Project X


Document List by Topic


Project X DocDB Home

These documents on Instrumentation are available:
(List events on Instrumentation)

Project X-doc-# Title Author(s) Topic(s) Last Updated
1344-v0 PXIE LEBT and MEBT Toroids for measurement of the beam loss in RFQ FRS Vic E Scarpine et al. Instrumentation
Instrumentation
Front End
05 Dec 2014
1173-v3 Project X and PXIE LEBT Scraper FRS Lionel R Prost Instrumentation
Front End
09 Apr 2013
1077-v0 PXIE LEBT Beam Transverse Emittance Station FRS Vic E Scarpine Instrumentation
03 Jul 2012
1382-v1 PXIE LEBT Chopper Driver Greg Saewert Instrumentation
02 Sep 2015
1380-v2 200 Ohm MEBT Chopper Development Progress Alex Z Chen et al. Instrumentation
Presentations
10 Jun 2015
1362-v1 PXIE Beam Instrumentation Update Vic E Scarpine Instrumentation
13 Apr 2015
1357-v1 CALCULATION OF THE EFFECT OF SLIT SIZE ON EMITTANCE MEASUREMENTS MADE BY A TWO-SLIT SCANNER Richard D'Arcy et al. Ion Source
Instrumentation
23 Mar 2015
1345-v6 Beam Optics Studies in MEBT for Beam Characterization at RFQ Commissioning stage Arun Saini et al. Instrumentation
19 Jan 2015
1316-v1 PXIE Laser Diagnostics Meeting - Aug 15,2014 Vic E Scarpine Instrumentation
15 Aug 2014
1271-v1 Beam Current Measurements for LEBT and Early MEBT Vic E Scarpine Instrumentation
18 Mar 2014
1217-v3 PXIE Instrumentation Update Vic E Scarpine Instrumentation
27 Aug 2013
776-v7 Reference Design Report Russ Alber et al. Controls
Absorbers
Reports
Instrumentation
Linac
Recycler
Transfer Line
Conventional Facilities
Cryogenics
Main Injector
17 Jul 2013
1043-v2 Specifications for PXIE MEBT BPMs Alexander Shemyakin Instrumentation
Front End
14 Mar 2013
1172-v1 Documents for PXIE BPM meeting on 12-Mar-2013 Alexander Shemyakin Instrumentation
Front End
14 Mar 2013
1137-v1 RF Modeling of the Helical Kicker for Project X Mohamed H A Hassan et al. Instrumentation
Presentations
13 Feb 2013
1136-v1 200 Ohm Chopper Update - Dec. 4, 2012 Greg Saewert Instrumentation
Presentations
04 Dec 2012
1099-v1 Microphonics Compensation Results in the SSR1 Cavity Yuriy Pischalnikov et al. Instrumentation
LLRF
07 Sep 2012
1081-v2 200 Ohm Chopper System Progress - July 2012 Greg Saewert Instrumentation
11 Jul 2012
1068-v1 PXIE Instrumentation Update - 12June2012 Vic E Scarpine Instrumentation
15 Jun 2012
1058-v1 A 500 V Fast Switch For ProjectX 200 Ohm Chopper Daniil Frolov et al. Instrumentation
24 May 2012
1056-v1 Project X chopper update (5/16/12) Tao Tang Other Labs
Instrumentation
Presentations
Linac
16 May 2012
1046-v1 BARC IIFC on Instrumentation - April 2012 Visit Summary Gopal Joshi et al. Other Labs
Instrumentation
Presentations
Collaboration
03 May 2012
1031-v1 PXIE Beam Diagnostics Manfred Wendt Instrumentation
Presentations
11 Apr 2012
1028-v3 200Ohm Chopper R&D Progress Greg Saewert Instrumentation
Presentations
Front End
10 Apr 2012
1023-v1 Bunch-by-Bunch Kicker and its Driver: 50  choice Ralph J. Pasquinelli et al. Absorbers
Instrumentation
Presentations
08 Apr 2012
1009-v1 Updates on Broadband Chopper Driver Development in SLAC (Mar. 2012) Tao Tang Other Labs
Instrumentation
Presentations
Linac
08 Mar 2012
1011-v1 EM analysis of a helical electrode for a broadband chopper Manfred Wendt Simulations
Instrumentation
Presentations
Linac
08 Mar 2012
984-v1 Beam Diagnostic Instrumentation for PXIE Vic E Scarpine Instrumentation
Presentations
17 Jan 2012
936-v2 200 Ohm Chopper Development Update: Helix Performance & Some Driver Ideas Greg Saewert Instrumentation
15 Dec 2011
929-v1 HINS Ion Source and RFQ Beam Measurements Vic E Scarpine Instrumentation
HINS
14 Sep 2011
872-v1 SNS/ProjectX Commissioning/Infrastructure Willem Blokland Controls
Operations
Instabilities
Instrumentation
Presentations
Linac
22 Apr 2011
871-v1 Beam Diagnostics: Requirements David E. Johnson et al. Instrumentation
Presentations
Linac
22 Apr 2011
870-v1 Beam Diagnostics & Beam Studies at HINS / MDB Vic E Scarpine Instrumentation
Presentations
Linac
HINS
22 Apr 2011
869-v1 Beam Loss Monitors operating at Cryogenic Temperature with FPGA- Based TDC Signal Processing Arden A. Warner et al. Instrumentation
Presentations
Linac
22 Apr 2011
868-v1 Propagation and noise experiments for a fiber-delivered laser wire John M Byrd et al. Instrumentation
Presentations
Linac
Collaboration
22 Apr 2011
866-v1 High Power Fast Faraday Cup R&D Craig Deibele et al. Instrumentation
Presentations
Linac
Collaboration
22 Apr 2011
865-v1 BPMs as Phase Monitors Craig Deibele Instrumentation
Presentations
Linac
Collaboration
22 Apr 2011
864-v1 Considerations for FET-based Broadband Chopper Modulator Craig Burkhart et al. Instrumentation
Presentations
Linac
Collaboration
22 Apr 2011
863-v1 Status of the Kicker R&D for a Broadband Chopper Greg Saewert et al. Instrumentation
Presentations
Linac
22 Apr 2011
748-v1 IIFC on Instrumentation and Controls TS Ananthakrishnan et al. Other Labs
Controls
Instrumentation
Presentations
Linac
24 Sep 2010
746-v1 Instrumentation & Controls Willem Blokland et al. Controls
Instrumentation
22 Sep 2010
705-v1 PX Instrumentation R&D at HINS Vic E Scarpine Instrumentation
HINS
08 Sep 2010
715-v2 ESS Opportunities Andreas Jansson Other Labs
Instrumentation
Presentations
08 Sep 2010
713-v3 Laser Diagnostics John M Byrd et al. Other Labs
Instrumentation
Presentations
08 Sep 2010
736-v1 Project X Instrumentation R&D at HINS Vic E Scarpine Instrumentation
08 Sep 2010
725-v2 FRIB Instrumentation Saeed Assadi Other Labs
Instrumentation
Presentations
07 Sep 2010
642-v1 Optimization of Wire Scanner position for HINS Energy Spread Measurement Eliana Gianfelice-Wendt Simulations
Instrumentation
LE Linac
Presentations
HINS
04 Aug 2010
626-v1 Intrumentation for HINS/Project-X at Meson Vic E Scarpine Instrumentation
HINS
23 Jun 2010
623-v1 Pearson Current Toroid Vacuum and Bake-out Test Results Bob Webber Instrumentation
LE Linac
HINS
15 Jun 2010
573-v1 Radiation Shielding Tests for Laser Power Supply David E. Johnson Instrumentation
18 Mar 2010
442-v1 A Multi-Stripline Chopper with individual MOSFET Drivers Manfred Wendt Instrumentation
Presentations
Linac
02 Mar 2010
426-v1 HINS Possibilities for Project X, January 2010 Bob Webber Instrumentation
Presentations
SRF
HINS
26 Jan 2010
408-v1 Results of First Wire Scans of HINS 2.5 MeV Beam Bob Webber Instrumentation
HINS
19 Jan 2010
295-v2 Summary Instrumentation & Controls Working Group Willem Blokland Controls
Instrumentation
Presentations
12 Sep 2009
264-v3 xTCA for Physics Standards - Progress & Applications Summary for Project X Collaboration Ray Larsen Controls
Instrumentation
Presentations
12 Sep 2009
291-v2 Longitudinal Laser Wire for Project X / HINS John M Byrd Instrumentation
Presentations
12 Sep 2009
279-v1 HINS as a Beam Diagnostics Test Facility Vic E Scarpine Instrumentation
Presentations
11 Sep 2009
262-v1 Fermi Timing Systems and Project X Gregory L. Vogel Controls
Instrumentation
Presentations
10 Sep 2009
266-v1 Bunch Shape Monitor for HINS Wai-Ming Tam Instrumentation
Presentations
10 Sep 2009
268-v1 E-Beam Scanner R&D Randy M Thurman-Keup Instrumentation
Presentations
10 Sep 2009
265-v1 Experience on SNS Beam Instrumentation Collaborations Willem Blokland Controls
Instrumentation
Presentations
10 Sep 2009
263-v1 Collaboration Opportunities on Project X Beam Instrumentation Manfred Wendt Instrumentation
Presentations
10 Sep 2009
256-v1 Status of Microwave Measurements in the Main Injector Nathan Eddy Instrumentation
Main Injector
10 Sep 2009
215-v2 Alternative Design Concept for Project-X 8 GeV complex Valeri A Lebedev et al. Basis of Estimate
Instabilities
Instrumentation
07 Jun 2009
197-v3 Instrumentation Overview - Director's Cost Review Manfred Wendt Directors Reviews
Basis of Estimate
Instrumentation
30 Mar 2009
198-v2 Beam Instrumentation Systems - Director's Cost Review Manfred Wendt Directors Reviews
Basis of Estimate
Instrumentation
30 Mar 2009
162-v1 Item 1.5 - BoE for CD-0 Director's Cost Review Manfred Wendt Directors Reviews
Basis of Estimate
Instrumentation
04 Mar 2009
83-v2 Initial Configuration Document v1.1 Russ Alber et al. Controls
Absorbers
Reports
HE Linac
Instabilities
Instrumentation
LE Linac
Project Management
HINS
Space Charge Effects
Transfer Line
Conventional Facilities
Cryogenics
H- Injection
Main Injector
16 Mar 2009
178-v1 Project X: Initial Configuration Paul Derwent Controls
Directors Reviews
Instrumentation
Presentations
Linac
HINS
Recycler
Transfer Line
Conventional Facilities
Cryogenics
Main Injector
13 Mar 2009
149-v2 RD&D Plan from ICD Russ Alber et al. Controls
Reports
Instrumentation
Linac
HINS
Recycler
Transfer Line
Conventional Facilities
Cryogenics
H- Injection
Main Injector
11 Mar 2009
131-v1 Instrumentation WG Report Willem Blokland et al. Reports
Instrumentation
24 Feb 2009
109-v1 Presentation of possible Project X Beam Instrumentation R&D projects Vic E Scarpine et al. Instrumentation
Presentations
24 Feb 2009
500-v1 Microwave Electron Cloud Measurements in the Main Injector James L. Crisp et al. Instrumentation
13 Jan 2009
497-v1 Measurements of Electron Cloud Density by Microwave Transmission Manfred Wendt Instabilities
Instrumentation
Main Injector
08 Dec 2008
97-v1 A Personal View of Beam Instrumentation Collaborations Manfred Wendt Instrumentation
Presentations
02 Dec 2008
95-v2 Overview of SNS Beam Instrumentation (Incl. Collaboration Aspects) Willem Blokland Instrumentation
Presentations
02 Dec 2008
96-v1 HINS Beam Instrumentation R&D Vic E Scarpine Instrumentation
Presentations
02 Dec 2008
45-v1 Linac Instrumentation Nathan Eddy Instrumentation
Presentations
Linac
01 Oct 2008
38-v1 Brookhaven Collaboration Report - Instrumentation Roger Connolly Other Labs
Instrumentation
LE Linac
Presentations
01 Oct 2008
467-v1 HINS Presentation to AD Instrumentation Department 2/20/2008 Bob Webber Instrumentation
HINS
20 Feb 2008
466-v1 Generic VME Digitizer , 12 Channel, 16bit, 10 MHz, by the AD Instrumentation Dep Tom Meyer et al. Hardware
Instrumentation
08 Feb 2008
459-v1 Project X Controls High Level Application Requirements Suzanne Gysin et al. Controls
Instrumentation
10 Jan 2008

Number of documents found: 82

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.26 usr + 0.06 sys = 0.32 CPU)