Project X


Document List by Author


Project X DocDB Home

Lionel R Prost of Fermilab is listed as an author on the following documents:

Project X-doc-# Title Author(s) Topic(s) Last Updated
1173-v3 Project X and PXIE LEBT Scraper FRS Lionel R Prost Front End
Instrumentation
09 Apr 2013
1163-v2 PXIE LEBT Chopper FRS Lionel R Prost et al. Absorbers
Front End
13 Feb 2013
1160-v5 Project X & PXIE LEBT/RFQ Interface Functional Requirement Specification Lionel R Prost Front End
22 Mar 2013
968-v5 Project X and PXIE Ion Source Functional Requirement Specifications Qing Ji et al. Requirements and Specifications
Front End
22 Mar 2013
912-v7 Functional Requirement Specification - Project X and PXIE Low Energy Beam Transport Section Lionel R Prost Requirements and Specifications
Front End
22 Mar 2013
1372-v1 Space-Charge Compensation in the PXIE LEBT Jean-Paul Carneiro et al. Presentations
Linac
11 May 2015
1369-v1 Scheme for Low Energy Beam Transport with a non-neutralized section Lionel R Prost et al. Ion Source
23 Apr 2015
1358-v2 PXIE LEBT Commissioning Update Lionel R Prost LE Linac
Presentations
25 Mar 2015
1348-v1 PXIE LEBT Commissioning Update Lionel R Prost LE Linac
06 Jan 2015
965-v5 Proposal for names assignment of PXIE components Bruce Hanna et al. LE Linac
Requirements and Specifications
Front End
15 Dec 2014
1015-v3 Estimations of spherical aberrations for PXIE LEBT solenoids Sergei Nagaitsev et al. Simulations
LE Linac
10 Dec 2014
1336-v1 PXIE LEBT Commissioning Update Lionel R Prost Reports
LE Linac
12 Nov 2014
1325-v1 PXIE LEBT Commissioning Update Lionel R Prost LE Linac
Presentations
01 Oct 2014
1317-v1 STATUS OF THE WARM FRONT END OF PXIE Matthew L Alvarez et al. Reports
25 Aug 2014
1308-v1 PXIE LEBT Commissioning Status Lionel R Prost LE Linac
Presentations
29 Jul 2014
1292-v1 PXIE IS/LEBT Commissioning Update Lionel R Prost LE Linac
Presentations
Ion Source
15 May 2014
1252-v2 Analysis of Potential Radiation Hazards from the PXIE RFQ Lionel R Prost et al. Front End
14 May 2014
1223-v3 PXIE Low Energy Beam Transport Chopper - Mechanical Design Specifications Constraints Lionel R Prost Front End
16 Apr 2014
1277-v1 Beam size and emittance measurements in LEBT Richard D'Arcy et al. Reports
Front End
08 Apr 2014
1278-v1 PXIE LEBT Commissioning Status Lionel R Prost Presentations
08 Apr 2014
1269-v1 Summary of the PXIE Ion Source characterization measurements (11/20/2013-01/14/2014) Bruce Hanna et al. Ion Source
10 Mar 2014
1263-v1 PXIE Ion Source & LEBT Commissioning Update Rich Andrews et al. Presentations
Ion Source
18 Feb 2014
1250-v2 Peculiarities of the emittance growth in LEBT Lionel R Prost et al. Space Charge Effects
Ion Source
21 Jan 2014
1246-v1 Report of PXIE H- ion source commissioning at Fermilab (11/20/13-11/26/13) Bruce Hanna et al. Operations
Reports
Ion Source
16 Jan 2014
1240-v1 PXIE Ion Source Commissioning Status - Update Bruce Hanna et al. Reports
Presentations
Ion Source
07 Jan 2014
1229-v1 Estimates of X-Ray production and dose rates near the PXIE H- ion source at CMTF Lionel R Prost Unassigned
08 Nov 2013
1227-v1 PXIE Ion Source and LEBT Installation Status Lionel R Prost Reports
Presentations
Front End
29 Oct 2013
1219-v1 Considerations for the Design of the LEBT Chopper for PXIE Lionel R Prost et al. Absorbers
Front End
06 Sep 2013
1216-v1 PXIE IS & LEBT Installation Status Report Lionel R Prost Presentations
20 Aug 2013
776-v7 Reference Design Report Russ Alber et al. Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
Cryogenics
Absorbers
Reports
Main Injector
17 Jul 2013
1176-v0 Project X & PXIE LEBT Isolated Diaphragm Lionel R Prost Front End
20 Mar 2013
1059-v3 Request for proposal for the PXIE LEBT solenoids (i.e. specs) Lionel R Prost et al. Front End
30 Jan 2013
1126-v3 PXIE Collaboration Meeting - Ion Source & LEBT Lionel R Prost Presentations
27 Nov 2012
1114-v1 PXIE absorber test bench Alexander Shemyakin et al. LE Linac
06 Nov 2012
1104-v1 Ion Source Assembly Requirements Lionel R Prost Vacuum
Front End
Ion Source
05 Oct 2012
1098-v3 Proposal for a ‘Phase I’ PXIE LEBT Bruce Hanna et al. Experiments
Presentations
Space Charge Effects
02 Oct 2012
1084-v1 Estimates of X-Ray production and dose rate for the Project X MEBT absorber test bench Lionel R Prost et al. Experiments
Absorbers
13 Jul 2012
1078-v1 Ion Source and LEBT Statuses Lionel R Prost Presentations
Front End
LE Linac
Ion Source
03 Jul 2012
1027-v2 MEBT Absorber Status, Project X Collaboration Meeting Curtis Baffes et al. Absorbers
11 Apr 2012
1001-v1 PXIE Review - Ion Source & LEBT Qing Ji et al. Presentations
Reviews
05 Mar 2012
963-v1 Electron Beam Dynamics Simulations for the Proposed Test of the PXIE/Project X MEBT Absorber Lionel R Prost et al. Experiments
Presentations
Absorbers
Simulations
15 Nov 2011
954-v1 Magnet Design Report: Solenoid for PX LEBT Lionel R Prost Other Labs
01 Nov 2011
842-v3 A parallel-plate capacitor as a model of a kicker Lionel R Prost et al. Unassigned
LE Linac
21 Jun 2011
810-v1 HINS H- ion source test stand at pre-acc R&D lab Daniel S Bollinger et al. Experiments
HINS
07 Apr 2011

Number of documents found: 44

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.20 usr + 0.03 sys = 0.23 CPU)