Project X


Document List by Event


Project X DocDB Home

These documents from Nov. 12 Accelerator Workshop are available:

Project X-doc-# Title Author(s) Topic(s) Last Updated
21-v1 High Energy Linac Overview Sergei Nagaitsev Presentations
HE Linac
23 Apr 2009
143-v1 Accelerator Issues of Project X 8/7/2007 Dave McGinnis Reports
Presentations
Linac
28 Jan 2009
70-v1 120 GeV Target Summary – Workshop # 1 Mike Martens et al. Targetting
02 Oct 2008
69-v1 Summary--High Energy Linac Issues Chris Adolphsen HE Linac
02 Oct 2008
68-v1 Summary--Low Energy Linac Component and System Designs Peter N Ostroumov et al. LE Linac
02 Oct 2008
67-v1 Issues and Challenges of High Power Targets for Muon Colliders Kirk T McDonald Targetting
Presentations
01 Oct 2008
66-v1 Experimental Radiation Damage Assessment of High Power Accelerator Targets Nikolaos Simos Targetting
Presentations
01 Oct 2008
65-v1 Issues with Liquid vs. Solid Targets John C Sheppard Targetting
Presentations
01 Oct 2008
64-v1 IHEP 2 Megawatt Target Design James Hylen Targetting
Presentations
01 Oct 2008
63-v1 High Power Targets for Project X and Beyond Kirk T McDonald Targetting
Presentations
01 Oct 2008
62-v1 Activation and Remote Handling John C Sheppard Targetting
Presentations
01 Oct 2008
61-v1 Engineering Issues for the NuMI Beamline at 2 MW Patrick G Hurh Targetting
Presentations
01 Oct 2008
60-v1 Modeling of Ring Performance Robert D Ryne Recycler
Simulations
Presentations
Main Injector
01 Oct 2008
59-v1 Injection and Extraction David E. Johnson Recycler
Transfer Line
Presentations
Main Injector
01 Oct 2008
58-v1 Transverse Damper Phil Adamson Recycler
Presentations
Instabilities
Main Injector
01 Oct 2008
57-v1 RF System and Beam Loading Compensation John S Reid Recycler
Presentations
Main Injector
01 Oct 2008
56-v1 Transition Crossing Simulations Ioanis Kourbanis Simulations
Presentations
Main Injector
01 Oct 2008
55-v1 Gamma Transition Jump Weiren Chou et al. Presentations
Main Injector
01 Oct 2008
54-v1 Present MI Operation and Near Future Plans Ioanis Kourbanis Operations
Presentations
Main Injector
01 Oct 2008
53-v1 SNS Laser Stripping Development Aleksandrov V Aleksandrov H- Injection
Other Labs
Presentations
01 Oct 2008
52-v1 Transfer lines, H- stripping and injection Deepak Raparia H- Injection
Transfer Line
Presentations
01 Oct 2008
51-v1 Present RR operation Consolato Gattuso Recycler
Operations
Presentations
01 Oct 2008
50-v1 Beam Loss and Collimation Nikolai Mokhov Absorbers
Presentations
Main Injector
01 Oct 2008
49-v1 Electron Cloud, EP Instability and Requirements for Vacuum Miguel A Furman Recycler
Presentations
Instabilities
Main Injector
01 Oct 2008
48-v1 Theoretical Expectations for Instabilities Alexey V Burov Recycler
Presentations
Instabilities
Main Injector
01 Oct 2008
47-v1 Experimental Observations of Instabilities at Main Injector Ioanis Kourbanis Presentations
Instabilities
Main Injector
01 Oct 2008
46-v1 SNS Ring Beam Status Slava Danilov Other Labs
Main Injector
01 Oct 2008
45-v1 Linac Instrumentation Nathan Eddy Presentations
Linac
Instrumentation
01 Oct 2008
44-v1 Electron source at a 2-GeV location Philippe Piot Presentations
Linac
01 Oct 2008
43-v1 MSU Collaboration Report - Beta 0.8 Cavities Walter Hartung Other Labs
Presentations
Linac
01 Oct 2008
42-v1 Automated Linac Re-tuning John D Galambos Presentations
Linac
01 Oct 2008
41-v1 PrX Civil Construction and Layout Dixon Bogert Conventional Facilities
Presentations
Linac
01 Oct 2008
40-v1 Cryo Systems Needed for Project X Arkadiy Klebaner Cryogenics
Presentations
Linac
01 Oct 2008
39-v1 Berkeley Collaboration Report - Buncher Cavities and LLRF Alessandro Ratti Other Labs
LE Linac
Presentations
01 Oct 2008
38-v1 Brookhaven Collaboration Report - Instrumentation Roger Connolly Other Labs
LE Linac
Presentations
Instrumentation
01 Oct 2008
37-v1 Argonne Collaboration Report - Accelerator Physics and Spoke Cavities Donald F Geesaman Other Labs
LE Linac
Presentations
01 Oct 2008
36-v1 History of SNS Design and Decisions Robert L Kustom Other Labs
LE Linac
Presentations
01 Oct 2008
35-v1 LLRF Challenges Brian E Chase Presentations
HE Linac
01 Oct 2008
34-v1 RF Distribution for Project X Christopher Nantista Presentations
HE Linac
01 Oct 2008
33-v1 Project X and ILC: Differences and Similarities Chris Adolphsen Presentations
HE Linac
01 Oct 2008
31-v1 SC Spoke Cavity Design and Status Timergali Khabiboulline LE Linac
Presentations
01 Oct 2008
32-v1 Superconducting Solenoid Design Iouri Terechkine LE Linac
Presentations
01 Oct 2008
30-v1 Room Temperature Cavity Design Gennady Romanov LE Linac
Presentations
30 Sep 2008
29-v1 325 MHz RF Distribution Alfred Moretti LE Linac
Presentations
30 Sep 2008
28-v1 SNS Superconducting Linac operating experience and issues Isidoro E Campisi Other Labs
Presentations
Linac
30 Sep 2008
27-v1 What It Will Take to Produce 1 Cryomodule per Month Robert D Kephart Cryogenics
Presentations
30 Sep 2008
26-v1 Linac Simulation Results and Issues Jean-Paul Carneiro Simulations
Linac
30 Sep 2008
25-v1 Linac Beam Physics Design and Special Requirements of H- vs e Peter N Ostroumov H- Injection
Linac
30 Sep 2008
24-v1 120 GeV Targeting Overview James Hylen Targetting
Presentations
30 Sep 2008
23-v1 Main Injector Overview Valeri A Lebedev Presentations
Main Injector
30 Sep 2008
22-v1 Recycler Overview Alexander A Valishev Recycler
Presentations
30 Sep 2008
20-v1 Low Energy Linac Overview Bob Webber LE Linac
Presentations
30 Sep 2008
19-v1 Project X Overview Dave McGinnis Presentations
30 Sep 2008
18-v1 Introductory Remarks Steve Holmes Presentations
30 Sep 2008

Number of documents found: 54

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.8.9, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.20 usr + 0.04 sys = 0.24 CPU)