Project X-doc-# Title Author(s) Topic(s) Last Updated
1295-v1 POT vs Energy and cycle time for high power operation Paul Derwent et al. Unassigned
13 Jun 2014
1232-v3 Proton Improvement Plan-II Paul Derwent et al. Reports
12 Dec 2013
776-v7 Reference Design Report Russ Alber et al. Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
Cryogenics
Absorbers
Reports
Main Injector
17 Jul 2013
745-v1 Main Injector/Recycler Ioanis Kourbanis Recycler
Main Injector
09 Sep 2010
668-v1 Introduction Ioanis Kourbanis Main Injector
07 Sep 2010
293-v1 MI and RR Rings, Wworking Group Report Ioanis Kourbanis Recycler
Main Injector
12 Sep 2009
280-v1 MI/RR RIngs. Introduction/Update Ioanis Kourbanis Recycler
Main Injector
11 Sep 2009
226-v1 Project X ICD Siting Analysis Summary Presentation David E. Johnson et al. Conventional Facilities
19 Jun 2009
160-v0 Item 1.4.6 - BoE for CD-0 Director's Cost Review Ioanis Kourbanis Basis of Estimate
Directors Reviews
Main Injector
04 Mar 2009
83-v2 Initial Configuration Document v1.1 Russ Alber et al. Transfer Line
Controls
Conventional Facilities
Instabilities
HE Linac
Instrumentation
HINS
Cryogenics
H- Injection
Project Management
Absorbers
Space Charge Effects
Reports
LE Linac
Main Injector
16 Mar 2009
180-v1 PX_MI_RR_directors_review Ioanis Kourbanis Basis of Estimate
Directors Reviews
Main Injector
13 Mar 2009
149-v2 RD&D Plan from ICD Russ Alber et al. Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
HINS
Cryogenics
H- Injection
Reports
Main Injector
11 Mar 2009
132-v1 Main Injector Working Group Report Ioanis Kourbanis et al. Reports
Main Injector
24 Feb 2009
105-v1 Review of MI Issues Ioanis Kourbanis Presentations
Main Injector
24 Feb 2009
56-v1 Transition Crossing Simulations Ioanis Kourbanis Presentations
Simulations
Main Injector
01 Oct 2008
54-v1 Present MI Operation and Near Future Plans Ioanis Kourbanis Operations
Presentations
Main Injector
01 Oct 2008
47-v1 Experimental Observations of Instabilities at Main Injector Ioanis Kourbanis Presentations
Instabilities
Main Injector
01 Oct 2008

Number of documents found: 17

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.24 usr + 0.03 sys = 0.27 CPU)