These documents from Reviews are available:

Project X-doc-# Title Event(s) Author(s) Last Updated
1376-v2 Warm Front End and PXIE Status (05 Jun 2015)
Alexander Shemyakin 08 Jun 2015
1156-v1 PXIE RFQ end-wall issues RF simulation studies of PIXIE RFQ (12 Apr 2012)
Gennady Romanov 05 Feb 2013
1131-v1 PXIE RFQ Installation & Commissioning Plan RF simulation studies of PIXIE RFQ (12 Apr 2012)
Vic E Scarpine et al. 29 Nov 2012
207-v1 Project X ICD Evolution and ACD CD-0 Cost Review (16 Mar 2009)
Sergei Nagaitsev 30 Mar 2009
206-v1 Vector Modulators Performance Spec, Status, R&D Plan CD-0 Cost Review (16 Mar 2009)
Giorgio Apolinari 30 Mar 2009
202-v1 RF Interlocks - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
Peter Prieto 16 Mar 2009
201-v1 Vector Modulators - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
Oleg Nezhevenko 16 Mar 2009
200-v1 325MHz & 1300MHz RF Systems - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
John S Reid 16 Mar 2009
199-v1 RF Systems Overview - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
John S Reid 16 Mar 2009
198-v2 Beam Instrumentation Systems - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
Manfred Wendt 30 Mar 2009
197-v3 Instrumentation Overview - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
Manfred Wendt 30 Mar 2009
196-v1 LE Linac - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
Giorgio Apolinari 15 Mar 2009
195-v3 Low Level RF - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
Brian E Chase 30 Mar 2009
194-v1 HE Linac Cryomodules - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
Jim Kerby 15 Mar 2009
193-v1 Modulators and Charging Power Supplies - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
Chris Jensen et al. 15 Mar 2009
190-v1 PX Dir Review 8 GeV Transport Line Components CD-0 Cost Review (16 Mar 2009)
David E. Johnson 15 Mar 2009
189-v1 PX Dir Review 8 GeV Injection Components CD-0 Cost Review (16 Mar 2009)
David E. Johnson 15 Mar 2009
191-v1 Project X Systems and Interfaces - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
Sergei Nagaitsev 15 Mar 2009
187-v1 Cost Estimate Methodology - CD-0 Cost Review CD-0 Cost Review (16 Mar 2009)
Jim Kerby 13 Mar 2009
181-v2 Project X Directors Review - Controls CD-0 Cost Review (16 Mar 2009)
Jim Patrick 16 Mar 2009
186-v1 Low Energy Linac Cost Estimate - CD-0 Cost Review CD-0 Cost Review (16 Mar 2009)
Thomas H. Nicol 13 Mar 2009
185-v1 Escalation Rates for CD-0 Cost Estimate CD-0 Cost Review (16 Mar 2009)
Jim Kerby 13 Mar 2009
184-v1 FY09 Burden Rates CD-0 Cost Review (16 Mar 2009)
Jim Kerby 13 Mar 2009
183-v1 Actions Authorized by CD-0 CD-0 Cost Review (16 Mar 2009)
Jim Kerby 13 Mar 2009
182-v1 PX Labor Categories CD-0 Cost Review (16 Mar 2009)
Jim Kerby 13 Mar 2009
169-v3 Civil - CD-0 Talk 031609 CD-0 Cost Review (16 Mar 2009)
Russ Alber 13 Mar 2009
172-v2 PX Director's review March 09 Cryo Presentation CD-0 Cost Review (16 Mar 2009)
Arkadiy Klebaner 13 Mar 2009
174-v1 Main Injector and Recycler RF CD-0 Cost Review (16 Mar 2009)
Joseph E Dey 13 Mar 2009
180-v1 PX_MI_RR_directors_review CD-0 Cost Review (16 Mar 2009)
Ioanis Kourbanis 13 Mar 2009
175-v2 PX Dir Review 8 GeV level 2 Overview CD-0 Cost Review (16 Mar 2009)
David E. Johnson 15 Mar 2009
178-v1 Project X: Initial Configuration CD-0 Cost Review (16 Mar 2009)
Paul Derwent 13 Mar 2009
176-v2 Introduction and Overview - Director's Cost Review CD-0 Cost Review (16 Mar 2009)
Steve Holmes 13 Mar 2009
79-v1 Accelerator Issues of Project X AAC Review (08 Aug 2007)
Dave McGinnis 07 Oct 2008
78-v1 120 GeV Targeting AAC Review (08 Aug 2007)
James Hylen 07 Oct 2008
77-v1 Recycler 8.9 GeV/c Extraction AAC Review (08 Aug 2007)
David E. Johnson 07 Oct 2008
76-v1 Project X Main Injector AAC Review (08 Aug 2007)
Valeri A Lebedev 07 Oct 2008
75-v1 Project-X Related Issues in Recycler AAC Review (08 Aug 2007)
Alexander A Valishev 07 Oct 2008
74-v1 Project X: 8 GeV Recycler Injection AAC Review (08 Aug 2007)
David E. Johnson 07 Oct 2008
73-v1 Project X Linac AAC Review (08 Aug 2007)
Giorgio Apolinari 07 Oct 2008
72-v1 Project X Overview AAC Review (08 Aug 2007)
Dave McGinnis 07 Oct 2008

Number of documents found: 40

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.22 usr + 0.04 sys = 0.26 CPU)