Project X


Document List by Event Group


Project X DocDB Home

These documents from Technical Meetings are available:

Project X-doc-# Title Event(s) Author(s) Last Updated
821-v1 SSR1-01 Pulsed tests TD-PX/HINS Meetings (10 Feb 2011)
Robyn L. Madrak et al. 10 Feb 2011
819-v1 SSR1-01 Pulsed Tests TD-PX/HINS Meetings (10 Feb 2011)
Robert L Wagner 10 Feb 2011
822-v1 Brief Summary of SSR1 LFD Compensation TD-PX/HINS Meetings (10 Feb 2011)
Yuriy Pischalnikov et al. 10 Feb 2011
823-v1 Solenoid Lenses for SSR Cryomodules TD-PX/HINS Meetings (10 Feb 2011)
Iouri Terechkine 10 Feb 2011
813-v1 SSR0 design update (27 Jan 2011)
Leonardo Ristori 27 Jan 2011
787-v5 325 MHz Cavity Test Cryostat 2K Conversion Functional Requirements Specification (11 Nov 2010)
Thomas H. Nicol 18 May 2011
784-v1 Project X retreat (Nov 2, 2010) summary (02 Nov 2010)
Sergei Nagaitsev 09 Nov 2010
777-v1 Physics Design of PrX linacs (02 Nov 2010)
Nikolay A. Solyak 04 Nov 2010
771-v1 Chopping and Limitations to MEBT; Injection to Recycler (02 Nov 2010)
Valeri A Lebedev 02 Nov 2010
780-v1 RF Issues with Configuration Options (02 Nov 2010)
Brian E Chase 02 Nov 2010
779-v3 Options for RF power couplers and HOMs (02 Nov 2010)
Vyacheslav P. Yakovlev 15 Dec 2010
773-v1 Front-end R&D Plans - SSR Prototype and Chopper Section (02 Nov 2010)
Bob Webber 01 Nov 2010
766-v1 Current Leads for Superconducting Solenoids TD-PX/HINS Meetings (21 Oct 2010)
Valeri Poloubotko 25 Oct 2010
759-v1 325MHz Cavity Processing Proposal for FY11 TD-PX/HINS Meetings (14 Oct 2010)
Allan M Rowe 14 Oct 2010
755-v1 HINS Test Cryostat 2 K Conversion Status (07 Oct 2010)
Thomas H. Nicol 07 Oct 2010
750-v1 Integration of the SSR cryomodules into the Project X cryo system and implications for the SSR1 prototype TD-PX/HINS Meetings (30 Sep 2010)
Thomas J. Peterson 30 Sep 2010
770-v1 SSR1 Cryomodule Status (02 Sep 2010)
Thomas H. Nicol 01 Nov 2010
657-v1 Third Report on SSR1-01 RF Results in MDB Cryostat and Power Coupler Qext Calculations TD-PX/HINS Meetings (26 Aug 2010)
Timergali Khabiboulline 27 Aug 2010
653-v1 Second Report on SSR1 Tuner Results in MDB Cryostat TD-PX/HINS Meetings (19 Aug 2010)
Yuriy Pischalnikov 22 Aug 2010
652-v1 Second Report on SSR0-1 RF Results in MDB Cryostat TD-PX/HINS Meetings (19 Aug 2010)
Timergali Khabiboulline 22 Aug 2010
650-v1 SSR1 cold test - FAST/SLOW TUNER - first data TD-PX/HINS Meetings (12 Aug 2010)
Yuriy Pischalnikov 20 Aug 2010
649-v1 SSR1-01 First Cooldown and RF Results in MDB Test Cryostat TD-PX/HINS Meetings (12 Aug 2010)
Timergali Khabiboulline 20 Aug 2010
809-v1 Design studies of 162.5 MHz RFQ PX Front-End Meetings (24 Feb 2010)
Sunny Lalitha sanyasirao Sista venugopal 20 Jan 2011
798-v1 Possible Configurations for Prototypes of PX Cryomodules: SSR0 and SSR1 PX Front-End Meetings (24 Feb 2010)
Iouri Terechkine 10 Dec 2010
795-v1 Status and plans for SSR0 and SSR1 Cavities PX Front-End Meetings (24 Feb 2010)
Bob Webber 01 Dec 2010
782-v1 325 MHz Spoke Cavity Prototype Cryomodule PX Front-End Meetings (24 Feb 2010)
Bob Webber 03 Nov 2010
768-v1 2.5 MeV Chopper Beam Absorber Thermal Considerations PX Front-End Meetings (24 Feb 2010)
Iouri Terechkine 27 Oct 2010
767-v1 MEBT Chopper Beam Dump PX Front-End Meetings (24 Feb 2010)
Nikolai Mokhov 27 Oct 2010
616-v1 Chopper in HINS (RFQ+matcher+Chopper) PX Front-End Meetings (24 Feb 2010)
Nikolay A. Solyak 04 Oct 2010
642-v1 Optimization of Wire Scanner position for HINS Energy Spread Measurement PX Front-End Meetings (24 Feb 2010)
Eliana Gianfelice-Wendt 04 Aug 2010
641-v1 CW re-buncher status PX Front-End Meetings (24 Feb 2010)
Gennady Romanov 30 Jul 2010
640-v1 Project X: Ion Source & LEBT R&D plan and Status Report PX Front-End Meetings (24 Feb 2010)
Qing Ji 30 Jul 2010
633-v1 HINS Six-Cavity Test Presentation to PX Front-End Meeting PX Front-End Meetings (24 Feb 2010)
Bob Webber 07 Jul 2010
631-v1 A Look at PX 2.5 MeV Chopper Beam Dump Thermal Issue PX Front-End Meetings (24 Feb 2010)
Iouri Terechkine 01 Jul 2010
626-v1 Intrumentation for HINS/Project-X at Meson PX Front-End Meetings (24 Feb 2010)
Vic E Scarpine 23 Jun 2010
617-v1 PX_solyak_lattice_front-end_in_HINS_Cave PX Front-End Meetings (24 Feb 2010)
Bob Webber 26 May 2010
615-v1 Chopper Lattice in TraceWin PX Front-End Meetings (24 Feb 2010)
Nikolay A. Solyak 20 May 2010
611-v1 A Review of Low β Resonator Performance PX Front-End Meetings (24 Feb 2010)
Gennady Romanov 14 May 2010
610-v1 SC options for low energy part of Project X linac PX Front-End Meetings (24 Feb 2010)
Gennady Romanov 14 May 2010
609-v1 Single-spoke Cavity Cryomodule Integration and Fabrication Considerations PX Front-End Meetings (24 Feb 2010)
Iouri Terechkine 14 May 2010
608-v1 Proposal for HINS R&D program related to Project X PX Front-End Meetings (24 Feb 2010)
Sergei Nagaitsev 12 May 2010
600-v3 An Estimate of Orbit Correction for SSR0 section of the Project X PX Front-End Meetings (24 Feb 2010)
Valeri A Lebedev 12 May 2010
607-v1 RT Options for the Low Energy Part of Project X Linac PX Front-End Meetings (24 Feb 2010)
Gennady Romanov 12 May 2010
593-v1 HINS H- Ion Source Status PX Front-End Meetings (24 Feb 2010)
Bob Webber 14 Apr 2010
585-v1 HINS Front-end Beam Facility Status PX Front-End Meetings (24 Feb 2010)
Bob Webber 01 Apr 2010
457-v1 Project X MEBT/Chopper and 3-Cavity SSR0 in MDB PX Front-End Meetings (24 Feb 2010)
Bob Webber 01 Apr 2010

Number of documents found: 46

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.23 usr + 0.04 sys = 0.27 CPU)