Project X


Document List by Author


Project X DocDB Home

Jim Kerby of Fermilab is listed as an author on the following documents:

Project X-doc-# Title Author(s) Topic(s) Last Updated
976-v9 Preliminary Layout of PXIE Curtis Baffes et al. CW Linac
Requirements and Specifications
14 Jun 2017
658-v8 Project X Functional Requirements Specification, Draft version 4.12 Stuart D Henderson et al. Requirements and Specifications
17 Oct 2011
967-v1 Project X HWR Functional Specification Jim Kerby Requirements and Specifications
23 Aug 2013
776-v7 Reference Design Report Russ Alber et al. Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
Cryogenics
Absorbers
Reports
Main Injector
17 Jul 2013
830-v1 Project X Poster at InPAC 2011 Jim Kerby Presentations
Project Management
07 Mar 2011
829-v1 Project X Overview Talk at InPAC2011 Jim Kerby Presentations
Project Management
07 Mar 2011
740-v2 Linac Integration John D Galambos et al. Linac
13 Sep 2010
226-v1 Project X ICD Siting Analysis Summary Presentation David E. Johnson et al. Conventional Facilities
19 Jun 2009
153-v0 Item 1.1 - BoE for CD-0 Director's Cost Review Steve Holmes et al. Basis of Estimate
Directors Reviews
Project Management
04 Mar 2009
157-v1 Item 1.3.1 to 1.3.2 - BoE for CD-0 Director's Cost Review Mark Champion et al. Basis of Estimate
SRF
Directors Reviews
HE Linac
LE Linac
04 Mar 2009
194-v1 HE Linac Cryomodules - Director's Cost Review Jim Kerby Basis of Estimate
Directors Reviews
HE Linac
15 Mar 2009
187-v1 Cost Estimate Methodology - CD-0 Cost Review Jim Kerby Basis of Estimate
Directors Reviews
13 Mar 2009
185-v1 Escalation Rates for CD-0 Cost Estimate Jim Kerby Basis of Estimate
Directors Reviews
13 Mar 2009
184-v1 FY09 Burden Rates Jim Kerby Basis of Estimate
Directors Reviews
13 Mar 2009
183-v1 Actions Authorized by CD-0 Jim Kerby Basis of Estimate
Directors Reviews
13 Mar 2009
182-v1 PX Labor Categories Jim Kerby Basis of Estimate
Directors Reviews
13 Mar 2009
150-v3 Project X CD-0 Schedule Ken Domann et al. Directors Reviews
13 Mar 2009
149-v2 RD&D Plan from ICD Russ Alber et al. Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
HINS
Cryogenics
H- Injection
Reports
Main Injector
11 Mar 2009
151-v3 Resource Spreadsheets - CD-0 Schedule Jim Kerby Directors Reviews
11 Mar 2009

Number of documents found: 19

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.23 usr + 0.04 sys = 0.27 CPU)