the 2013 Fermilab Users Meeting Bob Tschirhart Experiments
Presentations
12 Jun 2013
1203-v1 Project X Accelerator Status: Goals, Status, and Strategy Steve Holmes Presentations
12 Jun 2013
1190-v1 Project X Colloquium at the University of Washington Bob Tschirhart Experiments
Presentations
11 Jun 2013
1198-v1 Update on Project X in the Snowmass Process Bob Tschirhart Experiments
Presentations
10 Jun 2013
1196-v1 650 MHz high beta dressed cavity development plan Timergali Khabiboulline et al. SRF
CW Linac
HE Linac
Presentations
Cavities and Cryomodules
650 MHz
06 Jun 2013
1197-v1 Fermilab Intensity Frontier Research Program Eric J. Prebys Experiments
Presentations
03 Jun 2013
1195-v1 Review of the US Intensity Frontier Research Program at the 'Snowmass on the Pacific Meeting' Bob Tschirhart Experiments
Presentations
03 Jun 2013
1194-v1 Future Fermilab Intensity Frontier Program at the Snowmass ISOUPS meeting Bob Tschirhart Experiments
Presentations
03 Jun 2013
1187-v1 Current Leads for Project X Cold Magnets Thomas J. Peterson Cryogenics
Presentations
14 May 2013
1185-v1 Review of CLFV Facilities Bob Tschirhart Presentations
07 May 2013
1180-v1 Review of DOE Office of Science Facilites Exercise Bob Tschirhart Experiments
Presentations
16 Apr 2013
1177-v1 Intensity Frontier overview to the March 2013 FRA Visting Committee Bob Tschirhart Presentations
29 Mar 2013
1174-v1 PXIE RFQ Update Derun Li Presentations
19 Mar 2013
1165-v1 Power test of a short 50 ohm kicker prototype Ding Sun et al. Reports
Presentations
20 Feb 2013
1158-v1 MEBT BPM Prototype Flange Assembly Design Presentations Matthew L Alvarez Presentations
18 Feb 2013
1137-v1 RF Modeling of the Helical Kicker for Project X Mohamed H A Hassan et al. Instrumentation
Presentations
13 Feb 2013
1154-v1 Project X HEP seminar at Caltech, January 2013 Bob Tschirhart Experiments
Presentations
30 Jan 2013
1151-v1 PXIE MEBT Bunching Cavity Status Update Meiyu Chen et al. Presentations
Cavities and Cryomodules
LE Linac
18 Jan 2013
1147-v1 Project-X Beam Transfer to Booster Brian E Chase et al. Presentations
LE Linac
21 Dec 2012
1144-v1 PXIE MEBT Triplets, Doublets, and Dipole Correctors Vladimir Kashikhin Reports
Front End
Presentations
Linac
Simulations
21 Dec 2012
1141-v1 Chopper Scenarios for injection into Booster (part 1) Brian E Chase et al. Presentations
H- Injection
18 Dec 2012
1139-v1 Project X HEP Seminar at University of Wisconsin Dec 2012 Bob Tschirhart Experiments
Presentations
11 Dec 2012
1136-v1 200 Ohm Chopper Update - Dec. 4, 2012 Greg Saewert Instrumentation
Presentations
04 Dec 2012
1131-v1 PXIE RFQ Installation & Commissioning Plan Vic E Scarpine et al. Front End
Presentations
29 Nov 2012
1135-v1 Project X Plans for Snowmass Bob Tschirhart Experiments
Presentations
29 Nov 2012
1134-v1 Project X Research Program staging plan Bob Tschirhart Experiments
Presentations
29 Nov 2012
1133-v1 Project X Research Program Bob Tschirhart Experiments
Presentations
29 Nov 2012
1121-v2 Snowmass strategy briefing to the Fermilab PPD Intensity Frontier department Bob Tschirhart Experiments
Presentations
27 Nov 2012
1126-v3 PXIE Collaboration Meeting - Ion Source & LEBT Lionel R Prost Presentations
27 Nov 2012
1129-v1 PXIE LEBT studies at LBNL Qing Ji Presentations
27 Nov 2012
1128-v1 PXIE RFQ report Derun Li Presentations
27 Nov 2012
1127-v1 PXIE goals and plan Sergei Nagaitsev Presentations
27 Nov 2012
1125-v1 Project X presentation to the NuFACT meeting in July 2012 Bob Tschirhart Experiments
Presentations
26 Nov 2012
1124-v1 Project-X presentation to the CIPANP meeting, May 2012 Bob Tschirhart Experiments
Presentations
26 Nov 2012
1123-v1 Muon Physics in the Project X era Bob Tschirhart Experiments
Presentations
26 Nov 2012
1122-v1 Project X outreach presentation at the November 2012 Physics Slam Bob Tschirhart Experiments
Presentations
26 Nov 2012
1120-v1 Project X Research Program presentation to Fermilab PAC Oct 2012 Bob Tschirhart Experiments
Presentations
26 Nov 2012
1115-v2 Summary of Recent Research Program Activities Bob Tschirhart Experiments
Presentations
16 Nov 2012
1113-v1 Project X: Technolgy, Perspectives, and Applications Steve Holmes Presentations
05 Nov 2012
1110-v1 RFQ coupler Sergey Kazakov Presentations
LE Linac
25 Oct 2012
1107-v1 PXIE MEBTstatus and plans for FY2013 Alexander Shemyakin Reports
Front End
Presentations
16 Oct 2012
1098-v3 Proposal for a ‘Phase I’ PXIE LEBT Bruce Hanna et al. Experiments
Presentations
Space Charge Effects
02 Oct 2012
1086-v1 MEBT Buncher Cavity pre-Design Review Meiyu Chen et al. Reviews
Presentations
162.5 MHz
19 Jul 2012
1078-v1 Ion Source and LEBT Statuses Lionel R Prost Ion Source
Front End
Presentations
LE Linac
03 Jul 2012
1076-v1 Project X Physics Study W&C June 22nd 2012 Bob Tschirhart Presentations
29 Jun 2012
1075-v1 Summary of Project X Physics Study Bob Tschirhart Experiments
Presentations
29 Jun 2012
1073-v1 PXIE Machine Protection System Jim Steimel et al. Accelerator Physics & System Integration
CW Linac
Presentations
26 Jun 2012
1070-v1 Project X Research Program presentation to the June 2012 PAC Bob Tschirhart Experiments
Presentations
19 Jun 2012
1069-v2 Project X: Accelerator Goals and Challenges Steve Holmes Presentations
16 Jun 2012
1063-v1 Project X presentation to the May 2012 IPAC meeting Bob Tschirhart Presentations
04 Jun 2012
1062-v1 Project X presentation to the CIPANP conference Bob Tschirhart Presentations
04 Jun 2012
1056-v1 Project X chopper update (5/16/12) Tao Tang Instrumentation
Other Labs
Presentations
Linac
16 May 2012
1055-v1 SLAC Project-X RF Development (May 16 2012) Rosa Ciprian et al. Other Labs
Presentations
Linac
16 May 2012
1052-v1 Project X and the Endless Frontier Bob Tschirhart Experiments
Presentations
11 May 2012
1049-v1 Staging Opportunities for Project X Steve Holmes Presentations
08 May 2012
1048-v1 Summary of Project X interactions with the LBNE reconfiguration study Bob Tschirhart Friday Meeting
Presentations
04 May 2012
1046-v1 BARC IIFC on Instrumentation - April 2012 Visit Summary Gopal Joshi et al. Instrumentation
Collaboration
Other Labs
Presentations
03 May 2012
1037-v1 SSR1 Cryomodule Development - Project X Collaboration Meeting - April 10-12, 2012 Thomas H. Nicol SRF
Presentations
13 Apr 2012
1036-v1 Project X Beta = 0.9, 650 MHz, Cavity and Cryomodule Status Thomas J. Peterson Cryogenics
SRF
Presentations
12 Apr 2012
1034-v1 PX front end SC cavity design and measurements Timergali Khabiboulline SRF
Presentations
Cavities and Cryomodules
12 Apr 2012
1033-v1 Cavity Test Stands for Project X Andy Hocker SRF
Presentations
11 Apr 2012
1032-v1 Cavity Processing Issues for Project X Allan M Rowe Presentations
11 Apr 2012
1031-v1 PXIE Beam Diagnostics Manfred Wendt Instrumentation
Presentations
11 Apr 2012
1029-v2 RF Power Sources for PXIE LBNL collaboration meeting Ralph J. Pasquinelli Presentations
11 Apr 2012
1022-v3 PXIE Vacuum Concept Alex Z Chen Presentations
11 Apr 2012
1028-v3 200Ohm Chopper R&D Progress Greg Saewert Instrumentation
Front End
Presentations
10 Apr 2012
1025-v2 PXIE Overview: Goals, Concepts and Planning Sergei Nagaitsev Presentations
09 Apr 2012
1026-v2 Project X: News, Strategy, Meeting Goals Steve Holmes Presentations
09 Apr 2012
1024-v1 MEBT Buncher Cavities.Por Gennady Romanov Presentations
08 Apr 2012
1023-v1 Bunch-by-Bunch Kicker and its Driver: 50  choice Ralph J. Pasquinelli et al. Instrumentation
Absorbers
Presentations
08 Apr 2012
1009-v1 Updates on Broadband Chopper Driver Development in SLAC (Mar. 2012) Tao Tang Instrumentation
Other Labs
Presentations
Linac
08 Mar 2012
1011-v1 EM analysis of a helical electrode for a broadband chopper Manfred Wendt Instrumentation
Presentations
Linac
Simulations
08 Mar 2012
1010-v1 SLAC Project-X RF Development, March 7 2012 Rosa Ciprian Other Labs
Presentations
Linac
08 Mar 2012
1006-v4 PXIE Accelerator Physics Valeri A Lebedev Reviews
Presentations
06 Mar 2012
1007-v2 SSR1 cryomodule for PXIE - PXIE review - March 6-7, 2012 Thomas H. Nicol Reviews
Presentations
06 Mar 2012
1008-v2 PXIE HWR Cryomodule Peter N Ostroumov Reviews
Presentations
05 Mar 2012
1005-v1 RF Power Sources for PXIE Ralph J. Pasquinelli Reviews
SRF
Presentations
05 Mar 2012
1001-v1 PXIE Review - Ion Source & LEBT Qing Ji et al. Reviews
Presentations
05 Mar 2012
984-v1 Beam Diagnostic Instrumentation for PXIE Vic E Scarpine Instrumentation
Presentations
17 Jan 2012
972-v1 PXIE Vacuum Considerations Alex Z Chen et al. Presentations
21 Dec 2011
963-v1 Electron Beam Dynamics Simulations for the Proposed Test of the PXIE/Project X MEBT Absorber Lionel R Prost et al. Experiments
Absorbers
Presentations
Simulations
15 Nov 2011
959-v1 Project X Update Steve Holmes Presentations
09 Nov 2011
953-v1 Project X: Status and Plans Steve Holmes Presentations
28 Oct 2011
950-v1 Project X: Status, Strategy, Meeting Goals Steve Holmes Collaboration
Presentations
26 Oct 2011
949-v1 SSR1 cryomodule for PXIE - Project X collaboration meeting - October 26, 2011 Thomas H. Nicol Presentations
26 Oct 2011
944-v1 Project X Reference Design and R&D Plan Sergei Nagaitsev Presentations
24 Oct 2011
940-v1 Project X Pulsed Linac, Overview and plans Nikolay A. Solyak Presentations
Linac
23 Oct 2011
937-v1 Progress report on fast kicker (cooling version) Valeri A Lebedev et al. Presentations
19 Oct 2011
921-v1 Front End Test Facility Sergei Nagaitsev Presentations
19 Aug 2011
913-v1 Notes from the SPL & ESS Collaboration Meeting Manfred Wendt Presentations
08 Jul 2011
903-v1 Project X Upgrade Options for 4 MW at 8 GeV Sergei Nagaitsev Presentations
05 Jul 2011
893-v2 Beam chopping for injection into RR/MI Sergei Nagaitsev Presentations
H- Injection
25 May 2011
889-v1 Design Limitations for MEBT Kicker Valeri A Lebedev Presentations
17 May 2011
877-v1 Project X: A New Multi-Megawatt Proton Source at Fermilab Sergei Nagaitsev Presentations
05 May 2011
874-v1 Bandwidth Considerations for the Project X Fast Kicker Brian E Chase Presentations
03 May 2011
872-v1 SNS/ProjectX Commissioning/Infrastructure Willem Blokland Operations
Instrumentation
Instabilities
Presentations
Linac
Controls
22 Apr 2011
871-v1 Beam Diagnostics: Requirements David E. Johnson et al. Instrumentation
Presentations
Linac
22 Apr 2011
870-v1 Beam Diagnostics & Beam Studies at HINS / MDB Vic E Scarpine Instrumentation
HINS
Presentations
Linac
22 Apr 2011
869-v1 Beam Loss Monitors operating at Cryogenic Temperature with FPGA- Based TDC Signal Processing Arden A. Warner et al. Instrumentation
Presentations
Linac
22 Apr 2011
868-v1 Propagation and noise experiments for a fiber-delivered laser wire John M Byrd et al. Instrumentation
Collaboration
Presentations
Linac
22 Apr 2011
866-v1 High Power Fast Faraday Cup R&D Craig Deibele et al. Instrumentation
Collaboration
Presentations
Linac
22 Apr 2011
865-v1 BPMs as Phase Monitors Craig Deibele Instrumentation
Collaboration
Presentations
Linac
22 Apr 2011
864-v1 Considerations for FET-based Broadband Chopper Modulator Craig Burkhart et al. Instrumentation
Collaboration
Presentations
Linac
22 Apr 2011
863-v1 Status of the Kicker R&D for a Broadband Chopper Greg Saewert et al. Instrumentation
Presentations
Linac
22 Apr 2011
844-v1 Front End WG: Introduction Sergei Nagaitsev Presentations
12 Apr 2011
843-v1 Project X Reference Design Overview Sergei Nagaitsev Presentations
12 Apr 2011
841-v1 Project X - A New Multi-MW Proton Source at Fermilab Sergei Nagaitsev Presentations
07 Apr 2011
840-v1 Project X Cryomodule Configurations Thomas H. Nicol 325 MHz
Cryogenics
Presentations
Cavities and Cryomodules
LE Linac
22 Mar 2011
832-v1 CW Re-Buncher Cavity Design for Project X Gennady Romanov Presentations
LE Linac
09 Mar 2011
831-v1 FNAL RFQ Studies for Project-X Andrey Kolomiets et al. Presentations
LE Linac
09 Mar 2011
834-v1 Project X Front End Workshop Sergei Nagaitsev Presentations
09 Mar 2011
830-v1 Project X Poster at InPAC 2011 Jim Kerby Project Management
Presentations
07 Mar 2011
829-v1 Project X Overview Talk at InPAC2011 Jim Kerby Project Management
Presentations
07 Mar 2011
824-v1 650 MHz Cryomodule, Stand-alone TESLA-style Thomas J. Peterson Cryogenics
HE Linac
Presentations
10 Feb 2011
823-v1 Solenoid Lenses for SSR Cryomodules Iouri Terechkine HINS
SRF
Presentations
Linac
10 Feb 2011
816-v1 Project X Front-end concept for 162.5 MHz RFQ Alexander Vostrikov Presentations
Linac
04 Feb 2011
814-v1 Cryomodule Helium Pressure Stability Thomas J. Peterson Cryogenics
Instabilities
HE Linac
Presentations
30 Jan 2011
809-v1 Design studies of 162.5 MHz RFQ Sunny Lalitha sanyasirao Sista venugopal Presentations
Linac
LE Linac
20 Jan 2011
803-v1 Project-X Front-End Update John Staples Front End
Other Labs
Presentations
15 Dec 2010
802-v1 Project X update Sergei Nagaitsev Presentations
14 Dec 2010
798-v1 Possible Configurations for Prototypes of PX Cryomodules: SSR0 and SSR1 Iouri Terechkine HINS
SRF
Presentations
Linac
LE Linac
10 Dec 2010
792-v2 Chopping and Limitations to MEBT Valeri A Lebedev Absorbers
Presentations
LE Linac
Space Charge Effects
Transfer Line
03 Dec 2010
797-v1 Broadband Chopper Manfred Wendt Presentations
03 Dec 2010
796-v1 Project X: A Multi-MW Proton Source at Fermilab Steve Holmes Presentations
02 Dec 2010
793-v1 Scenarios with 325 and 162.5 MHz linac bunches Sergei Nagaitsev Experiments
Presentations
Linac
01 Dec 2010
786-v1 Project-X Presentation to the Fermilab PAC Bob Tschirhart Presentations
13 Nov 2010
785-v1 Project X: A Multi-MW Proton Source at Fermilab Steve Holmes Presentations
10 Nov 2010
783-v1 325 MHz Spoke Cavity Status and FY11 Plans Bob Webber HINS
SRF
Presentations
Linac
LE Linac
04 Nov 2010
780-v1 RF Issues with Configuration Options Brian E Chase Presentations
02 Nov 2010
773-v1 Front-end R&D Plans - SSR Prototype and Chopper Section Bob Webber HINS
Presentations
Linac
LE Linac
01 Nov 2010
770-v1 SSR1 Cryomodule Status Thomas H. Nicol HINS
SRF
Presentations
Linac
LE Linac
01 Nov 2010
767-v1 MEBT Chopper Beam Dump Nikolai Mokhov HINS
Presentations
Linac
LE Linac
27 Oct 2010
750-v1 Integration of the SSR cryomodules into the Project X cryo system and implications for the SSR1 prototype Thomas J. Peterson Cryogenics
Presentations
30 Sep 2010
748-v1 IIFC on Instrumentation and Controls TS Ananthakrishnan et al. Instrumentation
Other Labs
Presentations
Linac
Controls
24 Sep 2010
706-v1 RF Controls Strategies Brian E Chase Presentations
LLRF
08 Sep 2010
715-v2 ESS Opportunities Andreas Jansson Instrumentation
Other Labs
Presentations
08 Sep 2010
713-v3 Laser Diagnostics John M Byrd et al. Instrumentation
Other Labs
Presentations
08 Sep 2010
721-v2 Project X: Status, Strategy, Meeting Goals Steve Holmes Collaboration
Presentations
08 Sep 2010
704-v1 MOSFET Chopper Tao Tang HINS
Other Labs
Presentations
Linac
07 Sep 2010
725-v2 FRIB Instrumentation Saeed Assadi Instrumentation
Other Labs
Presentations
07 Sep 2010
731-v1 RFQ Activities in India Sunny Lalitha sanyasirao Sista venugopal Collaboration
Presentations
Linac
LE Linac
07 Sep 2010
678-v1 SNS Diagnostics John D Galambos Other Labs
Presentations
07 Sep 2010
714-v0 SNS Activities Willem Blokland None
04 Sep 2010
716-v1 H- Ion Source for Project X Qing Ji Ion Source
Presentations
Linac
LE Linac
07 Sep 2010
659-v1 Laser Chopper for Project X David E. Johnson Presentations
03 Sep 2010
657-v1 Third Report on SSR1-01 RF Results in MDB Cryostat and Power Coupler Qext Calculations Timergali Khabiboulline HINS
SRF
Presentations
Linac
LE Linac
27 Aug 2010
654-v2 HINS Report for DOE Site Visit - B&R Code KA15-02-011_August_23_2010 Bob Webber HINS
SRF
Presentations
Linac
LE Linac
23 Aug 2010
650-v1 SSR1 cold test - FAST/SLOW TUNER - first data Yuriy Pischalnikov HINS
SRF
Presentations
Linac
LE Linac
20 Aug 2010
642-v1 Optimization of Wire Scanner position for HINS Energy Spread Measurement Eliana Gianfelice-Wendt Instrumentation
HINS
Presentations
Simulations
LE Linac
04 Aug 2010
635-v4 Project-X presentation for ICHEP Bob Tschirhart Presentations
02 Aug 2010
633-v1 HINS Six-Cavity Test Presentation to PX Front-End Meeting Bob Webber HINS
Presentations
LE Linac
07 Jul 2010
630-v1 Analysis of CC2 data at 4K Gustavo I Cancelo Presentations
Controls
LLRF
30 Jun 2010
620-v1 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
06 Jun 2010
617-v1 PX_solyak_lattice_front-end_in_HINS_Cave Bob Webber HINS
Presentations
LE Linac
26 May 2010
600-v3 An Estimate of Orbit Correction for SSR0 section of the Project X Valeri A Lebedev HINS
Presentations
Linac
12 May 2010
598-v1 HINS Beam Absorber MARS15 Simulations (extended) Nikolai Mokhov HINS
Absorbers
Presentations
30 Apr 2010
450-v3 Project X CW linac design Nikolay A. Solyak Presentations
Linac
26 Mar 2010
447-v2 Project X Update Vyacheslav P. Yakovlev et al. Presentations
Linac
24 Mar 2010
452-v1 Using Booster, Switchyard and MI-8 in Project X Robert M. Zwaska et al. Presentations
20 Mar 2010
451-v1 Project X Status and Strategy Steve Holmes Presentations
17 Mar 2010
449-v1 The Front-End System Study of Project X Derun Li Presentations
16 Mar 2010
448-v1 Project X Status Report Sergei Nagaitsev Presentations
16 Mar 2010
442-v1 A Multi-Stripline Chopper with individual MOSFET Drivers Manfred Wendt Instrumentation
Presentations
Linac
02 Mar 2010
441-v2 Options for Locating 325MHz Cryomodule Test Stand at MDB Bob Webber HINS
Presentations
24 Feb 2010
438-v1 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
16 Feb 2010
430-v1 Design concepts for a pulsed multi-GeV H¯ LINAC Peter N Ostroumov HINS
Presentations
Linac
03 Feb 2010
426-v1 HINS Possibilities for Project X, January 2010 Bob Webber Instrumentation
HINS
SRF
Presentations
26 Jan 2010
416-v1 Lifetime of Stark States Hydrogen Atom in Magnetic Field Calculation and Estimation of Losses at Stripping Injection Alexandr Drozhdin et al. Main Injector
Presentations
RCS
20 Jan 2010
421-v1 Overview of proton drivers for neutrino super beams and neutrino factories Weiren Chou Main Injector
Presentations
Linac
RCS
20 Jan 2010
352-v1 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
07 Jan 2010
335-v1 Design and Engineering Limitations for SSR1 Cavities and Cryomodules Thomas H. Nicol Presentations
LE Linac
16 Dec 2009
334-v1 Project X Linac: Beam Preparation and Distribution Iouri Terechkine et al. Presentations
LE Linac
09 Dec 2009
330-v1 SPL Meeting impressions Vyacheslav P. Yakovlev Presentations
Linac
25 Nov 2009
327-v1 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
05 Nov 2009
278-v2 RFQ Studies John Staples Collaboration
Presentations
LE Linac
12 Sep 2009
306-v1 325 MHz Couplers Timergali Khabiboulline Collaboration
Presentations
LE Linac
12 Sep 2009
305-v1 1.3 GHz Couplers Chris Adolphsen Collaboration
HE Linac
Presentations
12 Sep 2009
304-v1 Triple Spoke Cavities for a CW Linac Peter N Ostroumov Collaboration
Presentations
LE Linac
12 Sep 2009
303-v1 Linac Design: Single Spoke Cavities Vyacheslav P. Yakovlev Collaboration
Presentations
LE Linac
12 Sep 2009
302-v1 Front End Derun Li Collaboration
Presentations
LE Linac
12 Sep 2009
301-v1 Overall Linac Design, 1.3 GHz Cavities Nikolay A. Solyak Collaboration
HE Linac
Presentations
12 Sep 2009
300-v1 RF Working Group Summary Leigh Harwood et al. Collaboration
HE Linac
Presentations
LE Linac
LLRF
12 Sep 2009
299-v1 RCS and Transfer Line WG Summary David E. Johnson et al. Collaboration
Presentations
RCS
Transfer Line
12 Sep 2009
295-v2 Summary Instrumentation & Controls Working Group Willem Blokland Instrumentation
Presentations
Controls
12 Sep 2009
297-v1 Cavities and Cryomodules Working Group Summary Mark Champion SRF
Presentations
12 Sep 2009
298-v2 Cryomodule Development at Fermilab Donald Mitchell SRF
Presentations
12 Sep 2009
294-v2 Linac WG summary Sergei Nagaitsev Collaboration
Presentations
Linac
12 Sep 2009
277-v2 Project X ICD-1 and ICD-2 Overview Sergei Nagaitsev Collaboration
Presentations
12 Sep 2009
264-v3 xTCA for Physics Standards - Progress & Applications Summary for Project X Collaboration Ray Larsen Instrumentation
Presentations
Controls
12 Sep 2009
291-v2 Longitudinal Laser Wire for Project X / HINS John M Byrd Instrumentation
Presentations
12 Sep 2009
281-v2 MI/RR Space Charge Simulations with Synergia James F Amundson et al. Collaboration
Main Injector
Presentations
Simulations
Space Charge Effects
11 Sep 2009
258-v2 Cryomodule design changes for ICD-2 Arkadiy Klebaner Presentations
11 Sep 2009
284-v5 RCS High Power RF System John S Reid Presentations
11 Sep 2009
282-v1 Project X Control System Jim Patrick Presentations
Controls
11 Sep 2009
270-v3 Linac Design - Chopper Ideas Bob Webber Presentations
Linac
11 Sep 2009
279-v1 HINS as a Beam Diagnostics Test Facility Vic E Scarpine Instrumentation
Presentations
11 Sep 2009
273-v1 RCS for Project-X Valeri A Lebedev Presentations
Space Charge Effects
11 Sep 2009
271-v1 Project X Physics Program Review Bob Tschirhart Collaboration
Presentations
11 Sep 2009
262-v1 Fermi Timing Systems and Project X Gregory L. Vogel Instrumentation
Presentations
Controls
10 Sep 2009
266-v1 Bunch Shape Monitor for HINS Wai-Ming Tam Instrumentation
Presentations
10 Sep 2009
268-v1 E-Beam Scanner R&D Randy M Thurman-Keup Instrumentation
Presentations
10 Sep 2009
265-v1 Experience on SNS Beam Instrumentation Collaborations Willem Blokland Instrumentation
Presentations
Controls
10 Sep 2009
263-v1 Collaboration Opportunities on Project X Beam Instrumentation Manfred Wendt Instrumentation
Presentations
10 Sep 2009
253-v3 Review Transfer/Injection R&D Plan – Siting Issues David E. Johnson Collaboration
Presentations
Transfer Line
10 Sep 2009
261-v1 Design Considerations for CW SRF Linacs Arkadiy Klebaner et al. Cryogenics
Presentations
10 Sep 2009
259-v1 Project X ICD-2 Cryogenic System Overview Jay C. Theilacker Cryogenics
Presentations
10 Sep 2009
250-v5 Project X: Introduction, Strategy, and Collaboration Meeting Goals Steve Holmes Presentations
10 Sep 2009
251-v1 Project X ICD-1 Cryogenics and associated RD&D Plan Overview Arkadiy Klebaner Cryogenics
Presentations
10 Sep 2009
252-v1 J-PARC RCS Injection Issues Pranab K Saha Collaboration
Other Labs
Absorbers
Presentations
H- Injection
10 Sep 2009
249-v1 Deflecting Cavity for the Beam RF Splitter Vyacheslav P. Yakovlev SRF
Presentations
Transfer Line
01 Sep 2009
248-v1 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
31 Aug 2009
247-v1 Project X ICD2 briefing Sergei Nagaitsev Presentations
21 Aug 2009
227-v1 HINS Status Report for June 19, 2009 Project X Meeting Bob Webber HINS
Presentations
19 Jun 2009
221-v1 ACD proton front end Sergei Nagaitsev Presentations
LE Linac
17 Jun 2009
218-v2 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
14 Jun 2009
216-v1 Project-X ACD write-up Valeri A Lebedev Basis of Estimate
Presentations
02 Jun 2009
211-v2 Project X at Fermilab: Prospects and Plans Steve Holmes Presentations
08 May 2009
21-v1 High Energy Linac Overview Sergei Nagaitsev HE Linac
Presentations
23 Apr 2009
108-v1 Beam physics, linac lattice Peter N Ostroumov Presentations
Linac
23 Apr 2009
137-v1 Fermilab proposal for the PrX Linac RF distribution Oleg Nezhevenko Presentations
Linac
23 Apr 2009
138-v1 CERN interests/views Roland Garoby Presentations
Linac
23 Apr 2009
139-v1 LLRF and other activities (LBNL) Lawrence Doolittle Presentations
Linac
23 Apr 2009
98-v1 Present details of transfer line and injection ICD David E. Johnson Recycler
Presentations
23 Apr 2009
99-v1 Recycler Lattice Meiqin Xiao Recycler
Presentations
23 Apr 2009
100-v1 Transverse phase space painting Alexandr Drozhdin et al. Recycler
Presentations
23 Apr 2009
101-v1 Laser stripping Robert M. Zwaska Presentations
H- Injection
23 Apr 2009
102-v1 Injection absorber design Igor L Rakhno et al. Presentations
H- Injection
23 Apr 2009
103-v1 Footprint and Siting Issues David E. Johnson Recycler
Presentations
23 Apr 2009
104-v1 PS2 Injection: thoughts and concerns Brennan Goddard Recycler
Presentations
23 Apr 2009
88-v1 Px Overview/Goals of working grp/elliptical cav. Robert D Kephart SRF
Presentations
23 Apr 2009
89-v1 FNAL program and ANL/FNAL infrastructure Shekar Mishra SRF
Presentations
23 Apr 2009
112-v1 Superconducting Accelerator Segmentation Overview Jay C. Theilacker Cryogenics
Presentations
23 Apr 2009
181-v2 Project X Directors Review - Controls Jim Patrick Basis of Estimate
Presentations
Controls
Directors Reviews
16 Mar 2009
190-v1 PX Dir Review 8 GeV Transport Line Components David E. Johnson Basis of Estimate
Presentations
Directors Reviews
Transfer Line
15 Mar 2009
189-v1 PX Dir Review 8 GeV Injection Components David E. Johnson Basis of Estimate
Presentations
Directors Reviews
H- Injection
15 Mar 2009
188-v2 Project Management Overview - Director's Review Steve Holmes Presentations
Directors Reviews
15 Mar 2009
175-v2 PX Dir Review 8 GeV level 2 Overview David E. Johnson Presentations
Directors Reviews
Transfer Line
H- Injection
15 Mar 2009
176-v2 Introduction and Overview - Director's Cost Review Steve Holmes Presentations
Directors Reviews
13 Mar 2009
178-v1 Project X: Initial Configuration Paul Derwent Instrumentation
HINS
Cryogenics
Main Injector
Recycler
Presentations
Linac
Controls
Directors Reviews
Transfer Line
Conventional Facilities
13 Mar 2009
129-v1 JLab interests and capabilities Andrew Hutton SRF
Presentations
24 Feb 2009
147-v1 PrX SC quads/solenoids Michael A Tartaglia Presentations
Linac
24 Feb 2009
128-v1 SLAC interest in Px RF equipment (dist, klystrons, modulators), RF R&D needed Chris Adolphsen Presentations
Linac
24 Feb 2009
127-v1 HINS Solenoids Head Load Thomas M. Page Cryogenics
Presentations
24 Feb 2009
126-v1 NML Cryogenic System Overview Alexander Martinez Cryogenics
Presentations
24 Feb 2009
125-v1 The 1.3 GHzCryomodule Heat Load Thomas J. Peterson Cryogenics
Presentations
24 Feb 2009
124-v1 MI Collimation experience Bruce C. Brown Main Injector
Presentations
24 Feb 2009
123-v1 Review of MI e-cloud simulations Miguel A Furman Main Injector
Presentations
24 Feb 2009
122-v1 MI e-cloud measurements Robert M. Zwaska Main Injector
Presentations
24 Feb 2009
121-v1 How to design/build top loaded cryostats Joel D. Fuerst Cryogenics
Presentations
24 Feb 2009
120-v1 Cornell interests and capabilities Maury Tigner Presentations
Linac
24 Feb 2009
119-v1 SLAC proposals for PrX (1.3) couplers Chris Adolphsen Presentations
Linac
24 Feb 2009
140-v1 PrX coupler requirements Nikolay A. Solyak et al. Presentations
Linac
24 Feb 2009
118-v1 ANL interests and capabilities (spokes + ellipticals) Michael P. Kelly SRF
Presentations
24 Feb 2009
117-v1 Intro to PrX front end/Low Beta Cavities Bob Webber Presentations
LE Linac
24 Feb 2009
116-v1 Linac lattice requirements on cryomodules Peter N Ostroumov Presentations
Linac
Conventional Facilities
24 Feb 2009
115-v1 Present initial draft of RD&D plan David E. Johnson Recycler
Presentations
24 Feb 2009
114-v1 Present current R&D issues David E. Johnson Recycler
Presentations
24 Feb 2009
113-v1 SRF Pressure Safety at Fermilab Thomas H. Nicol Cryogenics
SRF
Presentations
24 Feb 2009
111-v1 Potential Cryogenic Cycles Dana Arenius Presentations
Conventional Facilities
24 Feb 2009
110-v1 Project X Cryogenic System Overview Arkadiy Klebaner Cryogenics
Presentations
24 Feb 2009
109-v1 Presentation of possible Project X Beam Instrumentation R&D projects Vic E Scarpine et al. Instrumentation
Presentations
24 Feb 2009
92-v1 India interest in beta = 0.8 CM and capabilities V. Sahni SRF
Presentations
24 Feb 2009
91-v1 India interest in Spoke resonators A. Roy SRF
Presentations
24 Feb 2009
107-v1 Experience with the RHIC yt-jump system Thomas Roser Main Injector
Presentations
24 Feb 2009
105-v1 Review of MI Issues Ioanis Kourbanis Main Injector
Presentations
24 Feb 2009
106-v1 New rf system requirements/preliminary design John S Reid Main Injector
Presentations
24 Feb 2009
143-v1 Accelerator Issues of Project X 8/7/2007 Dave McGinnis Reports
Presentations
Linac
28 Jan 2009
90-v1 MSU on Beta = 0.8 R&D so far, what is needed, and interests Richard York SRF
Presentations
17 Dec 2008
97-v1 A Personal View of Beam Instrumentation Collaborations Manfred Wendt Instrumentation
Presentations
02 Dec 2008
95-v2 Overview of SNS Beam Instrumentation (Incl. Collaboration Aspects) Willem Blokland Instrumentation
Presentations
02 Dec 2008
96-v1 HINS Beam Instrumentation R&D Vic E Scarpine Instrumentation
Presentations
02 Dec 2008
94-v1 Project X Initial Configuration Overview Paul Derwent Presentations
02 Dec 2008
93-v1 Project X Introduction, Strategy, and Collaboration Goals Steve Holmes Presentations
02 Dec 2008
84-v2 XYZ Valeri A Lebedev et al. Presentations
25 Nov 2008
87-v1 Project X Presentation to Linear Collider Workshop 11-16-08 Steve Holmes Presentations
17 Nov 2008
86-v1 Project X Talk to HEPAP 11-13-08 Steve Holmes Presentations
14 Nov 2008
82-v1 AP&T Seminar 30 Oct 08 on the ICD Paul Derwent Project Management
Presentations
30 Oct 2008
78-v1 120 GeV Targeting James Hylen Reviews
Targetting
Presentations
07 Oct 2008
77-v1 Recycler 8.9 GeV/c Extraction David E. Johnson Reviews
Recycler
Presentations
07 Oct 2008
76-v1 Project X Main Injector Valeri A Lebedev Reviews
Main Injector
Presentations
07 Oct 2008
75-v1 Project-X Related Issues in Recycler Alexander A Valishev Reviews
Recycler
Presentations
07 Oct 2008
74-v1 Project X: 8 GeV Recycler Injection David E. Johnson Reviews
Presentations
H- Injection
07 Oct 2008
73-v1 Project X Linac Giorgio Apolinari Reviews
Presentations
Linac
07 Oct 2008
72-v1 Project X Overview Dave McGinnis Reviews
Presentations
07 Oct 2008
67-v1 Issues and Challenges of High Power Targets for Muon Colliders Kirk T McDonald Targetting
Presentations
01 Oct 2008
66-v1 Experimental Radiation Damage Assessment of High Power Accelerator Targets Nikolaos Simos Targetting
Presentations
01 Oct 2008
65-v1 Issues with Liquid vs. Solid Targets John C Sheppard Targetting
Presentations
01 Oct 2008
64-v1 IHEP 2 Megawatt Target Design James Hylen Targetting
Presentations
01 Oct 2008
63-v1 High Power Targets for Project X and Beyond Kirk T McDonald Targetting
Presentations
01 Oct 2008
62-v1 Activation and Remote Handling John C Sheppard Targetting
Presentations
01 Oct 2008
61-v1 Engineering Issues for the NuMI Beamline at 2 MW Patrick G Hurh Targetting
Presentations
01 Oct 2008
60-v1 Modeling of Ring Performance Robert D Ryne Main Injector
Recycler
Presentations
Simulations
01 Oct 2008
59-v1 Injection and Extraction David E. Johnson Main Injector
Recycler
Presentations
Transfer Line
01 Oct 2008
58-v1 Transverse Damper Phil Adamson Main Injector
Instabilities
Recycler
Presentations
01 Oct 2008
57-v1 RF System and Beam Loading Compensation John S Reid Main Injector
Recycler
Presentations
01 Oct 2008
56-v1 Transition Crossing Simulations Ioanis Kourbanis Main Injector
Presentations
Simulations
01 Oct 2008
55-v1 Gamma Transition Jump Weiren Chou et al. Main Injector
Presentations
01 Oct 2008
54-v1 Present MI Operation and Near Future Plans Ioanis Kourbanis Operations
Main Injector
Presentations
01 Oct 2008
53-v1 SNS Laser Stripping Development Aleksandrov V Aleksandrov Other Labs
Presentations
H- Injection
01 Oct 2008
52-v1 Transfer lines, H- stripping and injection Deepak Raparia Presentations
Transfer Line
H- Injection
01 Oct 2008
51-v1 Present RR operation Consolato Gattuso Operations
Recycler
Presentations
01 Oct 2008
50-v1 Beam Loss and Collimation Nikolai Mokhov Main Injector
Absorbers
Presentations
01 Oct 2008
49-v1 Electron Cloud, EP Instability and Requirements for Vacuum Miguel A Furman Main Injector
Instabilities
Recycler
Presentations
01 Oct 2008
48-v1 Theoretical Expectations for Instabilities Alexey V Burov Main Injector
Instabilities
Recycler
Presentations
01 Oct 2008
47-v1 Experimental Observations of Instabilities at Main Injector Ioanis Kourbanis Main Injector
Instabilities
Presentations
01 Oct 2008
45-v1 Linac Instrumentation Nathan Eddy Instrumentation
Presentations
Linac
01 Oct 2008
44-v1 Electron source at a 2-GeV location Philippe Piot Presentations
Linac
01 Oct 2008
43-v1 MSU Collaboration Report - Beta 0.8 Cavities Walter Hartung Other Labs
Presentations
Linac
01 Oct 2008
42-v1 Automated Linac Re-tuning John D Galambos Presentations
Linac
01 Oct 2008
41-v1 PrX Civil Construction and Layout Dixon Bogert Presentations
Linac
Conventional Facilities
01 Oct 2008
40-v1 Cryo Systems Needed for Project X Arkadiy Klebaner Cryogenics
Presentations
Linac
01 Oct 2008
39-v1 Berkeley Collaboration Report - Buncher Cavities and LLRF Alessandro Ratti Other Labs
Presentations
LE Linac
01 Oct 2008
38-v1 Brookhaven Collaboration Report - Instrumentation Roger Connolly Instrumentation
Other Labs
Presentations
LE Linac
01 Oct 2008
37-v1 Argonne Collaboration Report - Accelerator Physics and Spoke Cavities Donald F Geesaman Other Labs
Presentations
LE Linac
01 Oct 2008
36-v1 History of SNS Design and Decisions Robert L Kustom Other Labs
Presentations
LE Linac
01 Oct 2008
35-v1 LLRF Challenges Brian E Chase HE Linac
Presentations
01 Oct 2008
34-v1 RF Distribution for Project X Christopher Nantista HE Linac
Presentations
01 Oct 2008
33-v1 Project X and ILC: Differences and Similarities Chris Adolphsen HE Linac
Presentations
01 Oct 2008
31-v1 SC Spoke Cavity Design and Status Timergali Khabiboulline Presentations
LE Linac
01 Oct 2008
32-v1 Superconducting Solenoid Design Iouri Terechkine Presentations
LE Linac
01 Oct 2008
30-v1 Room Temperature Cavity Design Gennady Romanov Presentations
LE Linac
30 Sep 2008
29-v1 325 MHz RF Distribution Alfred Moretti Presentations
LE Linac
30 Sep 2008
28-v1 SNS Superconducting Linac operating experience and issues Isidoro E Campisi Other Labs
Presentations
Linac
30 Sep 2008
27-v1 What It Will Take to Produce 1 Cryomodule per Month Robert D Kephart Cryogenics
Presentations
30 Sep 2008
24-v1 120 GeV Targeting Overview James Hylen Targetting
Presentations
30 Sep 2008
23-v1 Main Injector Overview Valeri A Lebedev Main Injector
Presentations
30 Sep 2008
22-v1 Recycler Overview Alexander A Valishev Recycler
Presentations
30 Sep 2008
20-v1 Low Energy Linac Overview Bob Webber Presentations
LE Linac
30 Sep 2008
19-v1 Project X Overview Dave McGinnis Presentations
30 Sep 2008
18-v1 Introductory Remarks Steve Holmes Presentations
30 Sep 2008

Number of documents found: 378

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 4 wallclock secs ( 0.84 usr + 0.22 sys = 1.06 CPU)