Alexander Shemyakin of Fermilab is listed as an author on the following documents:

Project X-doc-# Title Author(s) Topic(s) Last Updated
1344-v0 PXIE LEBT and MEBT Toroids for measurement of the beam loss in RFQ FRS Vic E Scarpine et al. Instrumentation
Front End
Instrumentation
05 Dec 2014
1224-v1 Functional Requirement Specification (FRS) PXIE MEBT BPM at the initial stage Alexander Shemyakin Front End
09 Oct 2013
1163-v2 PXIE LEBT Chopper FRS Lionel R Prost et al. Absorbers
Front End
13 Feb 2013
1071-v1 FRS for Bunching cavity for PXIE MEBT draft 1.5 Timergali Khabiboulline et al. Requirements and Specifications
22 Jun 2012
1067-v1 Functional specifications for PXIE MEBT scrapers Alexander Shemyakin Front End
13 Jun 2012
977-v1 PXIE MEBT kicker specifications Valeri A Lebedev et al. LE Linac
Front End
20 Dec 2011
964-v1 Functional specifications for PXIE MEBT absorber Alexander Shemyakin LE Linac
Requirements and Specifications
Front End
19 Dec 2011
938-v3 Functional specifications for PXIE MEBT Valeri A Lebedev et al. Requirements and Specifications
Front End
25 Jun 2012
933-v5 PXIE MEBT quadrupoles specifications Alexander Shemyakin LE Linac
Requirements and Specifications
24 Sep 2012
1221-v3 Feasibility of a radiation-cooled scraper for PXIE MEBT Curtis Baffes et al. Absorbers
Front End
08 Dec 2015
1379-v1 PXIE 50 Ohm Fast Kicker: Measurement and Power Test Results of First Half Prototype Alex Z Chen et al. Presentations
18 Jun 2015
1376-v2 Warm Front End and PXIE Status Alexander Shemyakin LE Linac
08 Jun 2015
1372-v1 Space-Charge Compensation in the PXIE LEBT Jean-Paul Carneiro et al. Presentations
Linac
11 May 2015
1371-v3 IPAC-15 Summary for PIP-II Valeri A Lebedev et al. Linac
29 Apr 2015
1369-v1 Scheme for Low Energy Beam Transport with a non-neutralized section Lionel R Prost et al. Ion Source
23 Apr 2015
1357-v1 CALCULATION OF THE EFFECT OF SLIT SIZE ON EMITTANCE MEASUREMENTS MADE BY A TWO-SLIT SCANNER Richard D'Arcy et al. Ion Source
Instrumentation
23 Mar 2015
1350-v3 MEBT status Alexander Shemyakin LE Linac
20 Jan 2015
1345-v6 Beam Optics Studies in MEBT for Beam Characterization at RFQ Commissioning stage Arun Saini et al. Instrumentation
19 Jan 2015
965-v5 Proposal for names assignment of PXIE components Bruce Hanna et al. LE Linac
Requirements and Specifications
Front End
15 Dec 2014
1015-v3 Estimations of spherical aberrations for PXIE LEBT solenoids Sergei Nagaitsev et al. Simulations
LE Linac
10 Dec 2014
1328-v1 Possible configurations for RFQ beam characterization Alexander Shemyakin HE Linac
07 Oct 2014
1326-v1 Synoptic Displays for PXIE William L. Marsh et al. Console Applications
07 Oct 2014
1320-v1 PXIE MEBT Absorber Prototype Tesing Update Curtis Baffes et al. LE Linac
22 Sep 2014
1318-v1 HIGH POWER DENSITY TEST OF PXIE MEBT ABSORBER PROTOTYPE Curtis Baffes et al. Presentations
26 Aug 2014
1317-v1 STATUS OF THE WARM FRONT END OF PXIE Matthew L Alvarez et al. Reports
25 Aug 2014
1313-v1 Electron Stimulated Desorption in the PXIE Test Stand Alexander Shemyakin Absorbers
Front End
08 Aug 2014
1290-v1 Highlights of the trip to SNS on May 5-6, 2014 Alexander Shemyakin et al. Other Labs
Presentations
13 May 2014
1277-v1 Beam size and emittance measurements in LEBT Richard D'Arcy et al. Reports
Front End
08 Apr 2014
1270-v1 PXIE MEBT 200 Ohm Kicker Mechanical Design Alex Z Chen et al. Linac
18 Mar 2014
1259-v1 Design and Testing of a Prototype Beam Absorber for the PXIE MEBT Curtis Baffes et al. Reports
LE Linac
06 Feb 2014
1250-v2 Peculiarities of the emittance growth in LEBT Lionel R Prost et al. Space Charge Effects
Ion Source
21 Jan 2014
1251-v1 MEBT status update Alexander Shemyakin LE Linac
21 Jan 2014
1234-v1 Overview of Hazards - RFQ Systems Matt Hoff et al. Front End
02 Dec 2013
1231-v1 Thoughts about PXIE MEBT in FY15 Alexander Shemyakin Reports
LE Linac
26 Nov 2013
1220-v3 PXIE MEBT 200 Ohm kicker technical requirements specification (TRS) Alex Z Chen et al. Front End
31 Oct 2013
1226-v2 PXIE MEBT Absorber Prototype Status Update Curtis Baffes et al. Absorbers
LE Linac
15 Oct 2013
1219-v1 Considerations for the Design of the LEBT Chopper for PXIE Lionel R Prost et al. Absorbers
Front End
06 Sep 2013
1218-v1 Feasibility of a radiation-cooled scraper for PXIE MEBT Andrey Denisov et al. Reports
27 Aug 2013
1211-v1 Recent MEBT development Alexander Shemyakin Reports
20 Aug 2013
776-v7 Reference Design Report Russ Alber et al. Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
Cryogenics
Absorbers
Reports
Main Injector
17 Jul 2013
1208-v1 PROJECT X INJECTOR EXPERIMENT: GOALS, PLAN, AND STATUS Steve Holmes et al. Presentations
LE Linac
03 Jul 2013
1192-v3 Status of MEBT development Alexander Shemyakin Reports
07 Jun 2013
1182-v4 PROJECT X INJECTOR EXPERIMENT: GOALS, PLAN, AND STATUS Steve Holmes et al. Reports
08 May 2013
1043-v2 Specifications for PXIE MEBT BPMs Alexander Shemyakin Front End
Instrumentation
14 Mar 2013
1172-v1 Documents for PXIE BPM meeting on 12-Mar-2013 Alexander Shemyakin Front End
Instrumentation
14 Mar 2013
1161-v1 RFQ- MEBT interface information Alexander Shemyakin Front End
13 Feb 2013
1159-v1 Technical Requirement Specification PXIE MEBT and HEBT quadrupoles and dipole correctors Alexander Shemyakin et al. Front End
08 Feb 2013
1157-v1 Nominal PXIE MEBT bunch structure scenarios Alexander Shemyakin Requirements and Specifications
07 Feb 2013
1059-v3 Request for proposal for the PXIE LEBT solenoids (i.e. specs) Lionel R Prost et al. Front End
30 Jan 2013
1117-v3 PXIE MEBT status Alexander Shemyakin Front End
27 Nov 2012
1112-v5 PXIE MEBT Absorber Prototype Status Update Curtis Baffes et al. Absorbers
LE Linac
15 Nov 2012
1114-v1 PXIE absorber test bench Alexander Shemyakin et al. LE Linac
06 Nov 2012
1107-v1 PXIE MEBTstatus and plans for FY2013 Alexander Shemyakin Presentations
Front End
Reports
16 Oct 2012
1098-v3 Proposal for a ‘Phase I’ PXIE LEBT Bruce Hanna et al. Experiments
Presentations
Space Charge Effects
02 Oct 2012
1084-v1 Estimates of X-Ray production and dose rate for the Project X MEBT absorber test bench Lionel R Prost et al. Experiments
Absorbers
13 Jul 2012
1045-v1 PXIE MEBT 200 Ohm kicker structure technical specifications Alexander Shemyakin Front End
LE Linac
30 Apr 2012
1041-v1 Analysis of magnetic measurements of the solenoidal lens # PSSA003 Alexander Shemyakin LE Linac
25 Apr 2012
1027-v2 MEBT Absorber Status, Project X Collaboration Meeting Curtis Baffes et al. Absorbers
11 Apr 2012
1020-v2 PXIE MEBT concept Alexander Shemyakin Front End
09 Apr 2012
1000-v3 PXIE Medium Energy Beam Transport Alexander Shemyakin Reviews
LE Linac
05 Mar 2012
1001-v1 PXIE Review - Ion Source & LEBT Qing Ji et al. Presentations
Reviews
05 Mar 2012
991-v1 MEBT Absorber Design Status Update Curtis Baffes et al. Absorbers
14 Feb 2012
979-v1 PXIE MEBT Chopper Driver Specifications (“Unipolar scheme”) Greg Saewert et al. CW Linac
23 Dec 2011
934-v1 Specifications for PXIE MEBT BPMs Alexander Shemyakin Front End
LE Linac
Requirements and Specifications
19 Dec 2011
963-v1 Electron Beam Dynamics Simulations for the Proposed Test of the PXIE/Project X MEBT Absorber Lionel R Prost et al. Experiments
Presentations
Absorbers
Simulations
15 Nov 2011
962-v1 Requirements for PXIE MEBT absorber Alexander Shemyakin Front End
Absorbers
LE Linac
15 Nov 2011
939-v2 Medium Energy Beam Transport Design for PXIE Valeri A Lebedev et al. LE Linac
25 Oct 2011
935-v2 Requirements for the PXIE MEBT chopper Valeri A Lebedev et al. Front End
LE Linac
18 Oct 2011
902-v1 Deflecting efficiency of a kicker with plane or cylindrical electrodes Alexander Shemyakin et al. LE Linac
21 Jun 2011
842-v3 A parallel-plate capacitor as a model of a kicker Lionel R Prost et al. Unassigned
LE Linac
21 Jun 2011
862-v2 Simple estimations for a LEBT kicker Alexander Shemyakin Unassigned
22 Apr 2011

Number of documents found: 71

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.31 usr + 0.05 sys = 0.36 CPU)