Project X


Document List by Topic


Project X DocDB Home

These documents on High Intensity Neutrino Source are available:
(List events on High Intensity Neutrino Source)

Project X-doc-# Title Author(s) Topic(s) Last Updated
794-v1 325 MHz Spoke Cavity Prototype Cryomodule Functional Requirements Specification Bob Webber Linac
HINS
Front End
SRF Specifications
Cavities and Cryomodules
LE Linac
SRF
CW Linac
01 Dec 2010
787-v5 325 MHz Cavity Test Cryostat 2K Conversion Functional Requirements Specification Thomas H. Nicol Requirements and Specifications
Presentations
Linac
HINS
325 MHz
LE Linac
SRF
18 May 2011
929-v1 HINS Ion Source and RFQ Beam Measurements Vic E Scarpine Instrumentation
HINS
14 Sep 2011
828-v2 HINS six cavity test RF distribution block diagram Ralph J. Pasquinelli HINS
09 Sep 2011
778-v3 PX/HINS Six-Cavity Test Documents Bob Webber Linac
HINS
LE Linac
08 Sep 2011
579-v3 HINS Six-Cavity Test Gennady Romanov HINS
08 Sep 2011
492-v1 HINS Room Temperature Cavity Conditioning Robyn L. Madrak HINS
01 Sep 2011
918-v2 Thoughts on Radiation Shielding for PX Front-End Test Facility Bob Webber Ion Source
HINS
LE Linac
Test Facilities
Conventional Facilities
08 Aug 2011
901-v1 Six-Cavity Test Installation Plan - June 2011 Bob Webber HINS
16 Jun 2011
887-v1 First Beam Measurements from Longitudinal Bunch Shape Monitor at HINS Christoph Maag HINS
17 May 2011
883-v1 First Beam Data from Fast Faraday Cup at HINS Vic E Scarpine HINS
12 May 2011
882-v1 Mechanical Readiness for Six-Cavity Test Installation Alex Z Chen HINS
12 May 2011
881-v1 HINS 2.5 MeV Beam Optics and Emittance Measurements Bruce Hanna HINS
12 May 2011
875-v1 Test Results With a Prototype Helical Kicker Greg Saewert HE Linac
HINS
03 May 2011
873-v1 Test Results of 1st Prototype Chopper Kicker Ding Sun HINS
LE Linac
03 May 2011
870-v1 Beam Diagnostics & Beam Studies at HINS / MDB Vic E Scarpine Instrumentation
Presentations
Linac
HINS
22 Apr 2011
655-v22 HINS Linac Safety Assessment and Radiation Shielding Assessment Docs Peter Kasper et al. Linac
HINS
LE Linac
15 Apr 2011
810-v1 HINS H- ion source test stand at pre-acc R&D lab Daniel S Bollinger et al. Experiments
HINS
07 Apr 2011
821-v1 SSR1-01 Pulsed tests Robyn L. Madrak et al. HINS
SRF
10 Feb 2011
819-v1 SSR1-01 Pulsed Tests Robert L Wagner HINS
325 MHz
SRF
10 Feb 2011
822-v1 Brief Summary of SSR1 LFD Compensation Yuriy Pischalnikov et al. Linac
HINS
LE Linac
SRF
10 Feb 2011
823-v1 Solenoid Lenses for SSR Cryomodules Iouri Terechkine Presentations
Linac
HINS
SRF
10 Feb 2011
798-v1 Possible Configurations for Prototypes of PX Cryomodules: SSR0 and SSR1 Iouri Terechkine Presentations
Linac
HINS
LE Linac
SRF
10 Dec 2010
795-v1 Status and plans for SSR0 and SSR1 Cavities Bob Webber HINS
SRF Specifications
LE Linac
SRF
01 Dec 2010
783-v1 325 MHz Spoke Cavity Status and FY11 Plans Bob Webber Presentations
Linac
HINS
LE Linac
SRF
04 Nov 2010
782-v1 325 MHz Spoke Cavity Prototype Cryomodule Bob Webber Linac
HINS
SRF Specifications
LE Linac
SRF
03 Nov 2010
773-v1 Front-end R&D Plans - SSR Prototype and Chopper Section Bob Webber Presentations
Linac
HINS
LE Linac
01 Nov 2010
770-v1 SSR1 Cryomodule Status Thomas H. Nicol Presentations
Linac
HINS
LE Linac
SRF
01 Nov 2010
767-v1 MEBT Chopper Beam Dump Nikolai Mokhov Presentations
Linac
HINS
LE Linac
27 Oct 2010
766-v1 Current Leads for Superconducting Solenoids Valeri Poloubotko Linac
HINS
LE Linac
SRF
25 Oct 2010
542-v2 HINS R&D Activities at Meson Detector Building Jim Steimel et al. HINS
22 Oct 2010
764-v1 MDB Beam Test Facility Plan Bob Webber Ion Source
Linac
HINS
LE Linac
21 Oct 2010
538-v3 Estimate of X-Ray Shielding and Radiation Monitoring for Safe Operation of the HINS Cavity Test Cave in the Meson Detector Building Jim Steimel et al. HINS
12 Oct 2010
755-v1 HINS Test Cryostat 2 K Conversion Status Thomas H. Nicol HINS
Cryogenics
SRF
07 Oct 2010
616-v1 Chopper in HINS (RFQ+matcher+Chopper) Nikolay A. Solyak HINS
Simulations
SRF
04 Oct 2010
752-v1 Proposal for Chopper Testing at HINS Facility Nikolay A. Solyak HINS
Simulations
Proton Driver
04 Oct 2010
437-v1 Minutes - HINS Cryo, Test Cave, SSR Robyn L. Madrak HINS
29 Sep 2010
666-v2 325 MHz Cavity Tests Timergali Khabiboulline et al. HINS
SRF
09 Sep 2010
705-v1 PX Instrumentation R&D at HINS Vic E Scarpine Instrumentation
HINS
08 Sep 2010
702-v2 Beam Optics at HINS Eliana Gianfelice-Wendt HINS
Simulations
08 Sep 2010
704-v1 MOSFET Chopper Tao Tang Presentations
Linac
HINS
Other Labs
07 Sep 2010
703-v1 Other Chopper Ideas Greg Saewert Linac
HINS
07 Sep 2010
728-v1 Experiences with the Fermilab HINS 325 MHz RFQ Timergali Khabiboulline et al. Linac
HINS
LE Linac
07 Sep 2010
724-v1 FIRST HIGH GRADIENT TEST RESULTS OF A DRESSED 325 MHZ SUPERCONDUCTING SINGLE SPOKE RESONATOR AT FERMILAB Timergali Khabiboulline et al. Linac
HINS
LE Linac
SRF
07 Sep 2010
657-v1 Third Report on SSR1-01 RF Results in MDB Cryostat and Power Coupler Qext Calculations Timergali Khabiboulline Presentations
Linac
HINS
LE Linac
SRF
27 Aug 2010
519-v1 HINS MDB Ion Source Safety Documents Roger Dixon et al. HINS
24 Aug 2010
654-v2 HINS Report for DOE Site Visit - B&R Code KA15-02-011_August_23_2010 Bob Webber Presentations
Linac
HINS
LE Linac
SRF
23 Aug 2010
653-v1 Second Report on SSR1 Tuner Results in MDB Cryostat Yuriy Pischalnikov Linac
HINS
LE Linac
SRF
22 Aug 2010
652-v1 Second Report on SSR0-1 RF Results in MDB Cryostat Timergali Khabiboulline Linac
HINS
LE Linac
SRF
22 Aug 2010
650-v1 SSR1 cold test - FAST/SLOW TUNER - first data Yuriy Pischalnikov Presentations
Linac
HINS
LE Linac
SRF
20 Aug 2010
649-v1 SSR1-01 First Cooldown and RF Results in MDB Test Cryostat Timergali Khabiboulline Linac
HINS
LE Linac
20 Aug 2010
643-v1 RFQ input-output beam parameters Gennady Romanov HINS
05 Aug 2010
642-v1 Optimization of Wire Scanner position for HINS Energy Spread Measurement Eliana Gianfelice-Wendt Instrumentation
Presentations
HINS
Simulations
LE Linac
04 Aug 2010
633-v1 HINS Six-Cavity Test Presentation to PX Front-End Meeting Bob Webber Presentations
HINS
LE Linac
07 Jul 2010
631-v1 A Look at PX 2.5 MeV Chopper Beam Dump Thermal Issue Iouri Terechkine Absorbers
HINS
LE Linac
01 Jul 2010
626-v1 Intrumentation for HINS/Project-X at Meson Vic E Scarpine Instrumentation
HINS
23 Jun 2010
623-v1 Pearson Current Toroid Vacuum and Bake-out Test Results Bob Webber Instrumentation
HINS
LE Linac
15 Jun 2010
541-v3 HINS Test Facility at Meson System Overview of Hazards Elmie Peoples et al. HINS
02 Jun 2010
617-v1 PX_solyak_lattice_front-end_in_HINS_Cave Bob Webber Presentations
HINS
LE Linac
26 May 2010
615-v1 Chopper Lattice in TraceWin Nikolay A. Solyak HINS
SRF
20 May 2010
612-v1 Meson Detector Building Plans for Project X and SRF Bob Webber HINS
LE Linac
SRF
17 May 2010
611-v1 A Review of Low β Resonator Performance Gennady Romanov HINS
LE Linac
SRF
14 May 2010
610-v1 SC options for low energy part of Project X linac Gennady Romanov HINS
LE Linac
SRF
14 May 2010
609-v1 Single-spoke Cavity Cryomodule Integration and Fabrication Considerations Iouri Terechkine HINS
SRF
14 May 2010
608-v1 Proposal for HINS R&D program related to Project X Sergei Nagaitsev HINS
12 May 2010
600-v3 An Estimate of Orbit Correction for SSR0 section of the Project X Valeri A Lebedev Presentations
Linac
HINS
12 May 2010
607-v1 RT Options for the Low Energy Part of Project X Linac Gennady Romanov HINS
LE Linac
12 May 2010
598-v1 HINS Beam Absorber MARS15 Simulations (extended) Nikolai Mokhov Absorbers
Presentations
HINS
30 Apr 2010
593-v1 HINS H- Ion Source Status Bob Webber Ion Source
HINS
14 Apr 2010
586-v1 Possible Siting of HTS2 in Meson Detector Building Bob Webber HINS
02 Apr 2010
585-v1 HINS Front-end Beam Facility Status Bob Webber HINS
LE Linac
01 Apr 2010
457-v1 Project X MEBT/Chopper and 3-Cavity SSR0 in MDB Bob Webber HINS
LE Linac
01 Apr 2010
572-v1 SNS D-Plate beam Dump Documents Michael Plum HINS
31 Mar 2010
441-v2 Options for Locating 325MHz Cryomodule Test Stand at MDB Bob Webber Presentations
HINS
24 Feb 2010
439-v1 Wai-Ming Tam's Thesis and Final Reports Wai-Ming Tam HINS
18 Feb 2010
435-v1 HINS Initial RFQ Beam Studies Vic E Scarpine HINS
12 Feb 2010
430-v1 Design concepts for a pulsed multi-GeV H¯ LINAC Peter N Ostroumov Presentations
Linac
HINS
03 Feb 2010
428-v1 HINS R&D Program Goals Statement Bob Webber HINS
02 Feb 2010
426-v1 HINS Possibilities for Project X, January 2010 Bob Webber Instrumentation
Presentations
HINS
SRF
26 Jan 2010
409-v1 Initial Observations of Beam Transmission vs. RF Power for the HINS RFQ Jim Steimel et al. HINS
19 Jan 2010
408-v1 Results of First Wire Scans of HINS 2.5 MeV Beam Bob Webber Instrumentation
HINS
19 Jan 2010
549-v1 HINS Clock Events, Definitions, and Usage Bob Webber HINS
12 Jan 2010
577-v1 HINS PLC Documentation Dave McDowell et al. HINS
22 Dec 2009
520-v1 HINS 2.5 MeV Beam Operations and Commissioning Documents Jim Steimel et al. HINS
16 Dec 2009
578-v1 HINS RFQ Heating Estimates Bob Webber HINS
10 Dec 2009
518-v1 HINS Shielding/Dose Calculation with Shielding Cracks Nikolai Mokhov HINS
19 Nov 2009
510-v1 HINS 325 MHz Cavity Test Cave 3D Model David Peterson et al. HINS
18 Nov 2009
513-v1 HINS - LLRF Julien Branlard HINS
LLRF
23 Sep 2009
512-v1 HINS RoadMap August 2009 Bob Webber HINS
28 Aug 2009
508-v1 HINS 325 MHz Cavity Test Cave Documentation Rick Bossert et al. HINS
Controls
23 Jul 2009
509-v1 HINS LLRF Update Brian E Chase HINS
21 Jul 2009
580-v1 HINS MS6 East regulator Installation Maurice Ball HINS
09 Jul 2009
227-v1 HINS Status Report for June 19, 2009 Project X Meeting Bob Webber Presentations
HINS
19 Jun 2009
220-v1 CW linac structure and break points between different accelerating structures Nikolay A. Solyak Linac
HINS
12 Jun 2009
507-v1 HINS LCW System Flow Distribution Maurice Ball HINS
08 Jun 2009
474-v1 HINS RFQ_layout Elmie Peoples HINS
17 Apr 2009
83-v2 Initial Configuration Document v1.1 Russ Alber et al. Absorbers
Reports
HE Linac
Instrumentation
HINS
Cryogenics
Main Injector
Controls
Instabilities
LE Linac
Project Management
Space Charge Effects
Transfer Line
Conventional Facilities
H- Injection
16 Mar 2009
178-v1 Project X: Initial Configuration Paul Derwent Instrumentation
Presentations
Linac
HINS
Cryogenics
Main Injector
Controls
Directors Reviews
Recycler
Transfer Line
Conventional Facilities
13 Mar 2009
149-v2 RD&D Plan from ICD Russ Alber et al. Reports
Instrumentation
Linac
HINS
Cryogenics
Main Injector
Controls
Recycler
Transfer Line
Conventional Facilities
H- Injection
11 Mar 2009
582-v1 Analysis of RFQ Vacuum System for HINS Tests at MDB Henryk Piekarz HINS
18 Feb 2009
583-v1 Estimate of RF Cavity X-rays in the HINS Linac Enclosure and Shielding Required Bob Webber HINS
27 Jan 2009
563-v1 HINS Linac Baseline Design Documents Bob Webber HINS
30 Dec 2008
495-v1 HINS RF distribution test block diagram Ralph J. Pasquinelli HINS
19 Nov 2008
571-v1 Autosave at HINS Sharon L. Lackey HINS
21 Jul 2008
570-v1 Saving and Restoring Epics devices at HINS and HTS Sharon L. Lackey HINS
Controls
17 Jun 2008
479-v1 HINS with 8 ILC-units at 31.5 MV/m : Acceleration of H- (15 mA) and e- (1 nC) Jean-Paul Carneiro HINS
12 Jun 2008
569-v1 HINS Alarms Sharon L. Lackey HINS
Controls
07 Jun 2008
477-v1 HINS SULFUR HEXAFLUORIDE SYSTEM POLICIES AND PROCEDURES Robyn L. Madrak HINS
15 May 2008
475-v1 HINS Talk to AD Controls Dept - April 2008 Bob Webber HINS
Controls
29 Apr 2008
471-v1 H- Ion Source Spec for HINS and Considerations for Project X H- Ion Source Charles W. Schmidt et al. Ion Source
HINS
19 Mar 2008
467-v1 HINS Presentation to AD Instrumentation Department 2/20/2008 Bob Webber Instrumentation
HINS
20 Feb 2008
567-v1 Final Report on Design and Test of a 325 MHz Hybrid and Circulator for Fermilab Proton Driver Ding Sun HINS
Proton Driver
28 Dec 2007
561-v1 Testing 325 MHz Cavities in the ILC IB1 Vertical Test System Bob Webber HINS
14 Dec 2007
564-v1 Overview of HINS Operations and Radiation Shielding Considerations in MDB Bob Webber HINS
05 Nov 2007
562-v1 High Power Tests of Novel Fast Phase/Amplitude Modulators for HINS Robyn L. Madrak et al. HINS
01 Nov 2007
559-v1 A Fast Chopper for HINS Robyn L. Madrak HINS
01 Nov 2007
558-v1 High Power RF Distribution and Control in the HINS Alfred Moretti HINS
11 Oct 2007
557-v1 HINS with 8 ILC-units at 45 mA: jitter studies. Jean-Paul Carneiro HINS
12 Jul 2007
554-v1 HINS Test Facility RF Fanback Distribution Jim Steimel HINS
31 May 2007
553-v1 HINS with 8 ILC-units at 45 mA : misalignment and jitter studies. Jean-Paul Carneiro HINS
26 Apr 2007
550-v1 HINS with 8 ILC-units at 45 mA Jean-Paul Carneiro HINS
29 Mar 2007
547-v1 Isolation Verification of HINS Meson Power RF Distribution Components Jim Steimel HINS
21 Mar 2007
546-v1 HINS Presentation to AD Department Heads Bob Webber HINS
16 Mar 2007
535-v1 HINS/PD Meson Planning Meeting Minutes Jim Steimel et al. HINS
02 Mar 2007
544-v1 LCW Cooling Analysis Meson HINS-ILCTA Maurice Ball HINS
28 Feb 2007
545-v1 Meson HINS/ILCTA LCW System Block Diagram/ Schematic Maurice Ball HINS
28 Feb 2007
543-v1 TRACK, ASTRA, MAD, ELEGANT and HINS Jean-Paul Carneiro HINS
07 Feb 2007
540-v1 HINS Test Facility at Meson Non-Ionizing Radiation Safety System Jim Steimel HINS
12 Jan 2007
533-v1 HINS Program Overview for CD Controls Management Meeting Bob Webber HINS
Controls
09 Oct 2006
531-v1 Proposed Proton Driver/HINS Beam Operations at Meson Detector Building Bob Webber HINS
Proton Driver
15 Aug 2006

Number of documents found: 130

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.39 usr + 0.06 sys = 0.45 CPU)