Project X


Document List by Author


Project X DocDB Home

Bruce Hanna of Fermilab is listed as an author on the following documents:

Project X-doc-# Title Author(s) Topic(s) Last Updated
1372-v1 Space-Charge Compensation in the PXIE LEBT Jean-Paul Carneiro et al. Presentations
Linac
11 May 2015
965-v5 Proposal for names assignment of PXIE components Bruce Hanna et al. LE Linac
Requirements and Specifications
Front End
15 Dec 2014
1337-v1 Hydrogen Gas at PXIE Bruce Hanna Requirements and Specifications
Ion Source
13 Nov 2014
1338-v1 PXIE LEBT Radiation Assesment Bruce Hanna Ion Source
13 Nov 2014
1339-v1 Radiation Through a Lead Glass Window at PXIE Bruce Hanna Ion Source
13 Nov 2014
1255-v2 PXIE Solenoid LOTTO Bruce Hanna Test Facilities
LE Linac
13 Nov 2014
1320-v1 PXIE MEBT Absorber Prototype Tesing Update Curtis Baffes et al. LE Linac
22 Sep 2014
1317-v1 STATUS OF THE WARM FRONT END OF PXIE Matthew L Alvarez et al. Reports
25 Aug 2014
1277-v1 Beam size and emittance measurements in LEBT Richard D'Arcy et al. Reports
Front End
08 Apr 2014
1269-v1 Summary of the PXIE Ion Source characterization measurements (11/20/2013-01/14/2014) Bruce Hanna et al. Ion Source
10 Mar 2014
1263-v1 PXIE Ion Source & LEBT Commissioning Update Rich Andrews et al. Presentations
Ion Source
18 Feb 2014
1246-v1 Report of PXIE H- ion source commissioning at Fermilab (11/20/13-11/26/13) Bruce Hanna et al. Operations
Reports
Ion Source
16 Jan 2014
1240-v1 PXIE Ion Source Commissioning Status - Update Bruce Hanna et al. Reports
Presentations
Ion Source
07 Jan 2014
1114-v1 PXIE absorber test bench Alexander Shemyakin et al. LE Linac
06 Nov 2012
1098-v3 Proposal for a ‘Phase I’ PXIE LEBT Bruce Hanna et al. Experiments
Space Charge Effects
Presentations
02 Oct 2012
1082-v1 PIXIE LCW Requirements Bruce Hanna Conventional Facilities
Front End
12 Jul 2012
881-v1 HINS 2.5 MeV Beam Optics and Emittance Measurements Bruce Hanna HINS
12 May 2011

Number of documents found: 17

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.23 usr + 0.02 sys = 0.25 CPU)