Project X-doc-# Title Event(s) Author(s) Last Updated
21-v1 High Energy Linac Overview Nov. 12 Accelerator Workshop (12 Nov 2007)
11/08 Collaboration Meeting (21 Nov 2008)
Sergei Nagaitsev 23 Apr 2009
143-v1 Accelerator Issues of Project X 8/7/2007 Nov. 12 Accelerator Workshop (12 Nov 2007)
Dave McGinnis 28 Jan 2009
70-v1 120 GeV Target Summary – Workshop # 1 Nov. 12 Accelerator Workshop (12 Nov 2007)
Mike Martens et al. 02 Oct 2008
69-v1 Summary--High Energy Linac Issues Nov. 12 Accelerator Workshop (12 Nov 2007)
Chris Adolphsen 02 Oct 2008
68-v1 Summary--Low Energy Linac Component and System Designs Nov. 12 Accelerator Workshop (12 Nov 2007)
Peter N Ostroumov et al. 02 Oct 2008
67-v1 Issues and Challenges of High Power Targets for Muon Colliders Nov. 12 Accelerator Workshop (12 Nov 2007)
Kirk T McDonald 01 Oct 2008
66-v1 Experimental Radiation Damage Assessment of High Power Accelerator Targets Nov. 12 Accelerator Workshop (12 Nov 2007)
Nikolaos Simos 01 Oct 2008
65-v1 Issues with Liquid vs. Solid Targets Nov. 12 Accelerator Workshop (12 Nov 2007)
John C Sheppard 01 Oct 2008
64-v1 IHEP 2 Megawatt Target Design Nov. 12 Accelerator Workshop (12 Nov 2007)
James Hylen 01 Oct 2008
63-v1 High Power Targets for Project X and Beyond Nov. 12 Accelerator Workshop (12 Nov 2007)
Kirk T McDonald 01 Oct 2008
62-v1 Activation and Remote Handling Nov. 12 Accelerator Workshop (12 Nov 2007)
John C Sheppard 01 Oct 2008
61-v1 Engineering Issues for the NuMI Beamline at 2 MW Nov. 12 Accelerator Workshop (12 Nov 2007)
Patrick G Hurh 01 Oct 2008
60-v1 Modeling of Ring Performance Nov. 12 Accelerator Workshop (12 Nov 2007)
Robert D Ryne 01 Oct 2008
59-v1 Injection and Extraction Nov. 12 Accelerator Workshop (12 Nov 2007)
David E. Johnson 01 Oct 2008
58-v1 Transverse Damper Nov. 12 Accelerator Workshop (12 Nov 2007)
Phil Adamson 01 Oct 2008
57-v1 RF System and Beam Loading Compensation Nov. 12 Accelerator Workshop (12 Nov 2007)
John S Reid 01 Oct 2008
56-v1 Transition Crossing Simulations Nov. 12 Accelerator Workshop (12 Nov 2007)
Ioanis Kourbanis 01 Oct 2008
55-v1 Gamma Transition Jump Nov. 12 Accelerator Workshop (12 Nov 2007)
Weiren Chou et al. 01 Oct 2008
54-v1 Present MI Operation and Near Future Plans Nov. 12 Accelerator Workshop (12 Nov 2007)
Ioanis Kourbanis 01 Oct 2008
53-v1 SNS Laser Stripping Development Nov. 12 Accelerator Workshop (12 Nov 2007)
Aleksandrov V Aleksandrov 01 Oct 2008
52-v1 Transfer lines, H- stripping and injection Nov. 12 Accelerator Workshop (12 Nov 2007)
Deepak Raparia 01 Oct 2008
51-v1 Present RR operation Nov. 12 Accelerator Workshop (12 Nov 2007)
Consolato Gattuso 01 Oct 2008
50-v1 Beam Loss and Collimation Nov. 12 Accelerator Workshop (12 Nov 2007)
Nikolai Mokhov 01 Oct 2008
49-v1 Electron Cloud, EP Instability and Requirements for Vacuum Nov. 12 Accelerator Workshop (12 Nov 2007)
Miguel A Furman 01 Oct 2008
48-v1 Theoretical Expectations for Instabilities Nov. 12 Accelerator Workshop (12 Nov 2007)
Alexey V Burov 01 Oct 2008
47-v1 Experimental Observations of Instabilities at Main Injector Nov. 12 Accelerator Workshop (12 Nov 2007)
Ioanis Kourbanis 01 Oct 2008
46-v1 SNS Ring Beam Status Nov. 12 Accelerator Workshop (12 Nov 2007)
Slava Danilov 01 Oct 2008
45-v1 Linac Instrumentation Nov. 12 Accelerator Workshop (12 Nov 2007)
Nathan Eddy 01 Oct 2008
44-v1 Electron source at a 2-GeV location Nov. 12 Accelerator Workshop (12 Nov 2007)
Philippe Piot 01 Oct 2008
43-v1 MSU Collaboration Report - Beta 0.8 Cavities Nov. 12 Accelerator Workshop (12 Nov 2007)
Walter Hartung 01 Oct 2008
42-v1 Automated Linac Re-tuning Nov. 12 Accelerator Workshop (12 Nov 2007)
John D Galambos 01 Oct 2008
41-v1 PrX Civil Construction and Layout Nov. 12 Accelerator Workshop (12 Nov 2007)
Dixon Bogert 01 Oct 2008
40-v1 Cryo Systems Needed for Project X Nov. 12 Accelerator Workshop (12 Nov 2007)
Arkadiy Klebaner 01 Oct 2008
39-v1 Berkeley Collaboration Report - Buncher Cavities and LLRF Nov. 12 Accelerator Workshop (12 Nov 2007)
Alessandro Ratti 01 Oct 2008
38-v1 Brookhaven Collaboration Report - Instrumentation Nov. 12 Accelerator Workshop (12 Nov 2007)
Roger Connolly 01 Oct 2008
37-v1 Argonne Collaboration Report - Accelerator Physics and Spoke Cavities Nov. 12 Accelerator Workshop (12 Nov 2007)
Donald F Geesaman 01 Oct 2008
36-v1 History of SNS Design and Decisions Nov. 12 Accelerator Workshop (12 Nov 2007)
Robert L Kustom 01 Oct 2008
35-v1 LLRF Challenges Nov. 12 Accelerator Workshop (12 Nov 2007)
Brian E Chase 01 Oct 2008
34-v1 RF Distribution for Project X Nov. 12 Accelerator Workshop (12 Nov 2007)
Christopher Nantista 01 Oct 2008
33-v1 Project X and ILC: Differences and Similarities Nov. 12 Accelerator Workshop (12 Nov 2007)
Chris Adolphsen 01 Oct 2008
31-v1 SC Spoke Cavity Design and Status Nov. 12 Accelerator Workshop (12 Nov 2007)
Timergali Khabiboulline 01 Oct 2008
32-v1 Superconducting Solenoid Design Nov. 12 Accelerator Workshop (12 Nov 2007)
Iouri Terechkine 01 Oct 2008
30-v1 Room Temperature Cavity Design Nov. 12 Accelerator Workshop (12 Nov 2007)
Gennady Romanov 30 Sep 2008
29-v1 325 MHz RF Distribution Nov. 12 Accelerator Workshop (12 Nov 2007)
Alfred Moretti 30 Sep 2008
28-v1 SNS Superconducting Linac operating experience and issues Nov. 12 Accelerator Workshop (12 Nov 2007)
Isidoro E Campisi 30 Sep 2008
27-v1 What It Will Take to Produce 1 Cryomodule per Month Nov. 12 Accelerator Workshop (12 Nov 2007)
Robert D Kephart 30 Sep 2008
26-v1 Linac Simulation Results and Issues Nov. 12 Accelerator Workshop (12 Nov 2007)
Jean-Paul Carneiro 30 Sep 2008
25-v1 Linac Beam Physics Design and Special Requirements of H- vs e Nov. 12 Accelerator Workshop (12 Nov 2007)
Peter N Ostroumov 30 Sep 2008
24-v1 120 GeV Targeting Overview Nov. 12 Accelerator Workshop (12 Nov 2007)
James Hylen 30 Sep 2008
23-v1 Main Injector Overview Nov. 12 Accelerator Workshop (12 Nov 2007)
Valeri A Lebedev 30 Sep 2008
22-v1 Recycler Overview Nov. 12 Accelerator Workshop (12 Nov 2007)
Alexander A Valishev 30 Sep 2008
20-v1 Low Energy Linac Overview Nov. 12 Accelerator Workshop (12 Nov 2007)
Bob Webber 30 Sep 2008
19-v1 Project X Overview Nov. 12 Accelerator Workshop (12 Nov 2007)
Dave McGinnis 30 Sep 2008
18-v1 Introductory Remarks Nov. 12 Accelerator Workshop (12 Nov 2007)
Steve Holmes 30 Sep 2008

Number of documents found: 54

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.32 usr + 0.06 sys = 0.38 CPU)