Project X


Document List by Author


Project X DocDB Home

Bob Webber of Fermilab is listed as an author on the following documents:
(List events moderated by Bob Webber)

Project X-doc-# Title Author(s) Topic(s) Last Updated
794-v1 325 MHz Spoke Cavity Prototype Cryomodule Functional Requirements Specification Bob Webber SRF
Linac
Cavities and Cryomodules
Front End
HINS
CW Linac
LE Linac
SRF Specifications
01 Dec 2010
776-v7 Reference Design Report Russ Alber et al. Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
Cryogenics
Absorbers
Reports
Main Injector
17 Jul 2013
778-v3 PX/HINS Six-Cavity Test Documents Bob Webber Linac
HINS
LE Linac
08 Sep 2011
918-v2 Thoughts on Radiation Shielding for PX Front-End Test Facility Bob Webber Test Facilities
Conventional Facilities
HINS
LE Linac
Ion Source
08 Aug 2011
901-v1 Six-Cavity Test Installation Plan - June 2011 Bob Webber HINS
16 Jun 2011
655-v22 HINS Linac Safety Assessment and Radiation Shielding Assessment Docs Peter Kasper et al. Linac
HINS
LE Linac
15 Apr 2011
795-v1 Status and plans for SSR0 and SSR1 Cavities Bob Webber SRF
HINS
SRF Specifications
LE Linac
01 Dec 2010
783-v1 325 MHz Spoke Cavity Status and FY11 Plans Bob Webber SRF
Presentations
Linac
HINS
LE Linac
04 Nov 2010
782-v1 325 MHz Spoke Cavity Prototype Cryomodule Bob Webber SRF
Linac
HINS
SRF Specifications
LE Linac
03 Nov 2010
773-v1 Front-end R&D Plans - SSR Prototype and Chopper Section Bob Webber Presentations
Linac
HINS
LE Linac
01 Nov 2010
542-v2 HINS R&D Activities at Meson Detector Building Jim Steimel et al. HINS
22 Oct 2010
764-v1 MDB Beam Test Facility Plan Bob Webber Linac
HINS
LE Linac
Ion Source
21 Oct 2010
538-v3 Estimate of X-Ray Shielding and Radiation Monitoring for Safe Operation of the HINS Cavity Test Cave in the Meson Detector Building Jim Steimel et al. HINS
12 Oct 2010
744-v2 Linac Front End Woking Group Summary Bob Webber Linac
Collaboration
LE Linac
Ion Source
09 Sep 2010
666-v2 325 MHz Cavity Tests Timergali Khabiboulline et al. SRF
HINS
09 Sep 2010
728-v1 Experiences with the Fermilab HINS 325 MHz RFQ Timergali Khabiboulline et al. Linac
HINS
LE Linac
07 Sep 2010
724-v1 FIRST HIGH GRADIENT TEST RESULTS OF A DRESSED 325 MHZ SUPERCONDUCTING SINGLE SPOKE RESONATOR AT FERMILAB Timergali Khabiboulline et al. SRF
Linac
HINS
LE Linac
07 Sep 2010
654-v2 HINS Report for DOE Site Visit - B&R Code KA15-02-011_August_23_2010 Bob Webber SRF
Presentations
Linac
HINS
LE Linac
23 Aug 2010
633-v1 HINS Six-Cavity Test Presentation to PX Front-End Meeting Bob Webber Presentations
HINS
LE Linac
07 Jul 2010
623-v1 Pearson Current Toroid Vacuum and Bake-out Test Results Bob Webber Instrumentation
HINS
LE Linac
15 Jun 2010
617-v1 PX_solyak_lattice_front-end_in_HINS_Cave Bob Webber Presentations
HINS
LE Linac
26 May 2010
612-v1 Meson Detector Building Plans for Project X and SRF Bob Webber SRF
HINS
LE Linac
17 May 2010
593-v1 HINS H- Ion Source Status Bob Webber HINS
Ion Source
14 Apr 2010
586-v1 Possible Siting of HTS2 in Meson Detector Building Bob Webber HINS
02 Apr 2010
585-v1 HINS Front-end Beam Facility Status Bob Webber HINS
LE Linac
01 Apr 2010
457-v1 Project X MEBT/Chopper and 3-Cavity SSR0 in MDB Bob Webber HINS
LE Linac
01 Apr 2010
441-v2 Options for Locating 325MHz Cryomodule Test Stand at MDB Bob Webber Presentations
HINS
24 Feb 2010
428-v1 HINS R&D Program Goals Statement Bob Webber HINS
02 Feb 2010
426-v1 HINS Possibilities for Project X, January 2010 Bob Webber SRF
Presentations
Instrumentation
HINS
26 Jan 2010
408-v1 Results of First Wire Scans of HINS 2.5 MeV Beam Bob Webber Instrumentation
HINS
19 Jan 2010
549-v1 HINS Clock Events, Definitions, and Usage Bob Webber HINS
12 Jan 2010
520-v1 HINS 2.5 MeV Beam Operations and Commissioning Documents Jim Steimel et al. HINS
16 Dec 2009
578-v1 HINS RFQ Heating Estimates Bob Webber HINS
10 Dec 2009
270-v3 Linac Design - Chopper Ideas Bob Webber Presentations
Linac
11 Sep 2009
512-v1 HINS RoadMap August 2009 Bob Webber HINS
28 Aug 2009
508-v1 HINS 325 MHz Cavity Test Cave Documentation Rick Bossert et al. Controls
HINS
23 Jul 2009
227-v1 HINS Status Report for June 19, 2009 Project X Meeting Bob Webber Presentations
HINS
19 Jun 2009
154-v0 Item 1.2.1 to 1.2.7 - BoE for CD-0 Director's Cost Review Bob Webber Basis of Estimate
Directors Reviews
LE Linac
04 Mar 2009
83-v2 Initial Configuration Document v1.1 Russ Alber et al. Transfer Line
Controls
Conventional Facilities
Instabilities
HE Linac
Instrumentation
HINS
Cryogenics
H- Injection
Project Management
Absorbers
Space Charge Effects
Reports
LE Linac
Main Injector
16 Mar 2009
149-v2 RD&D Plan from ICD Russ Alber et al. Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
HINS
Cryogenics
H- Injection
Reports
Main Injector
11 Mar 2009
117-v1 Intro to PrX front end/Low Beta Cavities Bob Webber Presentations
LE Linac
24 Feb 2009
583-v1 Estimate of RF Cavity X-rays in the HINS Linac Enclosure and Shielding Required Bob Webber HINS
27 Jan 2009
563-v1 HINS Linac Baseline Design Documents Bob Webber HINS
30 Dec 2008
68-v1 Summary--Low Energy Linac Component and System Designs Peter N Ostroumov et al. LE Linac
02 Oct 2008
20-v1 Low Energy Linac Overview Bob Webber Presentations
LE Linac
30 Sep 2008
4-v1 Project X Linac Front-end Thoughts and Facts Bob Webber Linac
28 Aug 2008
475-v1 HINS Talk to AD Controls Dept - April 2008 Bob Webber Controls
HINS
29 Apr 2008
471-v1 H- Ion Source Spec for HINS and Considerations for Project X H- Ion Source Charles W. Schmidt et al. HINS
Ion Source
19 Mar 2008
467-v1 HINS Presentation to AD Instrumentation Department 2/20/2008 Bob Webber Instrumentation
HINS
20 Feb 2008
561-v1 Testing 325 MHz Cavities in the ILC IB1 Vertical Test System Bob Webber HINS
14 Dec 2007
564-v1 Overview of HINS Operations and Radiation Shielding Considerations in MDB Bob Webber HINS
05 Nov 2007
534-v1 High Intensity Proton Source Naming Convention Sharon L. Lackey et al. Controls
18 Apr 2007
552-v1 Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber Proton Driver
16 Apr 2007
546-v1 HINS Presentation to AD Department Heads Bob Webber HINS
16 Mar 2007
535-v1 HINS/PD Meson Planning Meeting Minutes Jim Steimel et al. HINS
02 Mar 2007
533-v1 HINS Program Overview for CD Controls Management Meeting Bob Webber Controls
HINS
09 Oct 2006
531-v1 Proposed Proton Driver/HINS Beam Operations at Meson Detector Building Bob Webber Proton Driver
HINS
15 Aug 2006

Number of documents found: 57

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.31 usr + 0.05 sys = 0.36 CPU)