Project X


Document List by Topic


Project X DocDB Home

These documents on Reports are available:

Project X-doc-# Title Author(s) Topic(s) Last Updated
1370-v3 The PIP-II Reference Design Rep Valeri A Lebedev Linac
Reports
Main Injector
21 May 2015
1365-v1 Summary for SLHiPP-5 Valeri A Lebedev Presentations
Linac
Reports
15 Apr 2015
1336-v1 PXIE LEBT Commissioning Update Lionel R Prost Reports
LE Linac
12 Nov 2014
1324-v1 Acceptance of PXIE RFQ Gennady Romanov Reports
Front End
01 Oct 2014
1317-v1 STATUS OF THE WARM FRONT END OF PXIE Matthew L Alvarez et al. Reports
25 Aug 2014
1284-v1 Bead-pull measurements of module #2 of the PXIE RFQ in April 2014 Timergali Khabiboulline Reports
LE Linac
25 Apr 2014
1277-v1 Beam size and emittance measurements in LEBT Richard D'Arcy et al. Reports
Front End
08 Apr 2014
1267-v1 Determination of Access controls for PXIE cave during RFQ RF powered operation Anthony F Leveling Presentations
Reports
LE Linac
04 Mar 2014
1262-v1 Booster High Power RF at PIP-II Era John S Reid Reports
18 Feb 2014
1259-v1 Design and Testing of a Prototype Beam Absorber for the PXIE MEBT Curtis Baffes et al. Reports
LE Linac
06 Feb 2014
1246-v1 Report of PXIE H- ion source commissioning at Fermilab (11/20/13-11/26/13) Bruce Hanna et al. Reports
Ion Source
Operations
16 Jan 2014
1241-v1 Summary of PXIE RFQ Progress at LBNL Curtis Baffes et al. Reports
CW Linac
07 Jan 2014
1240-v1 PXIE Ion Source Commissioning Status - Update Bruce Hanna et al. Presentations
Reports
Ion Source
07 Jan 2014
1232-v3 Proton Improvement Plan-II Paul Derwent et al. Reports
12 Dec 2013
1231-v1 Thoughts about PXIE MEBT in FY15 Alexander Shemyakin Reports
LE Linac
26 Nov 2013
1230-v1 Update on 50 Ohm Kicker Ding Sun Reports
19 Nov 2013
1227-v1 PXIE Ion Source and LEBT Installation Status Lionel R Prost Presentations
Reports
Front End
29 Oct 2013
1218-v1 Feasibility of a radiation-cooled scraper for PXIE MEBT Andrey Denisov et al. Reports
27 Aug 2013
1212-v1 PXIE Infrastructure Update_JL_8_20_13 Jerry Leibfritz Reports
Conventional Facilities
20 Aug 2013
1211-v1 Recent MEBT development Alexander Shemyakin Reports
20 Aug 2013
776-v7 Reference Design Report Russ Alber et al. Controls
Linac
Absorbers
Reports
Recycler
Transfer Line
Conventional Facilities
Instrumentation
Cryogenics
Main Injector
17 Jul 2013
1200-v6 Project X Broader Impacts volume of the Project X Book Stuart D Henderson et al. Experiments
Reports
17 Jul 2013
1199-v8 Project X Research Program volume of the Project X Book Andreas Kronfeld et al. Experiments
Reports
17 Jul 2013
1201-v1 Project X Referece Design Report volume of Project X book Steve Holmes Reports
10 Jun 2013
1192-v3 Status of MEBT development Alexander Shemyakin Reports
07 Jun 2013
1182-v4 PROJECT X INJECTOR EXPERIMENT: GOALS, PLAN, AND STATUS Steve Holmes et al. Reports
08 May 2013
1165-v1 Power test of a short 50 ohm kicker prototype Ding Sun et al. Presentations
Reports
20 Feb 2013
1152-v1 Are Accelerators Ready to Drive Subcritical Nuclear Reactors? Stuart D Henderson Reports
24 Jan 2013
1148-v5 PXIE Design Handbook Sergei Nagaitsev Linac
Reports
11 Jan 2013
1144-v1 PXIE MEBT Triplets, Doublets, and Dipole Correctors Vladimir Kashikhin Presentations
Linac
Reports
Simulations
Front End
21 Dec 2012
1107-v1 PXIE MEBTstatus and plans for FY2013 Alexander Shemyakin Presentations
Reports
Front End
16 Oct 2012
742-v1 Linac RF WG1 summaru Ralph J. Pasquinelli Linac
Reports
09 Sep 2010
230-v10 Project X ICD-2 Document Paul Derwent Reports
30 Aug 2010
83-v2 Initial Configuration Document v1.1 Russ Alber et al. Controls
Project Management
Absorbers
Reports
HE Linac
HINS
Space Charge Effects
Transfer Line
Conventional Facilities
Instabilities
Instrumentation
Cryogenics
H- Injection
LE Linac
Main Injector
16 Mar 2009
149-v2 RD&D Plan from ICD Russ Alber et al. Controls
Linac
Reports
HINS
Recycler
Transfer Line
Conventional Facilities
Instrumentation
Cryogenics
H- Injection
Main Injector
11 Mar 2009
148-v1 Linac WG Report Sergei Nagaitsev Linac
Reports
24 Feb 2009
134-v1 Transfer Line & Injection WG Report David E. Johnson et al. Reports
Transfer Line
24 Feb 2009
133-v1 SRF Report Giorgio Apolinari et al. Reports
SRF
24 Feb 2009
132-v1 Main Injector Working Group Report Ioanis Kourbanis et al. Reports
Main Injector
24 Feb 2009
130-v1 Cryo Working Group Summary Dana Arenius et al. Reports
Cryogenics
24 Feb 2009
131-v1 Instrumentation WG Report Willem Blokland et al. Reports
Instrumentation
24 Feb 2009
143-v1 Accelerator Issues of Project X 8/7/2007 Dave McGinnis Presentations
Linac
Reports
28 Jan 2009
17-v2 A Staged Approach to a High Intensity Proton Source Dave McGinnis Reports
15 Oct 2008
79-v1 Accelerator Issues of Project X Dave McGinnis Reports
Reviews
07 Oct 2008

Number of documents found: 44

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.27 usr + 0.05 sys = 0.32 CPU)