658-v8 |
Project X Functional Requirements Specification, Draft version 4.12 |
Stuart D Henderson et al. |
Requirements and Specifications
|
17 Oct 2011 |
967-v1 |
Project X HWR Functional Specification |
Jim Kerby |
Requirements and Specifications
|
23 Aug 2013 |
776-v7 |
Reference Design Report |
Russ Alber et al. |
Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
Cryogenics
Absorbers
Reports
Main Injector
|
17 Jul 2013 |
830-v1 |
Project X Poster at InPAC 2011 |
Jim Kerby |
Presentations
Project Management
|
07 Mar 2011 |
829-v1 |
Project X Overview Talk at InPAC2011 |
Jim Kerby |
Presentations
Project Management
|
07 Mar 2011 |
740-v2 |
Linac Integration |
John D Galambos et al. |
Linac
|
13 Sep 2010 |
226-v1 |
Project X ICD Siting Analysis Summary Presentation |
David E. Johnson et al. |
Conventional Facilities
|
19 Jun 2009 |
153-v0 |
Item 1.1 - BoE for CD-0 Director's Cost Review |
Steve Holmes et al. |
Basis of Estimate
Directors Reviews
Project Management
|
04 Mar 2009 |
157-v1 |
Item 1.3.1 to 1.3.2 - BoE for CD-0 Director's Cost Review |
Mark Champion et al. |
Basis of Estimate
SRF
Directors Reviews
HE Linac
LE Linac
|
04 Mar 2009 |
194-v1 |
HE Linac Cryomodules - Director's Cost Review |
Jim Kerby |
Basis of Estimate
Directors Reviews
HE Linac
|
15 Mar 2009 |
187-v1 |
Cost Estimate Methodology - CD-0 Cost Review |
Jim Kerby |
Basis of Estimate
Directors Reviews
|
13 Mar 2009 |
185-v1 |
Escalation Rates for CD-0 Cost Estimate |
Jim Kerby |
Basis of Estimate
Directors Reviews
|
13 Mar 2009 |
184-v1 |
FY09 Burden Rates |
Jim Kerby |
Basis of Estimate
Directors Reviews
|
13 Mar 2009 |
183-v1 |
Actions Authorized by CD-0 |
Jim Kerby |
Basis of Estimate
Directors Reviews
|
13 Mar 2009 |
182-v1 |
PX Labor Categories |
Jim Kerby |
Basis of Estimate
Directors Reviews
|
13 Mar 2009 |
150-v3 |
Project X CD-0 Schedule |
Ken Domann et al. |
Directors Reviews
|
13 Mar 2009 |
149-v2 |
RD&D Plan from ICD |
Russ Alber et al. |
Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
HINS
Cryogenics
H- Injection
Reports
Main Injector
|
11 Mar 2009 |
151-v3 |
Resource Spreadsheets - CD-0 Schedule |
Jim Kerby |
Directors Reviews
|
11 Mar 2009 |