Project X


All Project X Documents


Project X DocDB Home

Project X-doc-# Title Author(s) Topic(s) Last Updated
1344-v0 PXIE LEBT and MEBT Toroids for measurement of the beam loss in RFQ FRS Vic E Scarpine et al. Instrumentation
Front End
Instrumentation
05 Dec 2014
1224-v1 Functional Requirement Specification (FRS) PXIE MEBT BPM at the initial stage Alexander Shemyakin Front End
09 Oct 2013
1173-v3 Project X and PXIE LEBT Scraper FRS Lionel R Prost Front End
Instrumentation
09 Apr 2013
1164-v3 650 MHz Beta=0.9 Cavity Functional Requirements Specification Timergali Khabiboulline 650 MHz
Requirements and Specifications
Cavities and Cryomodules
12 Mar 2013
1163-v2 PXIE LEBT Chopper FRS Lionel R Prost et al. Absorbers
Front End
13 Feb 2013
1160-v5 Project X & PXIE LEBT/RFQ Interface Functional Requirement Specification Lionel R Prost Front End
22 Mar 2013
1079-v2 325 MHz SSR1 Cavity Functional Requirements Specification (FRS) Leonardo Ristori SRF
325 MHz
SRF Specifications
Requirements and Specifications
09 Jul 2012
1077-v0 PXIE LEBT Beam Transverse Emittance Station FRS Vic E Scarpine Instrumentation
03 Jul 2012
1071-v1 FRS for Bunching cavity for PXIE MEBT draft 1.5 Timergali Khabiboulline et al. Requirements and Specifications
22 Jun 2012
1067-v1 Functional specifications for PXIE MEBT scrapers Alexander Shemyakin Front End
13 Jun 2012
980-v4 PXIE Functional Requirements Specification Sergei Nagaitsev Accelerator Physics & System Integration
03 Feb 2012
977-v1 PXIE MEBT kicker specifications Valeri A Lebedev et al. LE Linac
Front End
20 Dec 2011
968-v5 Project X and PXIE Ion Source Functional Requirement Specifications Qing Ji et al. Requirements and Specifications
Front End
22 Mar 2013
964-v1 Functional specifications for PXIE MEBT absorber Alexander Shemyakin LE Linac
Requirements and Specifications
Front End
19 Dec 2011
938-v3 Functional specifications for PXIE MEBT Valeri A Lebedev et al. Requirements and Specifications
Front End
25 Jun 2012
933-v5 PXIE MEBT quadrupoles specifications Alexander Shemyakin LE Linac
Requirements and Specifications
24 Sep 2012
931-v3 Preliminary HW and SSR1 Cryomodule Functional Requirements Specifications for PXIE Thomas H. Nicol 325 MHz
07 Oct 2011
912-v7 Functional Requirement Specification - Project X and PXIE Low Energy Beam Transport Section Lionel R Prost Requirements and Specifications
Front End
22 Mar 2013
894-v9 Project X RFQ: functional physics requirements Sergei Nagaitsev et al. Requirements and Specifications
Front End
11 Feb 2013
885-v4 650 MHz Beta=0.9 Cryomodule Functional Requirements Specification Thomas H. Nicol Cryogenics
650 MHz
Cavities and Cryomodules
Requirements and Specifications
HE Linac
20 Feb 2013
794-v1 325 MHz Spoke Cavity Prototype Cryomodule Functional Requirements Specification Bob Webber SRF
Linac
Cavities and Cryomodules
Front End
HINS
CW Linac
LE Linac
SRF Specifications
01 Dec 2010
787-v5 325 MHz Cavity Test Cryostat 2K Conversion Functional Requirements Specification Thomas H. Nicol SRF
Presentations
Linac
HINS
325 MHz
LE Linac
Requirements and Specifications
18 May 2011
658-v8 Project X Functional Requirements Specification, Draft version 4.12 Stuart D Henderson et al. Requirements and Specifications
17 Oct 2011
1221-v3 Feasibility of a radiation-cooled scraper for PXIE MEBT Curtis Baffes et al. Front End
Absorbers
08 Dec 2015
1382-v1 PXIE LEBT Chopper Driver Greg Saewert Instrumentation
02 Sep 2015
1379-v1 PXIE 50 Ohm Fast Kicker: Measurement and Power Test Results of First Half Prototype Alex Z Chen et al. Presentations
18 Jun 2015
1380-v2 200 Ohm MEBT Chopper Development Progress Alex Z Chen et al. Presentations
Instrumentation
10 Jun 2015
1376-v2 Warm Front End and PXIE Status Alexander Shemyakin LE Linac
08 Jun 2015
976-v8 Preliminary Layout of PXIE Curtis Baffes et al. CW Linac
Requirements and Specifications
02 Jun 2015
1375-v1 PXIE Operating Modes and Timing Events Jim Steimel Controls
Presentations
26 May 2015
1370-v3 The PIP-II Reference Design Rep Valeri A Lebedev Linac
Reports
Main Injector
21 May 2015
1373-v3 MEBT Vacuum Protection of SRF for PXIE and PIP-II Curtis Baffes et al. Linac
Front End
LE Linac
12 May 2015
1372-v1 Space-Charge Compensation in the PXIE LEBT Jean-Paul Carneiro et al. Presentations
Linac
11 May 2015
1371-v3 IPAC-15 Summary for PIP-II Valeri A Lebedev et al. Linac
29 Apr 2015
1369-v1 Scheme for Low Energy Beam Transport with a non-neutralized section Lionel R Prost et al. Ion Source
23 Apr 2015
1365-v1 Summary for SLHiPP-5 Valeri A Lebedev Presentations
Linac
Reports
15 Apr 2015
1362-v1 PXIE Beam Instrumentation Update Vic E Scarpine Instrumentation
13 Apr 2015
1361-v1 PXIE Controls Status Michael J Kucera et al. Controls
Presentations
07 Apr 2015
1360-v1 PXIE RFQ Thermal Control Overview Daniel Bowring 162.5 MHz
01 Apr 2015
1359-v1 PXIE LLR Update Brian E Chase Presentations
31 Mar 2015
1358-v2 PXIE LEBT Commissioning Update Lionel R Prost Presentations
LE Linac
25 Mar 2015
1357-v1 CALCULATION OF THE EFFECT OF SLIT SIZE ON EMITTANCE MEASUREMENTS MADE BY A TWO-SLIT SCANNER Richard D'Arcy et al. Instrumentation
Ion Source
23 Mar 2015
1355-v1 HTS Vibration Analsys Jeremiah Holzbauer et al. Presentations
11 Mar 2015
1354-v1 PXIE CAD and mechanical systems status update Curtis Baffes LE Linac
23 Feb 2015
1352-v1 Booster Longitudinal Impedance Valeri A Lebedev Presentations
Instabilities
RCS
10 Feb 2015
1350-v3 MEBT status Alexander Shemyakin LE Linac
20 Jan 2015
1345-v6 Beam Optics Studies in MEBT for Beam Characterization at RFQ Commissioning stage Arun Saini et al. Instrumentation
19 Jan 2015
1348-v1 PXIE LEBT Commissioning Update Lionel R Prost LE Linac
06 Jan 2015
1347-v1 Measurements of dielectric constant Sergey Kazakov Linac
19 Dec 2014
965-v5 Proposal for names assignment of PXIE components Bruce Hanna et al. Front End
LE Linac
Requirements and Specifications
15 Dec 2014
1015-v3 Estimations of spherical aberrations for PXIE LEBT solenoids Sergei Nagaitsev et al. Simulations
LE Linac
10 Dec 2014
1343-v1 Painting in the course of PIP-II injection to Booster Part II Valeri A Lebedev RCS
Simulations
02 Dec 2014
1341-v1 Summary of RFQ RF system number 1 performenace Ralph J. Pasquinelli 162.5 MHz
19 Nov 2014
1340-v1 Ion Source LOTO Procedure Dan Wolff Ion Source
13 Nov 2014
1337-v1 Hydrogen Gas at PXIE Bruce Hanna Requirements and Specifications
Ion Source
13 Nov 2014
1338-v1 PXIE LEBT Radiation Assesment Bruce Hanna Ion Source
13 Nov 2014
1339-v1 Radiation Through a Lead Glass Window at PXIE Bruce Hanna Ion Source
13 Nov 2014
1255-v2 PXIE Solenoid LOTTO Bruce Hanna Test Facilities
LE Linac
13 Nov 2014
1336-v1 PXIE LEBT Commissioning Update Lionel R Prost Reports
LE Linac
12 Nov 2014
1334-v1 PIPII RFQ circulator measurements Ralph J. Pasquinelli 162.5 MHz
30 Oct 2014
1333-v1 650 MHz coupler, couple of new ideas Sergey Kazakov SRF
29 Oct 2014
1331-v1 Painting in the course of PIP-II injection to Booster Valeri A Lebedev Presentations
RCS
21 Oct 2014
1330-v1 Status of PIP-II transfer line design Alessandro Vivoli Transfer Line
21 Oct 2014
1328-v1 Possible configurations for RFQ beam characterization Alexander Shemyakin HE Linac
07 Oct 2014
1327-v4 Controls for PXIE and PIP-II Jim Patrick Controls
Presentations
07 Oct 2014
1326-v1 Synoptic Displays for PXIE William L. Marsh et al. Console Applications
07 Oct 2014
1325-v1 PXIE LEBT Commissioning Update Lionel R Prost Presentations
LE Linac
01 Oct 2014
1324-v1 Acceptance of PXIE RFQ Gennady Romanov Front End
Reports
01 Oct 2014
1323-v1 BARC First Prototype PXIE Magnets - Measurements at Fermilab Michael A Tartaglia LE Linac
25 Sep 2014
1320-v1 PXIE MEBT Absorber Prototype Tesing Update Curtis Baffes et al. LE Linac
22 Sep 2014
1319-v1 Results of Hight Power Test of 325 MHz Couplers Sergey Kazakov SRF
Presentations
27 Aug 2014
1318-v1 HIGH POWER DENSITY TEST OF PXIE MEBT ABSORBER PROTOTYPE Curtis Baffes et al. Presentations
26 Aug 2014
1317-v1 STATUS OF THE WARM FRONT END OF PXIE Matthew L Alvarez et al. Reports
25 Aug 2014
1316-v1 PXIE Laser Diagnostics Meeting - Aug 15,2014 Vic E Scarpine Instrumentation
15 Aug 2014
1315-v1 PXIE LEBT Emittance Scanner Commissioning Richard D'Arcy Presentations
LE Linac
14 Aug 2014
1314-v1 Arguments for Standard Wiring Diagrams in PIP-II Design Donald Mitchell et al. Accelerator Physics & System Integration
12 Aug 2014
1313-v1 Electron Stimulated Desorption in the PXIE Test Stand Alexander Shemyakin Front End
Absorbers
08 Aug 2014
1312-v1 Proton Capabilities at Fermilab Steve Holmes Presentations
07 Aug 2014
1311-v1 Proton Improvement Plan-II Steve Holmes Presentations
07 Aug 2014
1310-v1 PIP-II Overview: Goals, Status, Strategy Steve Holmes Presentations
07 Aug 2014
1309-v1 MegaWatt Proton Beams for Particle Physics at Fermilab Steve Holmes Presentations
07 Aug 2014
1308-v1 PXIE LEBT Commissioning Status Lionel R Prost Presentations
LE Linac
29 Jul 2014
1307-v1 Intense Beams for Particle Physics Bob Tschirhart Presentations
17 Jul 2014
1306-v1 Operational Status and Power Upgrade Prospects of the Neutrino Experimental Facility at J-PARC TBD To Be Determined Other Labs
17 Jul 2014
1305-v1 Design Study on the 9-GeV Proton Linac at KEKB Tunnel for the Next Generation Neutrino Experiment TBD To Be Determined Other Labs
17 Jul 2014
1304-v1 Accelerator Concepts for the Beam Power of Multi MW with J-PARC MR TBD To Be Determined Other Labs
17 Jul 2014
1298-v1 Tasks for the PIP-II RDR Valeri A Lebedev Presentations
25 Jun 2014
1295-v1 POT vs Energy and cycle time for high power operation Paul Derwent et al. Unassigned
13 Jun 2014
1297-v1 Progress in “High Q” Program Alexander Romanenko et al. SRF
10 Jun 2014
1293-v1 Commissioning Plan for PXIE RFQ System - Amplifiers Ralph J. Pasquinelli et al. 162.5 MHz
Front End
15 May 2014
1292-v1 PXIE IS/LEBT Commissioning Update Lionel R Prost Presentations
LE Linac
Ion Source
15 May 2014
1252-v2 Analysis of Potential Radiation Hazards from the PXIE RFQ Lionel R Prost et al. Front End
14 May 2014
1291-v2 SNS Visit RFQ Jim Steimel Front End
Other Labs
14 May 2014
1290-v1 Highlights of the trip to SNS on May 5-6, 2014 Alexander Shemyakin et al. Other Labs
Presentations
13 May 2014
1289-v1 CMTF Cryogenics Arkadiy Klebaner Cryogenics
07 May 2014
1288-v1 Matched input beam in PXIE RFQ Gennady Romanov LE Linac
06 May 2014
1287-v1 162.5 MHz 7 kW CW power amp spec Ralph J. Pasquinelli 162.5 MHz
30 Apr 2014
1286-v1 SSR2 beta 0.47 and 0.51 comparison Paolo Berrutti et al. LE Linac
29 Apr 2014
1285-v1 SSR2 beta 0.47 and 0.51 comparison Vyacheslav P. Yakovlev LE Linac
29 Apr 2014
1284-v1 Bead-pull measurements of module #2 of the PXIE RFQ in April 2014 Timergali Khabiboulline Reports
LE Linac
25 Apr 2014
1283-v1 PXIE RFQ Status 4-22-2014 Curtis Baffes et al. 162.5 MHz
CW Linac
22 Apr 2014
1223-v3 PXIE Low Energy Beam Transport Chopper - Mechanical Design Specifications Constraints Lionel R Prost Front End
16 Apr 2014
1282-v1 LFD and Microphonics Suppression for PIP-II Warren Schappert SRF
16 Apr 2014
1281-v1 TECHNICAL SPECIFICATION FOR THE INTERFACES OF THE FNAL PROJECT-X HALF-WAVE RESONATOR CRYOMODULE Peter N Ostroumov LE Linac
11 Apr 2014
1279-v1 Status of Mechanical Design of LEBT_08APR14 Rich Andrews Presentations
09 Apr 2014
1277-v1 Beam size and emittance measurements in LEBT Richard D'Arcy et al. Front End
Reports
08 Apr 2014
1278-v1 PXIE LEBT Commissioning Status Lionel R Prost Presentations
08 Apr 2014
1276-v1 PXIE RFQ operation without frequency stabilization Gennady Romanov LE Linac
07 Apr 2014
1275-v1 SSR1-G3 Tuner Donato Passarelli SRF
02 Apr 2014
1274-v2 Preparation for the PIP-II RDR Valeri A Lebedev Presentations
LE Linac
Main Injector
01 Apr 2014
1273-v1 Engineering Document Management in Teamcenter Donald Mitchell Presentations
Project Management
25 Mar 2014
1270-v1 PXIE MEBT 200 Ohm Kicker Mechanical Design Alex Z Chen et al. Linac
18 Mar 2014
1271-v1 Beam Current Measurements for LEBT and Early MEBT Vic E Scarpine Instrumentation
18 Mar 2014
1269-v1 Summary of the PXIE Ion Source characterization measurements (11/20/2013-01/14/2014) Bruce Hanna et al. Ion Source
10 Mar 2014
1267-v1 Determination of Access controls for PXIE cave during RFQ RF powered operation Anthony F Leveling Presentations
Reports
LE Linac
04 Mar 2014
1265-v1 PXIE RFQ System - Amplifiers - Overview of Hazards Ralph J. Pasquinelli et al. 162.5 MHz
Front End
19 Feb 2014
1264-v1 PXIE RFQ System - Amplifiers Maximum Ratings Ralph J. Pasquinelli et al. 162.5 MHz
Front End
19 Feb 2014
1263-v1 PXIE Ion Source & LEBT Commissioning Update Rich Andrews et al. Presentations
Ion Source
18 Feb 2014
1262-v1 Booster High Power RF at PIP-II Era John S Reid Reports
18 Feb 2014
1261-v1 North American PAC 2013 Conference paper Greg Saewert Hardware
Presentations
13 Feb 2014
1260-v2 PIP-II and PXIE Valeri A Lebedev Presentations
HE Linac
LE Linac
12 Feb 2014
1259-v1 Design and Testing of a Prototype Beam Absorber for the PXIE MEBT Curtis Baffes et al. Reports
LE Linac
06 Feb 2014
1257-v1 Booster Injection in the Era of PIP-II: A preliminary assessment David E. Johnson Presentations
04 Feb 2014
1254-v1 PXIE RFQ System - Input Couplers Hazards and Maximum Ratings Sergey Kazakov et al. Front End
CW Linac
Requirements and Specifications
30 Jan 2014
1253-v1 PXIE Infrastructure Update_JL_1_28_14 Jerry Leibfritz Conventional Facilities
28 Jan 2014
1250-v2 Peculiarities of the emittance growth in LEBT Lionel R Prost et al. Space Charge Effects
Ion Source
21 Jan 2014
1251-v1 MEBT status update Alexander Shemyakin LE Linac
21 Jan 2014
1245-v1 PXIE LEBT Extraction Electrode Modulator Manual Greg Saewert Hardware
Instrumentation
17 Jan 2014
1246-v1 Report of PXIE H- ion source commissioning at Fermilab (11/20/13-11/26/13) Bruce Hanna et al. Operations
Reports
Ion Source
16 Jan 2014
1244-v1 Progress on RFQ couplers test stand Sergey Kazakov SRF
Presentations
14 Jan 2014
1243-v2 PXIE CAD Model: Status, Responsibilities and Plan Forward Curtis Baffes Conventional Facilities
Presentations
14 Jan 2014
1242-v1 PXIE RFQ Meeting Minutes from LBNL Visit Curtis Baffes et al. Front End
LE Linac
10 Jan 2014
1241-v1 Summary of PXIE RFQ Progress at LBNL Curtis Baffes et al. CW Linac
Reports
07 Jan 2014
1240-v1 PXIE Ion Source Commissioning Status - Update Bruce Hanna et al. Presentations
Reports
Ion Source
07 Jan 2014
1239-v1 Intensity Frontier materials for a general audience Bob Tschirhart Presentations
26 Dec 2013
1238-v1 CMTF Grounding Kermit Carlson Conventional Facilities
19 Dec 2013
1236-v1 Status of HWR Cryomodule Development Peter N Ostroumov SRF
Presentations
17 Dec 2013
1232-v3 Proton Improvement Plan-II Paul Derwent et al. Reports
12 Dec 2013
1235-v1 Maximum Ratings - RFQ Systems Andrew Lambert et al. Front End
02 Dec 2013
1234-v1 Overview of Hazards - RFQ Systems Matt Hoff et al. Front End
02 Dec 2013
1231-v1 Thoughts about PXIE MEBT in FY15 Alexander Shemyakin Reports
LE Linac
26 Nov 2013
1230-v1 Update on 50 Ohm Kicker Ding Sun Reports
19 Nov 2013
1229-v1 Estimates of X-Ray production and dose rates near the PXIE H- ion source at CMTF Lionel R Prost Unassigned
08 Nov 2013
1228-v1 PXIE RFQ Status Matt Hoff et al. Presentations
LE Linac
05 Nov 2013
1072-v18 Functional Requirements Specification (FRS) and Technical Requirements Specification (TRS) Index Marc Kaducak Requirements and Specifications
31 Oct 2013
1220-v3 PXIE MEBT 200 Ohm kicker technical requirements specification (TRS) Alex Z Chen et al. Front End
31 Oct 2013
1227-v1 PXIE Ion Source and LEBT Installation Status Lionel R Prost Presentations
Front End
Reports
29 Oct 2013
1226-v2 PXIE MEBT Absorber Prototype Status Update Curtis Baffes et al. Absorbers
LE Linac
15 Oct 2013
1222-v1 An 8 GeV Superconducting Linac Proton Driver G. W. Foster Proton Driver
16 Sep 2013
1219-v1 Considerations for the Design of the LEBT Chopper for PXIE Lionel R Prost et al. Front End
Absorbers
06 Sep 2013
1218-v1 Feasibility of a radiation-cooled scraper for PXIE MEBT Andrey Denisov et al. Reports
27 Aug 2013
1217-v3 PXIE Instrumentation Update Vic E Scarpine Instrumentation
27 Aug 2013
967-v1 Project X HWR Functional Specification Jim Kerby Requirements and Specifications
23 Aug 2013
1215-v1 PXIE Controls Jim Patrick Controls
Presentations
20 Aug 2013
1212-v1 PXIE Infrastructure Update_JL_8_20_13 Jerry Leibfritz Conventional Facilities
Reports
20 Aug 2013
1214-v1 PXIE Global Electrical Systems Status Jim Steimel Controls
20 Aug 2013
1216-v1 PXIE IS & LEBT Installation Status Report Lionel R Prost Presentations
20 Aug 2013
1213-v1 Project X RF update for PXIE Ralph J. Pasquinelli 162.5 MHz
20 Aug 2013
1211-v1 Recent MEBT development Alexander Shemyakin Reports
20 Aug 2013
1209-v2 Summary of Project X Research Program Book Bob Tschirhart Experiments
Presentations
25 Jul 2013
776-v7 Reference Design Report Russ Alber et al. Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
Cryogenics
Absorbers
Reports
Main Injector
17 Jul 2013
1200-v6 Project X Broader Impacts volume of the Project X Book Stuart D Henderson et al. Experiments
Reports
17 Jul 2013
1199-v8 Project X Research Program volume of the Project X Book Andreas Kronfeld et al. Experiments
Reports
17 Jul 2013
1208-v1 PROJECT X INJECTOR EXPERIMENT: GOALS, PLAN, AND STATUS Steve Holmes et al. Presentations
LE Linac
03 Jul 2013
1207-v1 Modifications of PXIE Shielding Cave Jerry Leibfritz Conventional Facilities
Presentations
24 Jun 2013
1206-v1 The Conceptual Design of the PXIE Beam Dump. Radiation Shielding and PXIE Complex Enclosure Nikolay A. Solyak Presentations
Absorbers
24 Jun 2013
1186-v5 Evaluation of Tritium Generation in the Soil under the PXIE Beam Dump (Problem of the Groundwater Activation) Yury I Eidelman Absorbers
24 Jun 2013
1205-v1 RF Sources for Project X Ralph J. Pasquinelli RF Sources
21 Jun 2013
1204-v1 Structural Analysis of Bunching Cavity Meiyu Chen et al. Simulations
LE Linac
14 Jun 2013
1202-v2 Project X Research Program presentation at the 2013 Fermilab Users Meeting Bob Tschirhart Experiments
Presentations
12 Jun 2013
1203-v1 Project X Accelerator Status: Goals, Status, and Strategy Steve Holmes Presentations
12 Jun 2013
1190-v1 Project X Colloquium at the University of Washington Bob Tschirhart Experiments
Presentations
11 Jun 2013
1201-v1 Project X Referece Design Report volume of Project X book Steve Holmes Reports
10 Jun 2013
1198-v1 Update on Project X in the Snowmass Process Bob Tschirhart Experiments
Presentations
10 Jun 2013
1192-v3 Status of MEBT development Alexander Shemyakin Reports
07 Jun 2013
1196-v1 650 MHz high beta dressed cavity development plan Timergali Khabiboulline et al. SRF
650 MHz
Presentations
Cavities and Cryomodules
HE Linac
CW Linac
06 Jun 2013
1197-v1 Fermilab Intensity Frontier Research Program Eric J. Prebys Experiments
Presentations
03 Jun 2013
1195-v1 Review of the US Intensity Frontier Research Program at the 'Snowmass on the Pacific Meeting' Bob Tschirhart Experiments
Presentations
03 Jun 2013
1194-v1 Future Fermilab Intensity Frontier Program at the Snowmass ISOUPS meeting Bob Tschirhart Experiments
Presentations
03 Jun 2013
1188-v1 CMTF Cryogenic System - status and plans Arkadiy Klebaner Cryogenics
23 May 2013
1189-v1 PXIE RFQ Input Coupler Preliminary Design Review Sergey Kazakov et al. Reviews
21 May 2013
1187-v1 Current Leads for Project X Cold Magnets Thomas J. Peterson Presentations
Cryogenics
14 May 2013
1182-v4 PROJECT X INJECTOR EXPERIMENT: GOALS, PLAN, AND STATUS Steve Holmes et al. Reports
08 May 2013
1185-v1 Review of CLFV Facilities Bob Tschirhart Presentations
07 May 2013
1179-v1 Alternative β=0.92 cavity for Project X Andrei Lunin et al. Proton Driver
HE Linac
03 May 2013
1183-v1 On PXIE RFQ tuning Ivan Gonin et al. LE Linac
03 May 2013
1184-v1 Summary of Project X at the Intensity Frontier All Hands Meeting, April 2013 Bob Tschirhart Experiments
03 May 2013
1180-v1 Review of DOE Office of Science Facilites Exercise Bob Tschirhart Experiments
Presentations
16 Apr 2013
1177-v1 Intensity Frontier overview to the March 2013 FRA Visting Committee Bob Tschirhart Presentations
29 Mar 2013
1176-v0 Project X & PXIE LEBT Isolated Diaphragm Lionel R Prost Front End
20 Mar 2013
1175-v1 FNAL PXIE - 162.5 MHZ RFQ - PXIE RFQ Endwall Thermal-Structural Analysis Andrew Lambert Unassigned
19 Mar 2013
1174-v1 PXIE RFQ Update Derun Li Presentations
19 Mar 2013
1043-v2 Specifications for PXIE MEBT BPMs Alexander Shemyakin Front End
Instrumentation
14 Mar 2013
1172-v1 Documents for PXIE BPM meeting on 12-Mar-2013 Alexander Shemyakin Front End
Instrumentation
14 Mar 2013
1170-v1 Update on PXIE RFQ simulation Gennady Romanov LE Linac
06 Mar 2013
1051-v2 PXIE Preliminary Shielding Assessment Anthony F Leveling Test Facilities
28 Feb 2013
1165-v1 Power test of a short 50 ohm kicker prototype Ding Sun et al. Presentations
Reports
20 Feb 2013
1158-v1 MEBT BPM Prototype Flange Assembly Design Presentations Matthew L Alvarez Presentations
18 Feb 2013
1137-v1 RF Modeling of the Helical Kicker for Project X Mohamed H A Hassan et al. Presentations
Instrumentation
13 Feb 2013
1161-v1 RFQ- MEBT interface information Alexander Shemyakin Front End
13 Feb 2013
1159-v1 Technical Requirement Specification PXIE MEBT and HEBT quadrupoles and dipole correctors Alexander Shemyakin et al. Front End
08 Feb 2013
1157-v1 Nominal PXIE MEBT bunch structure scenarios Alexander Shemyakin Requirements and Specifications
07 Feb 2013
1156-v1 PXIE RFQ end-wall issues Gennady Romanov LE Linac
05 Feb 2013
1154-v1 Project X HEP seminar at Caltech, January 2013 Bob Tschirhart Experiments
Presentations
30 Jan 2013
1060-v3 PXIE LEBT Solenoid 'preliminary' Design from TD Vladimir Kashikhin et al. Front End
30 Jan 2013
1059-v3 Request for proposal for the PXIE LEBT solenoids (i.e. specs) Lionel R Prost et al. Front End
30 Jan 2013
1153-v1 Muon Spin Rotation Spectroscopy Bob Tschirhart Experiments
24 Jan 2013
1152-v1 Are Accelerators Ready to Drive Subcritical Nuclear Reactors? Stuart D Henderson Reports
24 Jan 2013
1151-v1 PXIE MEBT Bunching Cavity Status Update Meiyu Chen et al. Presentations
Cavities and Cryomodules
LE Linac
18 Jan 2013
1148-v5 PXIE Design Handbook Sergei Nagaitsev Linac
Reports
11 Jan 2013
1150-v1 Project X HEP seminar Bob Tschirhart Experiments
04 Jan 2013
1149-v1 MEBT Buncher Cavity Design Proposal and Specification Meiyu Chen et al. 162.5 MHz
Cavities and Cryomodules
SRF Specifications
03 Jan 2013
1146-v1 Project-X MEBT Fast Chopper Power Supply Proposal Brian E Chase LE Linac
21 Dec 2012
1145-v2 Project-X Synchronous Transfers to Booster or Recycler Brian E Chase LLRF
21 Dec 2012
1147-v1 Project-X Beam Transfer to Booster Brian E Chase et al. Presentations
LE Linac
21 Dec 2012
1144-v1 PXIE MEBT Triplets, Doublets, and Dipole Correctors Vladimir Kashikhin Presentations
Linac
Front End
Simulations
Reports
21 Dec 2012
1143-v1 Project X Physics Study summary of detector R&D for experiment Bob Tschirhart Experiments
20 Dec 2012
1142-v1 Project X Physics Study summary of experiment concepts Bob Tschirhart Experiments
20 Dec 2012
1141-v1 Chopper Scenarios for injection into Booster (part 1) Brian E Chase et al. Presentations
H- Injection
18 Dec 2012
1139-v1 Project X HEP Seminar at University of Wisconsin Dec 2012 Bob Tschirhart Experiments
Presentations
11 Dec 2012
1138-v1 Acceleration of Muons with Project X Linac Valeri A Lebedev HE Linac
06 Dec 2012
1130-v3 Experimental modeling of a Magnetron Transmitter for Superconducting Intensity Frontier Linacs Gregory Kazakevitch et al. Linac
05 Dec 2012
1136-v1 200 Ohm Chopper Update - Dec. 4, 2012 Greg Saewert Presentations
Instrumentation
04 Dec 2012
1131-v1 PXIE RFQ Installation & Commissioning Plan Vic E Scarpine et al. Presentations
Front End
29 Nov 2012
1135-v1 Project X Plans for Snowmass Bob Tschirhart Experiments
Presentations
29 Nov 2012
1134-v1 Project X Research Program staging plan Bob Tschirhart Experiments
Presentations
29 Nov 2012
1133-v1 Project X Research Program Bob Tschirhart Experiments
Presentations
29 Nov 2012
1121-v2 Snowmass strategy briefing to the Fermilab PPD Intensity Frontier department Bob Tschirhart Experiments
Presentations
27 Nov 2012
1126-v3 PXIE Collaboration Meeting - Ion Source & LEBT Lionel R Prost Presentations
27 Nov 2012
1129-v1 PXIE LEBT studies at LBNL Qing Ji Presentations
27 Nov 2012
1128-v1 PXIE RFQ report Derun Li Presentations
27 Nov 2012
1127-v1 PXIE goals and plan Sergei Nagaitsev Presentations
27 Nov 2012
1117-v3 PXIE MEBT status Alexander Shemyakin Front End
27 Nov 2012
1125-v1 Project X presentation to the NuFACT meeting in July 2012 Bob Tschirhart Experiments
Presentations
26 Nov 2012
1124-v1 Project-X presentation to the CIPANP meeting, May 2012 Bob Tschirhart Experiments
Presentations
26 Nov 2012
1123-v1 Muon Physics in the Project X era Bob Tschirhart Experiments
Presentations
26 Nov 2012
1122-v1 Project X outreach presentation at the November 2012 Physics Slam Bob Tschirhart Experiments
Presentations
26 Nov 2012
1120-v1 Project X Research Program presentation to Fermilab PAC Oct 2012 Bob Tschirhart Experiments
Presentations
26 Nov 2012
1119-v1 Letter from Fermilab Director to Project X team regarding the research program Bob Tschirhart Experiments
23 Nov 2012
1118-v2 PXIE Milestones Sergei Nagaitsev Project Management
21 Nov 2012
1116-v1 A MEBT Concept Based on Double Alpha Magnets for Project-X Jean-Francois Ostiguy et al. Proton Driver
LE Linac
19 Nov 2012
1115-v2 Summary of Recent Research Program Activities Bob Tschirhart Experiments
Presentations
16 Nov 2012
1112-v5 PXIE MEBT Absorber Prototype Status Update Curtis Baffes et al. Absorbers
LE Linac
15 Nov 2012
1114-v1 PXIE absorber test bench Alexander Shemyakin et al. LE Linac
06 Nov 2012
1113-v1 Project X: Technolgy, Perspectives, and Applications Steve Holmes Presentations
05 Nov 2012
1102-v2 Production of 99mTc and 99Mo at PXIE Ron Moore Unassigned
31 Oct 2012
896-v1 Magnetron option for a pulse linac of the Project X Gregory Kazakevitch et al. HE Linac
26 Oct 2012
1110-v1 RFQ coupler Sergey Kazakov Presentations
LE Linac
25 Oct 2012
1109-v1 PXIE RFQ RF power source and schedule Ralph J. Pasquinelli 162.5 MHz
23 Oct 2012
1107-v1 PXIE MEBTstatus and plans for FY2013 Alexander Shemyakin Presentations
Front End
Reports
16 Oct 2012
1050-v2 PXIE Enclosure Design Jerry Leibfritz Test Facilities
Conventional Facilities
15 Oct 2012
1106-v1 RFQ Coupler, v10092012 Sergey Kazakov Linac
Unassigned
09 Oct 2012
1105-v1 Project X Siting Workshop Presentations - October 2012 Russ Alber et al. Experiments
Transfer Line
Conventional Facilities
Main Injector
05 Oct 2012
1104-v1 Ion Source Assembly Requirements Lionel R Prost Vacuum
Front End
Ion Source
05 Oct 2012
1103-v1 Project X and PXIE design and Beam Physics Nikolay A. Solyak Linac
03 Oct 2012
1100-v2 Measurements of the electron beam size at the absorber prototype test bench Anna Mitskovets Experiments
Absorbers
03 Oct 2012
1098-v3 Proposal for a ‘Phase I’ PXIE LEBT Bruce Hanna et al. Experiments
Presentations
Space Charge Effects
02 Oct 2012
1099-v1 Microphonics Compensation Results in the SSR1 Cavity Yuriy Pischalnikov et al. LLRF
Instrumentation
07 Sep 2012
1097-v1 PXIE RFQ Interface Control Document Richard P Stanek Front End
LE Linac
13 Aug 2012
1061-v7 Project X Performance by Stage Steve Holmes Project X Facility Requirements
06 Aug 2012
1093-v1 Experimental Modeling of a Magnetron Transmitter for Superconducting Intensity Frontier Accelerators Gregory Kazakevitch et al. Linac
06 Aug 2012
1091-v2 Sputtering of Materials for MEBT Absorber and PXIE Beam Dump Yury I Eidelman Absorbers
02 Aug 2012
1088-v1 Beam absorber for a 2.1-MeV proton beam Igor L Rakhno Absorbers
25 Jul 2012
986-v6 Analysis of Materials for MEBT Absorber Yury I Eidelman Absorbers
25 Jul 2012
1087-v2 Design of alternative beta=0.92 cavity for Project X (part II) Andrei Lunin et al. Linac
25 Jul 2012
1083-v1 Higher Order Modes in the Project-X Linac Mark Champion et al. Linac
20 Jul 2012
1086-v1 MEBT Buncher Cavity pre-Design Review Meiyu Chen et al. 162.5 MHz
Presentations
Reviews
19 Jul 2012
1084-v1 Estimates of X-Ray production and dose rate for the Project X MEBT absorber test bench Lionel R Prost et al. Experiments
Absorbers
13 Jul 2012
1082-v1 PIXIE LCW Requirements Bruce Hanna Front End
Conventional Facilities
12 Jul 2012
1081-v2 200 Ohm Chopper System Progress - July 2012 Greg Saewert Instrumentation
11 Jul 2012
1078-v1 Ion Source and LEBT Statuses Lionel R Prost Presentations
Front End
LE Linac
Ion Source
03 Jul 2012
1076-v1 Project X Physics Study W&C June 22nd 2012 Bob Tschirhart Presentations
29 Jun 2012
1075-v1 Summary of Project X Physics Study Bob Tschirhart Experiments
Presentations
29 Jun 2012
1074-v1 Project X Siting Concepts Presentation Marc Kaducak Experiments
Transfer Line
Conventional Facilities
Linac
29 Jun 2012
1073-v1 PXIE Machine Protection System Jim Steimel et al. Accelerator Physics & System Integration
Presentations
CW Linac
26 Jun 2012
1070-v1 Project X Research Program presentation to the June 2012 PAC Bob Tschirhart Experiments
Presentations
19 Jun 2012
1069-v2 Project X: Accelerator Goals and Challenges Steve Holmes Presentations
16 Jun 2012
1068-v1 PXIE Instrumentation Update - 12June2012 Vic E Scarpine Instrumentation
15 Jun 2012
981-v3 Project X Reference Beam Optics Design Nikolay A. Solyak Linac
07 Jun 2012
1063-v1 Project X presentation to the May 2012 IPAC meeting Bob Tschirhart Presentations
04 Jun 2012
1062-v1 Project X presentation to the CIPANP conference Bob Tschirhart Presentations
04 Jun 2012
966-v4 Project X Front End R&D Program - PXIE Steve Holmes Front End
Requirements and Specifications
29 May 2012
1058-v1 A 500 V Fast Switch For ProjectX 200 Ohm Chopper Daniil Frolov et al. Instrumentation
24 May 2012
1056-v1 Project X chopper update (5/16/12) Tao Tang Other Labs
Presentations
Linac
Instrumentation
16 May 2012
1055-v1 SLAC Project-X RF Development (May 16 2012) Rosa Ciprian et al. Other Labs
Presentations
Linac
16 May 2012
1052-v1 Project X and the Endless Frontier Bob Tschirhart Experiments
Presentations
11 May 2012
1049-v1 Staging Opportunities for Project X Steve Holmes Presentations
08 May 2012
1048-v1 Summary of Project X interactions with the LBNE reconfiguration study Bob Tschirhart Presentations
Friday Meeting
04 May 2012
1047-v1 Letter on behalf of Project X to the LBNE recofiguration steering committee Bob Tschirhart Experiments
Project Management
04 May 2012
1046-v1 BARC IIFC on Instrumentation - April 2012 Visit Summary Gopal Joshi et al. Other Labs
Presentations
Instrumentation
Collaboration
03 May 2012
1045-v1 PXIE MEBT 200 Ohm kicker structure technical specifications Alexander Shemyakin Front End
LE Linac
30 Apr 2012
1044-v1 50 ohm chopper amplifier specification Ralph J. Pasquinelli Front End
30 Apr 2012
1042-v3 SRIM Simulation of the MEBT Absorber Yury I Eidelman Absorbers
LE Linac
26 Apr 2012
1041-v1 Analysis of magnetic measurements of the solenoidal lens # PSSA003 Alexander Shemyakin LE Linac
25 Apr 2012
1040-v1 Working Group 2 Summary from April 2012 collaboration meeting Bob Tschirhart Experiments
20 Apr 2012
1021-v2 Project X Research Program for te 2012 FRA visiting committee Bob Tschirhart Experiments
18 Apr 2012
1037-v1 SSR1 Cryomodule Development - Project X Collaboration Meeting - April 10-12, 2012 Thomas H. Nicol SRF
Presentations
13 Apr 2012
1036-v1 Project X Beta = 0.9, 650 MHz, Cavity and Cryomodule Status Thomas J. Peterson SRF
Presentations
Cryogenics
12 Apr 2012
1035-v1 RF simulation studies of PXIE RFQ Gennady Romanov Proton Driver
LE Linac
12 Apr 2012
1034-v1 PX front end SC cavity design and measurements Timergali Khabiboulline SRF
Presentations
Cavities and Cryomodules
12 Apr 2012
1033-v1 Cavity Test Stands for Project X Andy Hocker SRF
Presentations
11 Apr 2012
1030-v1 LLRF for PXIE Brian E Chase LLRF
1300 MHz/CW
11 Apr 2012
1032-v1 Cavity Processing Issues for Project X Allan M Rowe Presentations
11 Apr 2012
1031-v1 PXIE Beam Diagnostics Manfred Wendt Presentations
Instrumentation
11 Apr 2012
1029-v2 RF Power Sources for PXIE LBNL collaboration meeting Ralph J. Pasquinelli Presentations
11 Apr 2012
1027-v2 MEBT Absorber Status, Project X Collaboration Meeting Curtis Baffes et al. Absorbers
11 Apr 2012
1022-v3 PXIE Vacuum Concept Alex Z Chen Presentations
11 Apr 2012
1028-v3 200Ohm Chopper R&D Progress Greg Saewert Presentations
Front End
Instrumentation
10 Apr 2012
1025-v2 PXIE Overview: Goals, Concepts and Planning Sergei Nagaitsev Presentations
09 Apr 2012
1020-v2 PXIE MEBT concept Alexander Shemyakin Front End
09 Apr 2012
1026-v2 Project X: News, Strategy, Meeting Goals Steve Holmes Presentations
09 Apr 2012
1024-v1 MEBT Buncher Cavities.Por Gennady Romanov Presentations
08 Apr 2012
1023-v1 Bunch-by-Bunch Kicker and its Driver: 50  choice Ralph J. Pasquinelli et al. Presentations
Instrumentation
Absorbers
08 Apr 2012
1019-v2 Planning Notes for the 2012 June Project X Physics Study Bob Tschirhart Experiments
05 Apr 2012
1018-v1 Project X presentation to RESMM12 Bob Tschirhart Experiments
04 Apr 2012
1017-v1 Project X presentation to DPF at Brown University August 2011 Bob Tschirhart Experiments
04 Apr 2012
1016-v1 Project X research program presentation at the Project X Forum on Spallation Sources for Particle Physics Bob Tschirhart Experiments
04 Apr 2012
1013-v1 Power Loss in Project X SSR1 Cavities due to Resonance Excitation of Monopole HOMs Alexander Sukhanov et al. SRF
12 Mar 2012
1012-v1 SiPMT Detector R&D review materials Bob Tschirhart Experiments
11 Mar 2012
1009-v1 Updates on Broadband Chopper Driver Development in SLAC (Mar. 2012) Tao Tang Other Labs
Presentations
Linac
Instrumentation
08 Mar 2012
1011-v1 EM analysis of a helical electrode for a broadband chopper Manfred Wendt Presentations
Linac
Instrumentation
Simulations
08 Mar 2012
1010-v1 SLAC Project-X RF Development, March 7 2012 Rosa Ciprian Other Labs
Presentations
Linac
08 Mar 2012
1006-v4 PXIE Accelerator Physics Valeri A Lebedev Presentations
Reviews
06 Mar 2012
1002-v3 PXIE RFQ design overview Derun Li Linac
Reviews
06 Mar 2012
1007-v2 SSR1 cryomodule for PXIE - PXIE review - March 6-7, 2012 Thomas H. Nicol Presentations
Reviews
06 Mar 2012
1004-v2 PXIE Review Infrastructure and Eng Process Richard P Stanek Reviews
06 Mar 2012
1008-v2 PXIE HWR Cryomodule Peter N Ostroumov Presentations
Reviews
05 Mar 2012
1000-v3 PXIE Medium Energy Beam Transport Alexander Shemyakin Reviews
LE Linac
05 Mar 2012
1005-v1 RF Power Sources for PXIE Ralph J. Pasquinelli SRF
Presentations
Reviews
05 Mar 2012
1003-v1 PXIE Overview Sergei Nagaitsev Linac
Reviews
05 Mar 2012
1001-v1 PXIE Review - Ion Source & LEBT Qing Ji et al. Presentations
Reviews
05 Mar 2012
223-v1 Process to send funds to collaborating institutions Elaine McCluskey Collaboration
17 Jun 2009
998-v1 Kickoff of March 2012 kaon targetry discussion at BNL Bob Tschirhart Experiments
Targetting
29 Feb 2012
997-v1 Cryomodule Assembly Facility (CAF) at Fermilab: Feasibility Overview for Project X & future SRF Cryomodules Assemblies Tug T Arkan SRF
21 Feb 2012
996-v1 Cold Muon concepts for a Project muon experiment Chuck Ankenbrandt Experiments
17 Feb 2012
995-v1 Kickoff discussion for Phase-II study of Muons at Project X Bob Tschirhart Experiments
17 Feb 2012
994-v1 Muon to electron gamma experiment concept poster at the DOE Intensity Frontier Workshop Bob Tschirhart Experiments
17 Feb 2012
993-v1 Muon to electron+gamma experiment concept study Bob Tschirhart Experiments
17 Feb 2012
991-v1 MEBT Absorber Design Status Update Curtis Baffes et al. Absorbers
14 Feb 2012
990-v1 Test of TESEQ CBA 1G-150 wide band 150-Watt amplifier As a Project X Chopper Kicker Driver Valeri A Lebedev et al. Front End
09 Feb 2012
988-v1 Beam dynamic simulations in RFQ with the use of CST Studio Suite. Gennady Romanov LE Linac
08 Feb 2012
987-v1 General Intensity Frontier Presentation to the SPAFOA January 2012 Bob Tschirhart Experiments
27 Jan 2012
985-v1 Project X kaon targetry discussion notes for January 2012 BNL visit Bob Tschirhart Experiments
20 Jan 2012
984-v1 Beam Diagnostic Instrumentation for PXIE Vic E Scarpine Presentations
Instrumentation
17 Jan 2012
983-v1 Project X for the heavy quark session of the Intensity Frontier Workshop Bob Tschirhart Experiments
17 Jan 2012
982-v1 Project X presentation in the Intensity Frontier Workshop neutrino session Bob Tschirhart Experiments
17 Jan 2012
979-v1 PXIE MEBT Chopper Driver Specifications (“Unipolar scheme”) Greg Saewert et al. CW Linac
23 Dec 2011
972-v1 PXIE Vacuum Considerations Alex Z Chen et al. Presentations
21 Dec 2011
978-v1 Effect of condensed gases on SRF cavities Alexander Romanenko SRF
20 Dec 2011
481-v1 Specifications for the Project X Injection Absorber David E. Johnson Unassigned
Requirements and Specifications
19 Dec 2011
915-v1 Functional Requirement Specification Camille Ginsburg 650 MHz
Requirements and Specifications
19 Dec 2011
934-v1 Specifications for PXIE MEBT BPMs Alexander Shemyakin Front End
LE Linac
Requirements and Specifications
19 Dec 2011
624-v2 Broad-band chopper: kicker proposal Brian E Chase et al. Linac
15 Dec 2011
936-v2 200 Ohm Chopper Development Update: Helix Performance & Some Driver Ideas Greg Saewert Instrumentation
15 Dec 2011
975-v1 PXIE RFQ RF Power Source -- In-house development option John S Reid Linac
15 Dec 2011
974-v1 PXIE RFQ RF Power Sources Ralph J. Pasquinelli Linac
15 Dec 2011
973-v1 PXIE RFQ RF Power Requirements Gennady Romanov Linac
15 Dec 2011
971-v1 Beam - related vacuum requirements for PXIE Valeri A Lebedev Vacuum
13 Dec 2011
969-v1 Operation Of Project X Linac As A Driver For Muon Collider Alexander Sukhanov et al. HE Linac
06 Dec 2011
963-v1 Electron Beam Dynamics Simulations for the Proposed Test of the PXIE/Project X MEBT Absorber Lionel R Prost et al. Experiments
Presentations
Absorbers
Simulations
15 Nov 2011
962-v1 Requirements for PXIE MEBT absorber Alexander Shemyakin Front End
Absorbers
LE Linac
15 Nov 2011
961-v1 Preliminary Thermal Analysis of MEBT Absorber Curtis Baffes Absorbers
14 Nov 2011
960-v1 Fermilab Proton Performance Steve Holmes Requirements and Specifications
09 Nov 2011
959-v1 Project X Update Steve Holmes Presentations
09 Nov 2011
957-v2 Electron Cloud Experiments Robert M. Zwaska Instabilities
Main Injector
03 Nov 2011
954-v1 Magnet Design Report: Solenoid for PX LEBT Lionel R Prost Other Labs
01 Nov 2011
953-v1 Project X: Status and Plans Steve Holmes Presentations
28 Oct 2011
941-v1 RF Power Sources for PXIE Ralph J. Pasquinelli RF Sources
26 Oct 2011
951-v1 650 MHz & 325 MHz Sources Rosa Ciprian Linac
26 Oct 2011
950-v1 Project X: Status, Strategy, Meeting Goals Steve Holmes Presentations
Collaboration
26 Oct 2011
949-v1 SSR1 cryomodule for PXIE - Project X collaboration meeting - October 26, 2011 Thomas H. Nicol Presentations
26 Oct 2011
939-v2 Medium Energy Beam Transport Design for PXIE Valeri A Lebedev et al. LE Linac
25 Oct 2011
945-v1 Overview of Project X Frond-End R&D at LBNL Derun Li Linac
25 Oct 2011
948-v1 RF Design Studies of PXIE RFQ and Buncher Cavities Gennady Romanov LE Linac
25 Oct 2011
946-v1 PXIE RFQ Engineering Design and Fabrication Steve P Virostek Linac
25 Oct 2011
944-v1 Project X Reference Design and R&D Plan Sergei Nagaitsev Presentations
24 Oct 2011
943-v1 RFQ and LEBT Progress John Staples Linac
24 Oct 2011
940-v1 Project X Pulsed Linac, Overview and plans Nikolay A. Solyak Presentations
Linac
23 Oct 2011
937-v1 Progress report on fast kicker (cooling version) Valeri A Lebedev et al. Presentations
19 Oct 2011
935-v2 Requirements for the PXIE MEBT chopper Valeri A Lebedev et al. Front End
LE Linac
18 Oct 2011
932-v1 Project X R&D goals and organization Sergei Nagaitsev Project Management
04 Oct 2011
930-v1 Major Requirements to PXIE Optics and Design Valeri A Lebedev LE Linac
17 Sep 2011
928-v2 Analysis of MEBT Beam Dump Mohamed H A Hassan et al. LE Linac
16 Sep 2011
929-v1 HINS Ion Source and RFQ Beam Measurements Vic E Scarpine Instrumentation
HINS
14 Sep 2011
927-v2 Efficiency Test of IOT transmitter Ralph J. Pasquinelli RF Sources
12 Sep 2011
828-v2 HINS six cavity test RF distribution block diagram Ralph J. Pasquinelli HINS
09 Sep 2011
778-v3 PX/HINS Six-Cavity Test Documents Bob Webber Linac
HINS
LE Linac
08 Sep 2011
579-v3 HINS Six-Cavity Test Gennady Romanov HINS
08 Sep 2011
926-v1 Design of alternative β=0.92 cavity for Project X Andrei Lunin et al. HE Linac
06 Sep 2011
925-v2 Technical board meeting on HWR vs SSR0 Sergei Nagaitsev Linac
Project Management
02 Sep 2011
924-v1 New lattice v3.9 for 3 GeV linac Nikolay A. Solyak Linac
01 Sep 2011
492-v1 HINS Room Temperature Cavity Conditioning Robyn L. Madrak HINS
01 Sep 2011
923-v1 Helium II Heat Flow in 650 MHz Helium Vessel Thomas J. Peterson HE Linac
Cryogenics
25 Aug 2011
919-v1 Current Status and Plans for SRF Cavity Processing for Project X Allan M Rowe SRF
Cavities and Cryomodules
19 Aug 2011
921-v1 Front End Test Facility Sergei Nagaitsev Presentations
19 Aug 2011
918-v2 Thoughts on Radiation Shielding for PX Front-End Test Facility Bob Webber Test Facilities
Conventional Facilities
HINS
LE Linac
Ion Source
08 Aug 2011
917-v1 One more time on 162.5 MHz RFQ Andrey Kolomiets LE Linac
20 Jul 2011
916-v1 Overview of field emission problem in SRF cavities Alexander Romanenko SRF
Conventional Facilities
Cavities and Cryomodules
14 Jul 2011
914-v1 Functional Requirements Specification Guidelines Richard P Stanek Requirements and Specifications
12 Jul 2011
913-v1 Notes from the SPL & ESS Collaboration Meeting Manfred Wendt Presentations
08 Jul 2011
903-v1 Project X Upgrade Options for 4 MW at 8 GeV Sergei Nagaitsev Presentations
05 Jul 2011
902-v1 Deflecting efficiency of a kicker with plane or cylindrical electrodes Alexander Shemyakin et al. LE Linac
21 Jun 2011
842-v3 A parallel-plate capacitor as a model of a kicker Lionel R Prost et al. Unassigned
LE Linac
21 Jun 2011
901-v1 Six-Cavity Test Installation Plan - June 2011 Bob Webber HINS
16 Jun 2011
900-v1 Raising Medium field Q0 : Ways to Proceed Alexander Romanenko SRF
14 Jun 2011
898-v1 Spoke014 Cavity for ADS in China Jianping Dai et al. 325 MHz
09 Jun 2011
897-v1 Project X H- Ion Source Acceptance Test and Future Plan Qing Ji Ion Source
07 Jun 2011
895-v1 Project X Lattice update Nikolay A. Solyak Linac
Simulations
31 May 2011
893-v2 Beam chopping for injection into RR/MI Sergei Nagaitsev Presentations
H- Injection
25 May 2011
892-v1 RFQ Construction Options Derun Li LE Linac
20 May 2011
891-v1 LEBT, RFQ and MEBT since April Meeting John Staples LE Linac
Ion Source
20 May 2011
890-v1 Project X H- Ion Source Acceptance Test and Future Plan Qing Ji Ion Source
20 May 2011
886-v1 Project-X RFQ. EM design issues. Gennady Romanov Front End
18 May 2011
889-v1 Design Limitations for MEBT Kicker Valeri A Lebedev Presentations
17 May 2011
888-v1 Investigating the problem space of beam injection schemes for Project X Julien Branlard H- Injection
17 May 2011
887-v1 First Beam Measurements from Longitudinal Bunch Shape Monitor at HINS Christoph Maag HINS
17 May 2011
884-v1 325 MHz coupler designs Sergey Kazakov SRF
13 May 2011
883-v1 First Beam Data from Fast Faraday Cup at HINS Vic E Scarpine HINS
12 May 2011
882-v1 Mechanical Readiness for Six-Cavity Test Installation Alex Z Chen HINS
12 May 2011
881-v1 HINS 2.5 MeV Beam Optics and Emittance Measurements Bruce Hanna HINS
12 May 2011
877-v1 Project X: A New Multi-Megawatt Proton Source at Fermilab Sergei Nagaitsev Presentations
05 May 2011
876-v1 ProjectX CW LInac Lattice Version 3.8.7.1 Nikolay A. Solyak Linac
03 May 2011
875-v1 Test Results With a Prototype Helical Kicker Greg Saewert HE Linac
HINS
03 May 2011
874-v1 Bandwidth Considerations for the Project X Fast Kicker Brian E Chase Presentations
03 May 2011
873-v1 Test Results of 1st Prototype Chopper Kicker Ding Sun HINS
LE Linac
03 May 2011
872-v1 SNS/ProjectX Commissioning/Infrastructure Willem Blokland Operations
Controls
Presentations
Linac
Instabilities
Instrumentation
22 Apr 2011
871-v1 Beam Diagnostics: Requirements David E. Johnson et al. Presentations
Linac
Instrumentation
22 Apr 2011
870-v1 Beam Diagnostics & Beam Studies at HINS / MDB Vic E Scarpine Presentations
Linac
Instrumentation
HINS
22 Apr 2011
869-v1 Beam Loss Monitors operating at Cryogenic Temperature with FPGA- Based TDC Signal Processing Arden A. Warner et al. Presentations
Linac
Instrumentation
22 Apr 2011
868-v1 Propagation and noise experiments for a fiber-delivered laser wire John M Byrd et al. Presentations
Linac
Instrumentation
Collaboration
22 Apr 2011
866-v1 High Power Fast Faraday Cup R&D Craig Deibele et al. Presentations
Linac
Instrumentation
Collaboration
22 Apr 2011
865-v1 BPMs as Phase Monitors Craig Deibele Presentations
Linac
Instrumentation
Collaboration
22 Apr 2011
864-v1 Considerations for FET-based Broadband Chopper Modulator Craig Burkhart et al. Presentations
Linac
Instrumentation
Collaboration
22 Apr 2011
863-v1 Status of the Kicker R&D for a Broadband Chopper Greg Saewert et al. Presentations
Linac
Instrumentation
22 Apr 2011
862-v2 Simple estimations for a LEBT kicker Alexander Shemyakin Unassigned
22 Apr 2011
861-v1 SSR0 Segmentation Jean-Francois Ostiguy et al. Linac
19 Apr 2011
655-v22 HINS Linac Safety Assessment and Radiation Shielding Assessment Docs Peter Kasper et al. Linac
HINS
LE Linac
15 Apr 2011
860-v1 Project X HOM Coupler Status Vyacheslav P. Yakovlev Linac
15 Apr 2011
857-v2 Working Group 3 RF Summary Brian E Chase et al. Linac
15 Apr 2011
853-v1 HIGH-EFFICIENCY RF POWER AMPLIFIERS AND TRANSMITTERS Frederick H Raab Linac
15 Apr 2011
854-v1 Linac RF System Design Options Yoon Kang Linac
15 Apr 2011
855-v1 Longitudinal dynamic analysis for the 3-8 GeV pulsed LINAC Gustavo I Cancelo LLRF
14 Apr 2011
852-v1 RF Power Sources for Project X Ralph J. Pasquinelli Linac
14 Apr 2011
851-v1 RF Control Requirements for Project X Brian E Chase LLRF
14 Apr 2011
850-v1 Providing Ions for 1MW H- Beams Martin P Stockli Ion Source
12 Apr 2011
849-v1 MEBT and Chopper Section Valeri A Lebedev LE Linac
12 Apr 2011
848-v1 MEBT Design John Staples LE Linac
12 Apr 2011
847-v1 ANL CW RFQ Design Peter N Ostroumov LE Linac
12 Apr 2011
846-v1 LEBT and 162.5MHz CW RFQ Design John Staples Ion Source
12 Apr 2011
845-v1 H- Ion Source and LEBT Development Qing Ji Ion Source
12 Apr 2011
844-v1 Front End WG: Introduction Sergei Nagaitsev Presentations
12 Apr 2011
843-v1 Project X Reference Design Overview Sergei Nagaitsev Presentations
12 Apr 2011
810-v1 HINS H- ion source test stand at pre-acc R&D lab Daniel S Bollinger et al. Experiments
HINS
07 Apr 2011
841-v1 Project X - A New Multi-MW Proton Source at Fermilab Sergei Nagaitsev Presentations
07 Apr 2011
840-v1 Project X Cryomodule Configurations Thomas H. Nicol Presentations
Cavities and Cryomodules
Cryogenics
325 MHz
LE Linac
22 Mar 2011
839-v1 LEBT, 81 MHz RFQ, … Milorad B. Popovic Front End
LE Linac
17 Mar 2011
835-v1 MEBT Design Eliana Gianfelice-Wendt et al. Linac
Simulations
09 Mar 2011
838-v1 Front End Progress Qing Ji et al. LE Linac
09 Mar 2011
837-v1 Ion source and LEBT Qing Ji Ion Source
09 Mar 2011
832-v1 CW Re-Buncher Cavity Design for Project X Gennady Romanov Presentations
LE Linac
09 Mar 2011
833-v1 Beam absorber Iouri Terechkine Absorbers
LE Linac
09 Mar 2011
831-v1 FNAL RFQ Studies for Project-X Andrey Kolomiets et al. Presentations
LE Linac
09 Mar 2011
834-v1 Project X Front End Workshop Sergei Nagaitsev Presentations
09 Mar 2011
830-v1 Project X Poster at InPAC 2011 Jim Kerby Presentations
Project Management
07 Mar 2011
829-v1 Project X Overview Talk at InPAC2011 Jim Kerby Presentations
Project Management
07 Mar 2011
827-v1 A Strategy for Cavity Resonance Control in the Project X CW Linac Brian E Chase et al. Linac
02 Mar 2011
826-v1 A compact cavity for the beam splitter of the Project X Vyacheslav P. Yakovlev Linac
01 Mar 2011
817-v2 Failure Analysis of beam line elements Arun Saini Linac
15 Feb 2011
825-v1 Project X Collaboration Meeting (Apr 2011): working groups Sergei Nagaitsev Collaboration
11 Feb 2011
824-v1 650 MHz Cryomodule, Stand-alone TESLA-style Thomas J. Peterson Presentations
HE Linac
Cryogenics
10 Feb 2011
821-v1 SSR1-01 Pulsed tests Robyn L. Madrak et al. SRF
HINS
10 Feb 2011
819-v1 SSR1-01 Pulsed Tests Robert L Wagner SRF
HINS
325 MHz
10 Feb 2011
822-v1 Brief Summary of SSR1 LFD Compensation Yuriy Pischalnikov et al. SRF
Linac
HINS
LE Linac
10 Feb 2011
823-v1 Solenoid Lenses for SSR Cryomodules Iouri Terechkine SRF
Presentations
Linac
HINS
10 Feb 2011
820-v1 Multipactor simulation in 650MHz cavities of Project X Sergey Kazakov SRF
09 Feb 2011
818-v1 Top-loaded box cryomodules at ANL Joel D. Fuerst LE Linac
08 Feb 2011
816-v1 Project X Front-end concept for 162.5 MHz RFQ Alexander Vostrikov Presentations
Linac
04 Feb 2011
815-v1 Ecloud: A quick check of the microwave method with obstructions ("ears") in MI beam pipe Cheng-Yang Tan Main Injector
03 Feb 2011
814-v1 Cryomodule Helium Pressure Stability Thomas J. Peterson Presentations
Instabilities
HE Linac
Cryogenics
30 Jan 2011
813-v1 SSR0 design update Leonardo Ristori SRF
Cavities and Cryomodules
Cavities and Cryomodules
Front End
325 MHz
Simulations
27 Jan 2011
811-v1 Project-X 162.5 MHz RFQ Design Proposal Andrey Kolomiets Front End
LE Linac
24 Jan 2011
809-v1 Design studies of 162.5 MHz RFQ Sunny Lalitha sanyasirao Sista venugopal Presentations
Linac
LE Linac
20 Jan 2011
779-v3 Options for RF power couplers and HOMs Vyacheslav P. Yakovlev Linac
15 Dec 2010
803-v1 Project-X Front-End Update John Staples Other Labs
Presentations
Front End
15 Dec 2010
801-v1 ANL proposal: 162.5 MHz Front End for the Project X Peter N Ostroumov LE Linac
15 Dec 2010
802-v1 Project X update Sergei Nagaitsev Presentations
14 Dec 2010
798-v1 Possible Configurations for Prototypes of PX Cryomodules: SSR0 and SSR1 Iouri Terechkine SRF
Presentations
Linac
HINS
LE Linac
10 Dec 2010
792-v2 Chopping and Limitations to MEBT Valeri A Lebedev Transfer Line
Presentations
Absorbers
Space Charge Effects
LE Linac
03 Dec 2010
797-v1 Broadband Chopper Manfred Wendt Presentations
03 Dec 2010
796-v1 Project X: A Multi-MW Proton Source at Fermilab Steve Holmes Presentations
02 Dec 2010
795-v1 Status and plans for SSR0 and SSR1 Cavities Bob Webber SRF
HINS
SRF Specifications
LE Linac
01 Dec 2010
793-v1 Scenarios with 325 and 162.5 MHz linac bunches Sergei Nagaitsev Experiments
Presentations
Linac
01 Dec 2010
790-v1 Project-X RFQ Andrey Kolomiets Linac
17 Nov 2010
789-v1 IOT power compression test Ralph J. Pasquinelli 650 MHz
16 Nov 2010
786-v1 Project-X Presentation to the Fermilab PAC Bob Tschirhart Presentations
13 Nov 2010
785-v1 Project X: A Multi-MW Proton Source at Fermilab Steve Holmes Presentations
10 Nov 2010
784-v1 Project X retreat (Nov 2, 2010) summary Sergei Nagaitsev Accelerator Physics & System Integration
09 Nov 2010
783-v1 325 MHz Spoke Cavity Status and FY11 Plans Bob Webber SRF
Presentations
Linac
HINS
LE Linac
04 Nov 2010
777-v1 Physics Design of PrX linacs Nikolay A. Solyak Linac
04 Nov 2010
782-v1 325 MHz Spoke Cavity Prototype Cryomodule Bob Webber SRF
Linac
HINS
SRF Specifications
LE Linac
03 Nov 2010
771-v1 Chopping and Limitations to MEBT; Injection to Recycler Valeri A Lebedev H- Injection
Absorbers
LE Linac
02 Nov 2010
780-v1 RF Issues with Configuration Options Brian E Chase Presentations
02 Nov 2010
773-v1 Front-end R&D Plans - SSR Prototype and Chopper Section Bob Webber Presentations
Linac
HINS
LE Linac
01 Nov 2010
770-v1 SSR1 Cryomodule Status Thomas H. Nicol SRF
Presentations
Linac
HINS
LE Linac
01 Nov 2010
768-v1 2.5 MeV Chopper Beam Absorber Thermal Considerations Iouri Terechkine Linac
Absorbers
LE Linac
27 Oct 2010
767-v1 MEBT Chopper Beam Dump Nikolai Mokhov Presentations
Linac
HINS
LE Linac
27 Oct 2010
766-v1 Current Leads for Superconducting Solenoids Valeri Poloubotko SRF
Linac
HINS
LE Linac
25 Oct 2010
542-v2 HINS R&D Activities at Meson Detector Building Jim Steimel et al. HINS
22 Oct 2010
764-v1 MDB Beam Test Facility Plan Bob Webber Linac
HINS
LE Linac
Ion Source
21 Oct 2010
763-v1 MI Magnetic Field Measurements Cheng-Yang Tan Main Injector
21 Oct 2010
762-v1 Proposal to test TiN at SPS Cheng-Yang Tan Main Injector
21 Oct 2010
759-v1 325MHz Cavity Processing Proposal for FY11 Allan M Rowe SRF
Linac
LE Linac
14 Oct 2010
758-v1 The Ecloud Measurement Setup in the Main Injector Cheng-Yang Tan et al. Experiments
Main Injector
13 Oct 2010
538-v3 Estimate of X-Ray Shielding and Radiation Monitoring for Safe Operation of the HINS Cavity Test Cave in the Meson Detector Building Jim Steimel et al. HINS
12 Oct 2010
755-v1 HINS Test Cryostat 2 K Conversion Status Thomas H. Nicol SRF
HINS
Cryogenics
07 Oct 2010
616-v1 Chopper in HINS (RFQ+matcher+Chopper) Nikolay A. Solyak SRF
HINS
Simulations
04 Oct 2010
752-v1 Proposal for Chopper Testing at HINS Facility Nikolay A. Solyak Proton Driver
HINS
Simulations
04 Oct 2010
751-v1 CW Linac (IC-2+): Lattice Design in Project-X Nikolay A. Solyak Linac
04 Oct 2010
750-v1 Integration of the SSR cryomodules into the Project X cryo system and implications for the SSR1 prototype Thomas J. Peterson Presentations
Cryogenics
30 Sep 2010
437-v1 Minutes - HINS Cryo, Test Cave, SSR Robyn L. Madrak HINS
29 Sep 2010
748-v1 IIFC on Instrumentation and Controls TS Ananthakrishnan et al. Other Labs
Controls
Presentations
Linac
Instrumentation
24 Sep 2010
746-v1 Instrumentation & Controls Willem Blokland et al. Controls
Instrumentation
22 Sep 2010
740-v2 Linac Integration John D Galambos et al. Linac
13 Sep 2010
747-v4 Pulsed Linac & Injection David E. Johnson et al. Linac
09 Sep 2010
744-v2 Linac Front End Woking Group Summary Bob Webber Linac
Collaboration
LE Linac
Ion Source
09 Sep 2010
666-v2 325 MHz Cavity Tests Timergali Khabiboulline et al. SRF
HINS
09 Sep 2010
741-v1 Cavities & Cryomodules Robert Rimmer SRF
09 Sep 2010
743-v1 Cryogenics WG report Arkadiy Klebaner Cryogenics
09 Sep 2010
742-v1 Linac RF WG1 summaru Ralph J. Pasquinelli Linac
Reports
09 Sep 2010
745-v1 Main Injector/Recycler Ioanis Kourbanis Recycler
Main Injector
09 Sep 2010
699-v3 HOMs in PX Vyacheslav P. Yakovlev et al. HE Linac
08 Sep 2010
680-v4 325/650 Cavity EM Design Vyacheslav P. Yakovlev et al. SRF
08 Sep 2010
700-v2 Pulsed Linac Design and Options Sergei Nagaitsev Linac
08 Sep 2010
711-v1 650 CM Design Concepts Robert Rimmer SRF
Cryogenics
08 Sep 2010
682-v1 650 Cavity Design Concepts Frank Marhauser et al. SRF
08 Sep 2010
710-v1 CM Design Concepts Thomas J. Peterson Cryogenics
08 Sep 2010
719-v1 LBNL PX Proposal Derun Li Linac
Collaboration
LE Linac
Ion Source
08 Sep 2010
712-v1 Coupler Design Concepts Sergey Kazakov Cryogenics
08 Sep 2010
686-v1 Recent MI Results on TiN and C Coated Beam Pipes Robert M. Zwaska Main Injector
08 Sep 2010
707-v1 Project X Cavity Detuning Warren Schappert SRF
08 Sep 2010
737-v3 SRF Cavity Processing for Project X Allan M Rowe SRF
08 Sep 2010
706-v1 RF Controls Strategies Brian E Chase LLRF
Presentations
08 Sep 2010
695-v1 12 GeV Cryo System Dana Arenius Cryogenics
08 Sep 2010
739-v1 RF Simulations and Analysis for the Project-X Main Injector Cavity Liling Xiao MI RF
08 Sep 2010
677-v1 CW Linac Design Nikolay A. Solyak SRF
Linac
HE Linac
Collaboration
LE Linac
08 Sep 2010
698-v1 Intrabeam Stripping Jean-Francois Ostiguy Linac
Simulations
08 Sep 2010
705-v1 PX Instrumentation R&D at HINS Vic E Scarpine Instrumentation
HINS
08 Sep 2010
661-v5 Plans for a New Front-End for the existing FNAL Linac W. Pellico et al. Collaboration
08 Sep 2010
733-v1 Microphonics (Remote Access) - Mathias Liepe Matthias Liepe SRF
LLRF
HE Linac
LE Linac
08 Sep 2010
727-v2 Laser Stripping Options David E. Johnson H- Injection
08 Sep 2010
726-v1 Recycler Injection with Foil David E. Johnson H- Injection
08 Sep 2010
664-v4 CCM Design Status Mark Champion et al. Linac
08 Sep 2010
667-v1 Joint ANL/FNAL Chemistry Facility at Argonne Michael P. Kelly et al. SRF
08 Sep 2010
702-v2 Beam Optics at HINS Eliana Gianfelice-Wendt HINS
Simulations
08 Sep 2010
687-v1 Electron Cloud Modeling for the Main Injector Paul Lebrun et al. Simulations
Main Injector
08 Sep 2010
717-v1 H- Sources and LEBTs for 1 MW Beams Martin P Stockli Linac
Collaboration
LE Linac
Ion Source
08 Sep 2010
715-v2 ESS Opportunities Andreas Jansson Other Labs
Presentations
Instrumentation
08 Sep 2010
713-v3 Laser Diagnostics John M Byrd et al. Other Labs
Presentations
Instrumentation
08 Sep 2010
738-v1 Space Charge Simulations for MI Robert D Ryne Main Injector
08 Sep 2010
665-v2 CCM R&D Plan Robert D Kephart SRF
08 Sep 2010
736-v1 Project X Instrumentation R&D at HINS Vic E Scarpine Instrumentation
08 Sep 2010
735-v2 CW Linac Design Nikolay A. Solyak Linac
HE Linac
08 Sep 2010
718-v1 H- Ion Source Activities at FNAL Daniel S Bollinger Linac
Collaboration
LE Linac
Ion Source
08 Sep 2010
681-v1 325/650 Cavity Mech Design Michael H Foley Conventional Facilities
08 Sep 2010
674-v2 Bus Survey Charles Briegel Controls
08 Sep 2010
721-v2 Project X: Status, Strategy, Meeting Goals Steve Holmes Presentations
Collaboration
08 Sep 2010
701-v5 Foil Issues Deepak Raparia H- Injection
08 Sep 2010
670-v1 MI Simulations with SYNERGIA Eric G Stern Space Charge Effects
Simulations
Main Injector
08 Sep 2010
730-v1 Progress and Plans on MI beam Pipe Coatings David P Capista et al. Instabilities
Main Injector
07 Sep 2010
694-v1 SPX Cryogenic System Joel D. Fuerst Cryogenics
07 Sep 2010
734-v0 Indian Activities - Sandeep TBC TBD To Be Determined None
07 Sep 2010
704-v1 MOSFET Chopper Tao Tang Other Labs
Presentations
Linac
HINS
07 Sep 2010
691-v1 ACNET in a Box Richard M. Neswold Controls
07 Sep 2010
703-v1 Other Chopper Ideas Greg Saewert Linac
HINS
07 Sep 2010
725-v2 FRIB Instrumentation Saeed Assadi Other Labs
Presentations
Instrumentation
07 Sep 2010
731-v1 RFQ Activities in India Sunny Lalitha sanyasirao Sista venugopal Presentations
Linac
Collaboration
LE Linac
07 Sep 2010
668-v1 Introduction Ioanis Kourbanis Main Injector
07 Sep 2010
671-v2 Preparation of Intense Bunches at MI 8 GeV Kiyomi Seiya Main Injector
07 Sep 2010
697-v2 SNS Operations Experience John D Galambos Other Labs
07 Sep 2010
689-v1 Alarms Brian S. Hendricks Controls
07 Sep 2010
678-v1 SNS Diagnostics John D Galambos Other Labs
Presentations
07 Sep 2010
722-v1 ICD-2 Overview Sergei Nagaitsev Recycler
Linac
Main Injector
07 Sep 2010
673-v1 TClock vs. XClock Charles Briegel Controls
07 Sep 2010
675-v1 PX Cryo Overview Arkadiy Klebaner Cryogenics
07 Sep 2010
676-v1 Cryogenics R&D plan Arkadiy Klebaner Cryogenics
07 Sep 2010
692-v1 XFEL Cryogenic System Bernd Petersen Cryogenics
07 Sep 2010
709-v1 Cryogenic Segmentation Jay C. Theilacker Cryogenics
07 Sep 2010
690-v1 EPICS-ACNET Dennis J. Nicklaus Controls
07 Sep 2010
683-v1 New MI Cavity Progress and Plans 2010 Joseph E Dey MI RF
07 Sep 2010
728-v1 Experiences with the Fermilab HINS 325 MHz RFQ Timergali Khabiboulline et al. Linac
HINS
LE Linac
07 Sep 2010
714-v0 SNS Activities Willem Blokland None
04 Sep 2010
688-v1 GUIs Carl Schumann Controls
07 Sep 2010
716-v1 H- Ion Source for Project X Qing Ji Presentations
Linac
LE Linac
Ion Source
07 Sep 2010
672-v1 HRM Paul A Kasley Controls
07 Sep 2010
723-v1 325 MHz SS - Doug Horan Doug Horan Other Labs
07 Sep 2010
724-v1 FIRST HIGH GRADIENT TEST RESULTS OF A DRESSED 325 MHZ SUPERCONDUCTING SINGLE SPOKE RESONATOR AT FERMILAB Timergali Khabiboulline et al. SRF
Linac
HINS
LE Linac
07 Sep 2010
662-v1 650 MHz Meson RF Test Stand for Project X Ralph J. Pasquinelli LE Linac
07 Sep 2010
663-v1 1300 MHz Sources Sam Chu SRF
07 Sep 2010
679-v1 RFQ, LEBT and MEBT issues John Staples Linac
LE Linac
07 Sep 2010
720-v0 SNS PX Proposal TBD To Be Determined None
04 Sep 2010
696-v0 LLRF/Microphonics Brian E Chase None
04 Sep 2010
693-v0 SNS Cryo System Fabio Casagrande None
04 Sep 2010
659-v1 Laser Chopper for Project X David E. Johnson Presentations
03 Sep 2010
230-v10 Project X ICD-2 Document Paul Derwent Reports
30 Aug 2010
657-v1 Third Report on SSR1-01 RF Results in MDB Cryostat and Power Coupler Qext Calculations Timergali Khabiboulline SRF
Presentations
Linac
HINS
LE Linac
27 Aug 2010
647-v1 Couplers for Project X Sergey Kazakov SRF
26 Aug 2010
519-v1 HINS MDB Ion Source Safety Documents Roger Dixon et al. HINS
24 Aug 2010
654-v2 HINS Report for DOE Site Visit - B&R Code KA15-02-011_August_23_2010 Bob Webber SRF
Presentations
Linac
HINS
LE Linac
23 Aug 2010
653-v1 Second Report on SSR1 Tuner Results in MDB Cryostat Yuriy Pischalnikov SRF
Linac
HINS
LE Linac
22 Aug 2010
652-v1 Second Report on SSR0-1 RF Results in MDB Cryostat Timergali Khabiboulline SRF
Linac
HINS
LE Linac
22 Aug 2010
650-v1 SSR1 cold test - FAST/SLOW TUNER - first data Yuriy Pischalnikov SRF
Presentations
Linac
HINS
LE Linac
20 Aug 2010
649-v1 SSR1-01 First Cooldown and RF Results in MDB Test Cryostat Timergali Khabiboulline Linac
HINS
LE Linac
20 Aug 2010
241-v4 Collaboration Meeting Plan Steve Holmes Collaboration
13 Aug 2010
643-v1 RFQ input-output beam parameters Gennady Romanov HINS
05 Aug 2010
642-v1 Optimization of Wire Scanner position for HINS Energy Spread Measurement Eliana Gianfelice-Wendt Presentations
Instrumentation
HINS
Simulations
LE Linac
04 Aug 2010
634-v2 PX Conventional Facilities - Fixed Target Area Graphics Russ Alber Conventional Facilities
02 Aug 2010
638-v1 PX Conventional Facilities - Preliminary CDR Drawings PDF Set Russ Alber Conventional Facilities
02 Aug 2010
635-v4 Project-X presentation for ICHEP Bob Tschirhart Presentations
02 Aug 2010
641-v1 CW re-buncher status Gennady Romanov LE Linac
30 Jul 2010
640-v1 Project X: Ion Source & LEBT R&D plan and Status Report Qing Ji Ion Source
30 Jul 2010
639-v2 Implications of Beam Energy on Transport Line David E. Johnson Transfer Line
27 Jul 2010
637-v1 Couplers design efforts Sergey Kazakov Linac
26 Jul 2010
614-v4 Cavities for the 650 MHz part of CW Project X linac (FNAL-JLAB meeting). Vyacheslav P. Yakovlev et al. SRF
19 Jul 2010
632-v3 HOMs in 650 MHz section of the Project-X linac Vyacheslav P. Yakovlev et al. HE Linac
19 Jul 2010
633-v1 HINS Six-Cavity Test Presentation to PX Front-End Meeting Bob Webber Presentations
HINS
LE Linac
07 Jul 2010
631-v1 A Look at PX 2.5 MeV Chopper Beam Dump Thermal Issue Iouri Terechkine HINS
Absorbers
LE Linac
01 Jul 2010
630-v1 Analysis of CC2 data at 4K Gustavo I Cancelo LLRF
Controls
Presentations
30 Jun 2010
629-v1 Controlling Cavity Detuning for Project X Warren Schappert LLRF
29 Jun 2010
627-v1 Broad-band chopper R&D Ding Sun Linac
24 Jun 2010
626-v1 Intrumentation for HINS/Project-X at Meson Vic E Scarpine Instrumentation
HINS
23 Jun 2010
623-v1 Pearson Current Toroid Vacuum and Bake-out Test Results Bob Webber Instrumentation
HINS
LE Linac
15 Jun 2010
620-v1 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
06 Jun 2010
541-v3 HINS Test Facility at Meson System Overview of Hazards Elmie Peoples et al. HINS
02 Jun 2010
617-v1 PX_solyak_lattice_front-end_in_HINS_Cave Bob Webber Presentations
HINS
LE Linac
26 May 2010
615-v1 Chopper Lattice in TraceWin Nikolay A. Solyak SRF
HINS
20 May 2010
613-v2 Impressions_of_CWRF2010 Sergey Kazakov SRF
19 May 2010
612-v1 Meson Detector Building Plans for Project X and SRF Bob Webber SRF
HINS
LE Linac
17 May 2010
611-v1 A Review of Low β Resonator Performance Gennady Romanov SRF
HINS
LE Linac
14 May 2010
610-v1 SC options for low energy part of Project X linac Gennady Romanov SRF
HINS
LE Linac
14 May 2010
609-v1 Single-spoke Cavity Cryomodule Integration and Fabrication Considerations Iouri Terechkine SRF
HINS
14 May 2010
608-v1 Proposal for HINS R&D program related to Project X Sergei Nagaitsev HINS
12 May 2010
600-v3 An Estimate of Orbit Correction for SSR0 section of the Project X Valeri A Lebedev Presentations
Linac
HINS
12 May 2010
607-v1 RT Options for the Low Energy Part of Project X Linac Gennady Romanov HINS
LE Linac
12 May 2010
602-v1 Accelerator R&D update Sergei Nagaitsev Linac
10 May 2010
601-v2 A Proposal For An Upgraded Booster For Project X W. Pellico et al. RCS
04 May 2010
598-v1 HINS Beam Absorber MARS15 Simulations (extended) Nikolai Mokhov Presentations
HINS
Absorbers
30 Apr 2010
594-v1 Project X (Tesla Technology Collaboration meeting, April 19, 2010 Robert D Kephart SRF
19 Apr 2010
593-v1 HINS H- Ion Source Status Bob Webber HINS
Ion Source
14 Apr 2010
590-v1 Assumptions about Q values in cw linac Nikolay A. Solyak SRF
07 Apr 2010
586-v1 Possible Siting of HTS2 in Meson Detector Building Bob Webber HINS
02 Apr 2010
585-v1 HINS Front-end Beam Facility Status Bob Webber HINS
LE Linac
01 Apr 2010
457-v1 Project X MEBT/Chopper and 3-Cavity SSR0 in MDB Bob Webber HINS
LE Linac
01 Apr 2010
572-v1 SNS D-Plate beam Dump Documents Michael Plum HINS
31 Mar 2010
450-v3 Project X CW linac design Nikolay A. Solyak Presentations
Linac
26 Mar 2010
453-v1 Linac LLRF discussion Sergei Nagaitsev LLRF
25 Mar 2010
447-v2 Project X Update Vyacheslav P. Yakovlev et al. Presentations
Linac
24 Mar 2010
452-v1 Using Booster, Switchyard and MI-8 in Project X Robert M. Zwaska et al. Presentations
20 Mar 2010
573-v1 Radiation Shielding Tests for Laser Power Supply David E. Johnson Instrumentation
18 Mar 2010
451-v1 Project X Status and Strategy Steve Holmes Presentations
17 Mar 2010
449-v1 The Front-End System Study of Project X Derun Li Presentations
16 Mar 2010
448-v1 Project X Status Report Sergei Nagaitsev Presentations
16 Mar 2010
444-v1 Intrabeam Stripping Valeri A Lebedev SRF
HE Linac
LE Linac
03 Mar 2010
442-v1 A Multi-Stripline Chopper with individual MOSFET Drivers Manfred Wendt Presentations
Linac
Instrumentation
02 Mar 2010
441-v2 Options for Locating 325MHz Cryomodule Test Stand at MDB Bob Webber Presentations
HINS
24 Feb 2010
439-v1 Wai-Ming Tam's Thesis and Final Reports Wai-Ming Tam HINS
18 Feb 2010
438-v1 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
16 Feb 2010
435-v1 HINS Initial RFQ Beam Studies Vic E Scarpine HINS
12 Feb 2010
415-v1 Draft Requirements for Ctrl-X Central Services Timofei B. Bolshakov et al. Controls
06 Feb 2010
429-v1 "Ecloud" Measurements with MI IPMs Cheng-Yang Tan Space Charge Effects
04 Feb 2010
574-v1 CW SRF H- LINAC AS A PROTON DRIVER FOR MUON COLLIDERS AND NEUTRINO FACTORIES Chuck Ankenbrandt et al. Proton Driver
03 Feb 2010
430-v1 Design concepts for a pulsed multi-GeV H¯ LINAC Peter N Ostroumov Presentations
Linac
HINS
03 Feb 2010
428-v1 HINS R&D Program Goals Statement Bob Webber HINS
02 Feb 2010
413-v1 Brainstroming on Ctrl-X Software Build Environment Carl Schumann Controls
02 Feb 2010
410-v1 Project X Control System Requirements Timofei B. Bolshakov et al. Controls
02 Feb 2010
405-v1 Specifications for the Proton Driver Injection Absorber David E. Johnson Proton Driver
Main Injector
31 Jan 2010
575-v1 PROJECT-X, SRF, AND VERY LARGE POWER STATIONS Chuck Ankenbrandt et al. Unassigned
29 Jan 2010
245-v1 NSLS2 Project Management Support Diane Hatton Project Management
28 Jan 2010
426-v1 HINS Possibilities for Project X, January 2010 Bob Webber SRF
Presentations
Instrumentation
HINS
26 Jan 2010
417-v1 2 MW Upgrade of the Fermilab Main Injector Weiren Chou Main Injector
20 Jan 2010
416-v1 Lifetime of Stark States Hydrogen Atom in Magnetic Field Calculation and Estimation of Losses at Stripping Injection Alexandr Drozhdin et al. Presentations
RCS
Main Injector
20 Jan 2010
425-v1 Rapid Cycling Synchrotron Option for Project X Weiren Chou RCS
20 Jan 2010
424-v1 A Hybrid Design of Project-X Weiren Chou Linac
RCS
20 Jan 2010
423-v1 A Simple Transition-free Lattice of an 8 GeV Proton Synchrotron Weiren Chou RCS
20 Jan 2010
422-v1 Test of New Stripping Foils in the Booster Weiren Chou et al. RCS
Main Injector
20 Jan 2010
421-v1 Overview of proton drivers for neutrino super beams and neutrino factories Weiren Chou Presentations
Linac
RCS
Main Injector
20 Jan 2010
420-v1 High energy H- ion transport and stripping Weiren Chou Linac
RCS
Main Injector
20 Jan 2010
419-v1 8 GeV H- ions: transport and injection Weiren Chou Linac
RCS
Main Injector
20 Jan 2010
418-v1 An 8-GeV Synchrotron-Based Proton Driver Weiren Chou RCS
20 Jan 2010
409-v1 Initial Observations of Beam Transmission vs. RF Power for the HINS RFQ Jim Steimel et al. HINS
19 Jan 2010
408-v1 Results of First Wire Scans of HINS 2.5 MeV Beam Bob Webber Instrumentation
HINS
19 Jan 2010
549-v1 HINS Clock Events, Definitions, and Usage Bob Webber HINS
12 Jan 2010
354-v1 Thoughts on RF Frequency Configuration Steve Holmes Managers Meetings
Linac
08 Jan 2010
352-v1 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
07 Jan 2010
337-v2 Implications of transition from 1300 to 650 MHz for CW linac Vyacheslav P. Yakovlev et al. Linac
04 Jan 2010
577-v1 HINS PLC Documentation Dave McDowell et al. HINS
22 Dec 2009
336-v1 Beam Lattice Parameters for Recycler Injection using Laser Assisted Stripping David E. Johnson H- Injection
18 Dec 2009
515-v1 ECloud status meeting, Fall-Winter 09 Paul Lebrun Instabilities
Main Injector
17 Dec 2009
524-v1 The SEY Test Stand Robert M. Zwaska Instabilities
Main Injector
17 Dec 2009
335-v1 Design and Engineering Limitations for SSR1 Cavities and Cryomodules Thomas H. Nicol Presentations
LE Linac
16 Dec 2009
520-v1 HINS 2.5 MeV Beam Operations and Commissioning Documents Jim Steimel et al. HINS
16 Dec 2009
578-v1 HINS RFQ Heating Estimates Bob Webber HINS
10 Dec 2009
334-v1 Project X Linac: Beam Preparation and Distribution Iouri Terechkine et al. Presentations
LE Linac
09 Dec 2009
523-v1 Rapid Cycling Synchrotron Option for Project X Weiren Chou Unassigned
07 Dec 2009
522-v1 Project X and a Muon Facility at Fermilab Milorad B. Popovic Unassigned
07 Dec 2009
521-v1 Magnetically confined electron columns and high-energy hadron beams Giulio Stancari Unassigned
04 Dec 2009
330-v1 SPL Meeting impressions Vyacheslav P. Yakovlev Presentations
Linac
25 Nov 2009
329-v1 ICD-2: Next Step in the Process Valeri A Lebedev H- Injection
RCS
Main Injector
25 Nov 2009
518-v1 HINS Shielding/Dose Calculation with Shielding Cracks Nikolai Mokhov HINS
19 Nov 2009
517-v1 Magnetometer Possibilities Cheng-Yang Tan Unassigned
19 Nov 2009
510-v1 HINS 325 MHz Cavity Test Cave 3D Model David Peterson et al. HINS
18 Nov 2009
327-v1 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
05 Nov 2009
257-v4 Status of the MI rf R&D effort Joseph E Dey MI RF
Main Injector
28 Oct 2009
321-v1 Lattice/Document Repository for Injection Collaboration Alexandr Drozhdin et al. Other Labs
RCS
Simulations
15 Oct 2009
324-v1 Microphonics considerations on the generator power for Project X Julien Branlard LLRF
15 Oct 2009
516-v1 Microphonics considerations on the generator power for Project X Julien Branlard LLRF
14 Oct 2009
323-v1 ICD-2 Linac update Nikolay A. Solyak Linac
13 Oct 2009
320-v1 ICD-2 chopper requirements and proposal #1 Sergei Nagaitsev Linac
08 Oct 2009
319-v1 LBNL proposal for RFQ and chopper John Staples Linac
07 Oct 2009
318-v1 ICD-2 chopper requirements Sergei Nagaitsev Ion Source
07 Oct 2009
255-v5 Foil heating and cooling, Injection beam dump Alexandr Drozhdin et al. Transfer Line
06 Oct 2009
315-v1 ICD-II Update Valeri A Lebedev Linac
RCS
30 Sep 2009
514-v1 Ecloud Energy Distribution Cheng-Yang Tan Unassigned
24 Sep 2009
513-v1 HINS - LLRF Julien Branlard LLRF
HINS
23 Sep 2009
311-v1 RCS Power Supplies Dan Wolff RCS
22 Sep 2009
309-v1 Preliminary estimations of laser stripping for project x ICD-2 Slava Danilov RCS
12 Sep 2009
308-v1 SNS Ring injection experience Michael Plum RCS
12 Sep 2009
307-v1 RCS Injection issues Pranab K Saha RCS
12 Sep 2009
278-v2 RFQ Studies John Staples Presentations
Collaboration
LE Linac
12 Sep 2009
306-v1 325 MHz Couplers Timergali Khabiboulline Presentations
Collaboration
LE Linac
12 Sep 2009
305-v1 1.3 GHz Couplers Chris Adolphsen Presentations
HE Linac
Collaboration
12 Sep 2009
304-v1 Triple Spoke Cavities for a CW Linac Peter N Ostroumov Presentations
Collaboration
LE Linac
12 Sep 2009
303-v1 Linac Design: Single Spoke Cavities Vyacheslav P. Yakovlev Presentations
Collaboration
LE Linac
12 Sep 2009
302-v1 Front End Derun Li Presentations
Collaboration
LE Linac
12 Sep 2009
301-v1 Overall Linac Design, 1.3 GHz Cavities Nikolay A. Solyak Presentations
HE Linac
Collaboration
12 Sep 2009
300-v1 RF Working Group Summary Leigh Harwood et al. LLRF
Presentations
HE Linac
Collaboration
LE Linac
12 Sep 2009
299-v1 RCS and Transfer Line WG Summary David E. Johnson et al. Transfer Line
Presentations
RCS
Collaboration
12 Sep 2009
295-v2 Summary Instrumentation & Controls Working Group Willem Blokland Controls
Presentations
Instrumentation
12 Sep 2009
297-v1 Cavities and Cryomodules Working Group Summary Mark Champion SRF
Presentations
12 Sep 2009
298-v2 Cryomodule Development at Fermilab Donald Mitchell SRF
Presentations
12 Sep 2009
294-v2 Linac WG summary Sergei Nagaitsev Presentations
Linac
Collaboration
12 Sep 2009
277-v2 Project X ICD-1 and ICD-2 Overview Sergei Nagaitsev Presentations
Collaboration
12 Sep 2009
293-v1 MI and RR Rings, Wworking Group Report Ioanis Kourbanis Recycler
Main Injector
12 Sep 2009
288-v1 TiN Coating at SLAC Uli Wienands Main Injector
12 Sep 2009
289-v1 Space Charge Simulations at Berkeley Ji Qiang Recycler
Main Injector
12 Sep 2009
290-v2 Cavity Simulations in SLAC Liling Xiao MI RF
12 Sep 2009
264-v3 xTCA for Physics Standards - Progress & Applications Summary for Project X Collaboration Ray Larsen Controls
Presentations
Instrumentation
12 Sep 2009
291-v2 Longitudinal Laser Wire for Project X / HINS John M Byrd Presentations
Instrumentation
12 Sep 2009
292-v1 Cryogenic Working Group Report Arkadiy Klebaner Cryogenics
12 Sep 2009
286-v1 Cryogenic plant for CW operation Dana Arenius Cryogenics
11 Sep 2009
281-v2 MI/RR Space Charge Simulations with Synergia James F Amundson et al. Presentations
Collaboration
Space Charge Effects
Simulations
Main Injector
11 Sep 2009
258-v2 Cryomodule design changes for ICD-2 Arkadiy Klebaner Presentations
11 Sep 2009
285-v1 325 MHz Cryomodule Design Status and Plans Thomas H. Nicol Collaboration
LE Linac
11 Sep 2009
284-v5 RCS High Power RF System John S Reid Presentations
11 Sep 2009
254-v4 Injection simulations into RCS Leonid Vorobiev H- Injection
Simulations
11 Sep 2009
283-v1 Project X ICD-2 Brian E Chase LLRF
11 Sep 2009
282-v1 Project X Control System Jim Patrick Controls
Presentations
11 Sep 2009
270-v3 Linac Design - Chopper Ideas Bob Webber Presentations
Linac
11 Sep 2009
280-v1 MI/RR RIngs. Introduction/Update Ioanis Kourbanis Recycler
Main Injector
11 Sep 2009
279-v1 HINS as a Beam Diagnostics Test Facility Vic E Scarpine Presentations
Instrumentation
11 Sep 2009
274-v1 2 GeV linac RF block diagram, Ralph J. Pasquinelli SRF
11 Sep 2009
275-v1 basis of Linac RF costing Ralph J. Pasquinelli SRF
11 Sep 2009
276-v1 cost estimate for CW linac RF systems Ralph J. Pasquinelli SRF
11 Sep 2009
273-v1 RCS for Project-X Valeri A Lebedev Presentations
Space Charge Effects
11 Sep 2009
272-v1 Electron Cloud Experimental Upgrade in the Main Injector Cheng-Yang Tan et al. Instabilities
Main Injector
11 Sep 2009
271-v1 Project X Physics Program Review Bob Tschirhart Presentations
Collaboration
11 Sep 2009
262-v1 Fermi Timing Systems and Project X Gregory L. Vogel Controls
Presentations
Instrumentation
10 Sep 2009
266-v1 Bunch Shape Monitor for HINS Wai-Ming Tam Presentations
Instrumentation
10 Sep 2009
268-v1 E-Beam Scanner R&D Randy M Thurman-Keup Presentations
Instrumentation
10 Sep 2009
265-v1 Experience on SNS Beam Instrumentation Collaborations Willem Blokland Controls
Presentations
Instrumentation
10 Sep 2009
263-v1 Collaboration Opportunities on Project X Beam Instrumentation Manfred Wendt Presentations
Instrumentation
10 Sep 2009
256-v1 Status of Microwave Measurements in the Main Injector Nathan Eddy Instrumentation
Main Injector
10 Sep 2009
253-v3 Review Transfer/Injection R&D Plan – Siting Issues David E. Johnson Transfer Line
Presentations
Collaboration
10 Sep 2009
269-v1 Status of Ecloud Build-Up Simulations for the FNAL MI- Sept. 2009 Miguel A Furman Instabilities
Main Injector
10 Sep 2009
267-v1 Titanium Nitride Magnetron Sputtering Linda Valerio Main Injector
10 Sep 2009
261-v1 Design Considerations for CW SRF Linacs Arkadiy Klebaner et al. Presentations
Cryogenics
10 Sep 2009
259-v1 Project X ICD-2 Cryogenic System Overview Jay C. Theilacker Presentations
Cryogenics
10 Sep 2009
260-v1 Superconduction accelerator segmentation overview Arkadiy Klebaner Cryogenics
10 Sep 2009
250-v5 Project X: Introduction, Strategy, and Collaboration Meeting Goals Steve Holmes Presentations
10 Sep 2009
251-v1 Project X ICD-1 Cryogenics and associated RD&D Plan Overview Arkadiy Klebaner Presentations
Cryogenics
10 Sep 2009
252-v1 J-PARC RCS Injection Issues Pranab K Saha Other Labs
Presentations
H- Injection
Absorbers
Collaboration
10 Sep 2009
249-v1 Deflecting Cavity for the Beam RF Splitter Vyacheslav P. Yakovlev SRF
Transfer Line
Presentations
01 Sep 2009
248-v1 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
31 Aug 2009
236-v4 September 2009 Collaboration Meeting Plan Steve Holmes Collaboration
30 Aug 2009
512-v1 HINS RoadMap August 2009 Bob Webber HINS
28 Aug 2009
511-v1 Theory and Practice of Cavity RF Test Systems Tom Powers Unassigned
24 Aug 2009
247-v1 Project X ICD2 briefing Sergei Nagaitsev Presentations
21 Aug 2009
508-v1 HINS 325 MHz Cavity Test Cave Documentation Rick Bossert et al. Controls
HINS
23 Jul 2009
509-v1 HINS LLRF Update Brian E Chase HINS
21 Jul 2009
235-v1 CW linac cavity count (16 MeV/m for ILC cavities) Nikolay A. Solyak Linac
15 Jul 2009
234-v1 Cavity rf power vs. detuning Warren Schappert SRF
15 Jul 2009
233-v1 Experience with microphonics in CC2 at Fermilab Yuriy Pischalnikov LLRF
15 Jul 2009
232-v2 Discussion on cw linac rf power issues Brian E Chase SRF
LLRF
14 Jul 2009
580-v1 HINS MS6 East regulator Installation Maurice Ball HINS
09 Jul 2009
227-v1 HINS Status Report for June 19, 2009 Project X Meeting Bob Webber Presentations
HINS
19 Jun 2009
226-v1 Project X ICD Siting Analysis Summary Presentation David E. Johnson et al. Conventional Facilities
19 Jun 2009
222-v1 ACD cw low-energy linac Vyacheslav P. Yakovlev LE Linac
17 Jun 2009
221-v1 ACD proton front end Sergei Nagaitsev Presentations
LE Linac
17 Jun 2009
218-v2 Project X: A multi-MW Proton Source at Fermilab Steve Holmes Presentations
14 Jun 2009
220-v1 CW linac structure and break points between different accelerating structures Nikolay A. Solyak Linac
HINS
12 Jun 2009
507-v1 HINS LCW System Flow Distribution Maurice Ball HINS
08 Jun 2009
215-v2 Alternative Design Concept for Project-X 8 GeV complex Valeri A Lebedev et al. Basis of Estimate
Instabilities
Instrumentation
07 Jun 2009
216-v1 Project-X ACD write-up Valeri A Lebedev Basis of Estimate
Presentations
02 Jun 2009
505-v1 A Hybrid Design of Project-X Weiren Chou Unassigned
21 May 2009
506-v1 A Simple Transition-free Lattice of an 8 GeV Proton Synchrotron Weiren Chou Unassigned
21 May 2009
504-v1 Trapped Modes for Measuring Ecloud Cheng-Yang Tan Unassigned
20 May 2009
214-v1 Project X FY09 R&D Plan for Transport and Injection David E. Johnson Transfer Line
H- Injection
18 May 2009
211-v2 Project X at Fermilab: Prospects and Plans Steve Holmes Presentations
08 May 2009
21-v1 High Energy Linac Overview Sergei Nagaitsev Presentations
HE Linac
23 Apr 2009
108-v1 Beam physics, linac lattice Peter N Ostroumov Presentations
Linac
23 Apr 2009
137-v1 Fermilab proposal for the PrX Linac RF distribution Oleg Nezhevenko Presentations
Linac
23 Apr 2009
138-v1 CERN interests/views Roland Garoby Presentations
Linac
23 Apr 2009
139-v1 LLRF and other activities (LBNL) Lawrence Doolittle Presentations
Linac
23 Apr 2009
98-v1 Present details of transfer line and injection ICD David E. Johnson Recycler
Presentations
23 Apr 2009
99-v1 Recycler Lattice Meiqin Xiao Recycler
Presentations
23 Apr 2009
100-v1 Transverse phase space painting Alexandr Drozhdin et al. Recycler
Presentations
23 Apr 2009
101-v1 Laser stripping Robert M. Zwaska Presentations
H- Injection
23 Apr 2009
102-v1 Injection absorber design Igor L Rakhno et al. Presentations
H- Injection
23 Apr 2009
103-v1 Footprint and Siting Issues David E. Johnson Recycler
Presentations
23 Apr 2009
104-v1 PS2 Injection: thoughts and concerns Brennan Goddard Recycler
Presentations
23 Apr 2009
88-v1 Px Overview/Goals of working grp/elliptical cav. Robert D Kephart SRF
Presentations
23 Apr 2009
89-v1 FNAL program and ANL/FNAL infrastructure Shekar Mishra SRF
Presentations
23 Apr 2009
112-v1 Superconducting Accelerator Segmentation Overview Jay C. Theilacker Presentations
Cryogenics
23 Apr 2009
474-v1 HINS RFQ_layout Elmie Peoples HINS
17 Apr 2009
503-v1 Power Coupler Testing at Meson Detector Building Elmie Peoples Unassigned
17 Apr 2009
207-v1 Project X ICD Evolution and ACD Sergei Nagaitsev Directors Reviews
30 Mar 2009
206-v1 Vector Modulators Performance Spec, Status, R&D Plan Giorgio Apolinari Directors Reviews
LE Linac
30 Mar 2009
195-v3 Low Level RF - Director's Cost Review Brian E Chase Basis of Estimate
LLRF
Directors Reviews
30 Mar 2009
197-v3 Instrumentation Overview - Director's Cost Review Manfred Wendt Basis of Estimate
Directors Reviews
Instrumentation
30 Mar 2009
198-v2 Beam Instrumentation Systems - Director's Cost Review Manfred Wendt Basis of Estimate
Directors Reviews
Instrumentation
30 Mar 2009
166-v3 Item 1.10 - BoE for CD-0 Director's Cost Review David E. Johnson Basis of Estimate
Transfer Line
Directors Reviews
H- Injection
13 Mar 2009
153-v0 Item 1.1 - BoE for CD-0 Director's Cost Review Steve Holmes et al. Basis of Estimate
Directors Reviews
Project Management
04 Mar 2009
162-v1 Item 1.5 - BoE for CD-0 Director's Cost Review Manfred Wendt Basis of Estimate
Directors Reviews
Instrumentation
04 Mar 2009
157-v1 Item 1.3.1 to 1.3.2 - BoE for CD-0 Director's Cost Review Mark Champion et al. Basis of Estimate
SRF
Directors Reviews
HE Linac
LE Linac
04 Mar 2009
165-v0 Item 1.9 - BoE for CD-0 Director's Cost Review Russ Alber Basis of Estimate
Directors Reviews
Conventional Facilities
04 Mar 2009
164-v0 Item 1.7 - BoE for CD-0 Director's Cost Review Arkadiy Klebaner Basis of Estimate
Directors Reviews
Cryogenics
04 Mar 2009
163-v0 Item 1.6 - BoE for CD-0 Director's Cost Review Jim Patrick Basis of Estimate
Controls
Directors Reviews
04 Mar 2009
161-v0 Item 1.4.7 - BoE for CD-0 Director's Cost Review Paul Derwent Recycler
Basis of Estimate
Directors Reviews
04 Mar 2009
160-v0 Item 1.4.6 - BoE for CD-0 Director's Cost Review Ioanis Kourbanis Basis of Estimate
Directors Reviews
Main Injector
04 Mar 2009
158-v0 Item 1.3.4 - BoE for CD-0 Director's Cost Review John S Reid Basis of Estimate
SRF
Directors Reviews
HE Linac
04 Mar 2009
156-v0 Item 1.2.9 & 1.3.5 - BoE for CD-0 Director's Cost Review Brian E Chase Basis of Estimate
Directors Reviews
HE Linac
LE Linac
04 Mar 2009
155-v0 Item 1.2.8 - BoE for CD-0 Director's Cost Review Ralph J. Pasquinelli Basis of Estimate
Directors Reviews
LE Linac
04 Mar 2009
154-v0 Item 1.2.1 to 1.2.7 - BoE for CD-0 Director's Cost Review Bob Webber Basis of Estimate
Directors Reviews
LE Linac
04 Mar 2009
83-v2 Initial Configuration Document v1.1 Russ Alber et al. Transfer Line
Controls
Conventional Facilities
Instabilities
HE Linac
Instrumentation
HINS
Cryogenics
H- Injection
Project Management
Absorbers
Space Charge Effects
Reports
LE Linac
Main Injector
16 Mar 2009
181-v2 Project X Directors Review - Controls Jim Patrick Basis of Estimate
Controls
Directors Reviews
Presentations
16 Mar 2009
202-v1 RF Interlocks - Director's Cost Review Peter Prieto Basis of Estimate
SRF
Directors Reviews
16 Mar 2009
201-v1 Vector Modulators - Director's Cost Review Oleg Nezhevenko Basis of Estimate
SRF
Directors Reviews
16 Mar 2009
200-v1 325MHz & 1300MHz RF Systems - Director's Cost Review John S Reid Basis of Estimate
SRF
Directors Reviews
16 Mar 2009
199-v1 RF Systems Overview - Director's Cost Review John S Reid Basis of Estimate
SRF
Directors Reviews
16 Mar 2009
196-v1 LE Linac - Director's Cost Review Giorgio Apolinari Basis of Estimate
Directors Reviews
LE Linac
15 Mar 2009
194-v1 HE Linac Cryomodules - Director's Cost Review Jim Kerby Basis of Estimate
Directors Reviews
HE Linac
15 Mar 2009
193-v1 Modulators and Charging Power Supplies - Director's Cost Review Chris Jensen et al. Basis of Estimate
SRF
Directors Reviews
15 Mar 2009
190-v1 PX Dir Review 8 GeV Transport Line Components David E. Johnson Basis of Estimate
Transfer Line
Directors Reviews
Presentations
15 Mar 2009
189-v1 PX Dir Review 8 GeV Injection Components David E. Johnson Basis of Estimate
Directors Reviews
Presentations
H- Injection
15 Mar 2009
188-v2 Project Management Overview - Director's Review Steve Holmes Directors Reviews
Presentations
15 Mar 2009
191-v1 Project X Systems and Interfaces - Director's Cost Review Sergei Nagaitsev Basis of Estimate
Directors Reviews
15 Mar 2009
175-v2 PX Dir Review 8 GeV level 2 Overview David E. Johnson Transfer Line
Directors Reviews
Presentations
H- Injection
15 Mar 2009
187-v1 Cost Estimate Methodology - CD-0 Cost Review Jim Kerby Basis of Estimate
Directors Reviews
13 Mar 2009
186-v1 Low Energy Linac Cost Estimate - CD-0 Cost Review Thomas H. Nicol Basis of Estimate
Directors Reviews
LE Linac
13 Mar 2009
180-v1 PX_MI_RR_directors_review Ioanis Kourbanis Basis of Estimate
Directors Reviews
Main Injector
13 Mar 2009
176-v2 Introduction and Overview - Director's Cost Review Steve Holmes Directors Reviews
Presentations
13 Mar 2009
172-v2 PX Director's review March 09 Cryo Presentation Arkadiy Klebaner Basis of Estimate
Directors Reviews
Cryogenics
13 Mar 2009
169-v3 Civil - CD-0 Talk 031609 Russ Alber Basis of Estimate
Directors Reviews
Conventional Facilities
13 Mar 2009
185-v1 Escalation Rates for CD-0 Cost Estimate Jim Kerby Basis of Estimate
Directors Reviews
13 Mar 2009
184-v1 FY09 Burden Rates Jim Kerby Basis of Estimate
Directors Reviews
13 Mar 2009
183-v1 Actions Authorized by CD-0 Jim Kerby Basis of Estimate
Directors Reviews
13 Mar 2009
182-v1 PX Labor Categories Jim Kerby Basis of Estimate
Directors Reviews
13 Mar 2009
174-v1 Main Injector and Recycler RF Joseph E Dey Recycler
Basis of Estimate
Directors Reviews
Main Injector
13 Mar 2009
178-v1 Project X: Initial Configuration Paul Derwent Recycler
Transfer Line
Controls
Directors Reviews
Conventional Facilities
Presentations
Linac
Instrumentation
HINS
Cryogenics
Main Injector
13 Mar 2009
170-v3 ES&H for Project X Nancy Grossman Project Management
13 Mar 2009
150-v3 Project X CD-0 Schedule Ken Domann et al. Directors Reviews
13 Mar 2009
173-v1 PX Linac Layout slide March 2009 Paul Derwent Linac
12 Mar 2009
149-v2 RD&D Plan from ICD Russ Alber et al. Recycler
Transfer Line
Controls
Conventional Facilities
Linac
Instrumentation
HINS
Cryogenics
H- Injection
Reports
Main Injector
11 Mar 2009
151-v3 Resource Spreadsheets - CD-0 Schedule Jim Kerby Directors Reviews
11 Mar 2009
581-v1 DESIGN STATUS OF THE FNAL 8 GeV SC LINAC AS OF 04-MARCH-09. Jean-Paul Carneiro Unassigned
04 Mar 2009
152-v1 CD-0 Director's Review of Cost - presentation template Steve Holmes Directors Reviews
03 Mar 2009
502-v1 RFA Electronics Cheng-Yang Tan Unassigned
25 Feb 2009
148-v1 Linac WG Report Sergei Nagaitsev Linac
Reports
24 Feb 2009
134-v1 Transfer Line & Injection WG Report David E. Johnson et al. Transfer Line
Reports
24 Feb 2009
133-v1 SRF Report Giorgio Apolinari et al. SRF
Reports
24 Feb 2009
132-v1 Main Injector Working Group Report Ioanis Kourbanis et al. Reports
Main Injector
24 Feb 2009
130-v1 Cryo Working Group Summary Dana Arenius et al. Cryogenics
Reports
24 Feb 2009
131-v1 Instrumentation WG Report Willem Blokland et al. Instrumentation
Reports
24 Feb 2009
129-v1 JLab interests and capabilities Andrew Hutton SRF
Presentations
24 Feb 2009
147-v1 PrX SC quads/solenoids Michael A Tartaglia Presentations
Linac
24 Feb 2009
128-v1 SLAC interest in Px RF equipment (dist, klystrons, modulators), RF R&D needed Chris Adolphsen Presentations
Linac
24 Feb 2009
127-v1 HINS Solenoids Head Load Thomas M. Page Presentations
Cryogenics
24 Feb 2009
126-v1 NML Cryogenic System Overview Alexander Martinez Presentations
Cryogenics
24 Feb 2009
125-v1 The 1.3 GHzCryomodule Heat Load Thomas J. Peterson Presentations
Cryogenics
24 Feb 2009
124-v1 MI Collimation experience Bruce C. Brown Presentations
Main Injector
24 Feb 2009
123-v1 Review of MI e-cloud simulations Miguel A Furman Presentations
Main Injector
24 Feb 2009
122-v1 MI e-cloud measurements Robert M. Zwaska Presentations
Main Injector
24 Feb 2009
121-v1 How to design/build top loaded cryostats Joel D. Fuerst Presentations
Cryogenics
24 Feb 2009
120-v1 Cornell interests and capabilities Maury Tigner Presentations
Linac
24 Feb 2009
119-v1 SLAC proposals for PrX (1.3) couplers Chris Adolphsen Presentations
Linac
24 Feb 2009
140-v1 PrX coupler requirements Nikolay A. Solyak et al. Presentations
Linac
24 Feb 2009
118-v1 ANL interests and capabilities (spokes + ellipticals) Michael P. Kelly SRF
Presentations
24 Feb 2009
117-v1 Intro to PrX front end/Low Beta Cavities Bob Webber Presentations
LE Linac
24 Feb 2009
116-v1 Linac lattice requirements on cryomodules Peter N Ostroumov Conventional Facilities
Presentations
Linac
24 Feb 2009
115-v1 Present initial draft of RD&D plan David E. Johnson Recycler
Presentations
24 Feb 2009
114-v1 Present current R&D issues David E. Johnson Recycler
Presentations
24 Feb 2009
113-v1 SRF Pressure Safety at Fermilab Thomas H. Nicol SRF
Presentations
Cryogenics
24 Feb 2009
111-v1 Potential Cryogenic Cycles Dana Arenius Conventional Facilities
Presentations
24 Feb 2009
110-v1 Project X Cryogenic System Overview Arkadiy Klebaner Presentations
Cryogenics
24 Feb 2009
109-v1 Presentation of possible Project X Beam Instrumentation R&D projects Vic E Scarpine et al. Presentations
Instrumentation
24 Feb 2009
92-v1 India interest in beta = 0.8 CM and capabilities V. Sahni SRF
Presentations
24 Feb 2009
91-v1 India interest in Spoke resonators A. Roy SRF
Presentations
24 Feb 2009
107-v1 Experience with the RHIC yt-jump system Thomas Roser Presentations
Main Injector
24 Feb 2009
105-v1 Review of MI Issues Ioanis Kourbanis Presentations
Main Injector
24 Feb 2009
106-v1 New rf system requirements/preliminary design John S Reid Presentations
Main Injector
24 Feb 2009
582-v1 Analysis of RFQ Vacuum System for HINS Tests at MDB Henryk Piekarz HINS
18 Feb 2009
501-v1 High Gain 3kHz LPF for RFA Cheng-Yang Tan Unassigned
28 Jan 2009
143-v1 Accelerator Issues of Project X 8/7/2007 Dave McGinnis Presentations
Linac
Reports
28 Jan 2009
583-v1 Estimate of RF Cavity X-rays in the HINS Linac Enclosure and Shielding Required Bob Webber HINS
27 Jan 2009
500-v1 Microwave Electron Cloud Measurements in the Main Injector James L. Crisp et al. Instrumentation
13 Jan 2009
563-v1 HINS Linac Baseline Design Documents Bob Webber HINS
30 Dec 2008
499-v1 Preliminary Measurements of RFA and Beam Measurements Cheng-Yang Tan Unassigned
23 Dec 2008
90-v1 MSU on Beta = 0.8 R&D so far, what is needed, and interests Richard York SRF
Presentations
17 Dec 2008
136-v1 Lattice files for Project X Injection and Painting David E. Johnson H- Injection
Simulations
10 Dec 2008
498-v1 H- stripping in TESLA cavity @ 8GeV Nikolay A. Solyak Unassigned
08 Dec 2008
497-v1 Measurements of Electron Cloud Density by Microwave Transmission Manfred Wendt Instabilities
Instrumentation
Main Injector
08 Dec 2008
97-v1 A Personal View of Beam Instrumentation Collaborations Manfred Wendt Presentations
Instrumentation
02 Dec 2008
95-v2 Overview of SNS Beam Instrumentation (Incl. Collaboration Aspects) Willem Blokland Presentations
Instrumentation
02 Dec 2008
96-v1 HINS Beam Instrumentation R&D Vic E Scarpine Presentations
Instrumentation
02 Dec 2008
94-v1 Project X Initial Configuration Overview Paul Derwent Presentations
02 Dec 2008
93-v1 Project X Introduction, Strategy, and Collaboration Goals Steve Holmes Presentations
02 Dec 2008
84-v2 XYZ Valeri A Lebedev et al. Presentations
25 Nov 2008
496-v1 Injection painting for Project-X Alexandr Drozhdin et al. Recycler
20 Nov 2008
495-v1 HINS RF distribution test block diagram Ralph J. Pasquinelli HINS
19 Nov 2008
87-v1 Project X Presentation to Linear Collider Workshop 11-16-08 Steve Holmes Presentations
17 Nov 2008
86-v1 Project X Talk to HEPAP 11-13-08 Steve Holmes Presentations
14 Nov 2008
537-v1 Conceptual Design Report of 8GeV H- Transport and Injection David E. Johnson Unassigned
14 Nov 2008
82-v1 AP&T Seminar 30 Oct 08 on the ICD Paul Derwent Presentations
Project Management
30 Oct 2008
17-v2 A Staged Approach to a High Intensity Proton Source Dave McGinnis Reports
15 Oct 2008
71-v1 MI Injection Energy Valeri A Lebedev Instabilities
HE Linac
Absorbers
Space Charge Effects
08 Oct 2008
79-v1 Accelerator Issues of Project X Dave McGinnis Reports
Reviews
07 Oct 2008
78-v1 120 GeV Targeting James Hylen Presentations
Targetting
Reviews
07 Oct 2008
77-v1 Recycler 8.9 GeV/c Extraction David E. Johnson Recycler
Presentations
Reviews
07 Oct 2008
76-v1 Project X Main Injector Valeri A Lebedev Presentations
Reviews
Main Injector
07 Oct 2008
75-v1 Project-X Related Issues in Recycler Alexander A Valishev Recycler
Presentations
Reviews
07 Oct 2008
74-v1 Project X: 8 GeV Recycler Injection David E. Johnson Presentations
H- Injection
Reviews
07 Oct 2008
73-v1 Project X Linac Giorgio Apolinari Presentations
Linac
Reviews
07 Oct 2008
72-v1 Project X Overview Dave McGinnis Presentations
Reviews
07 Oct 2008
494-v1 AN 8 GEV CW LINAC WITH HIGH POTENTIAL BEAM POWER Chuck Ankenbrandt et al. Unassigned
07 Oct 2008
70-v1 120 GeV Target Summary – Workshop # 1 Mike Martens et al. Targetting
02 Oct 2008
69-v1 Summary--High Energy Linac Issues Chris Adolphsen HE Linac
02 Oct 2008
68-v1 Summary--Low Energy Linac Component and System Designs Peter N Ostroumov et al. LE Linac
02 Oct 2008
67-v1 Issues and Challenges of High Power Targets for Muon Colliders Kirk T McDonald Presentations
Targetting
01 Oct 2008
66-v1 Experimental Radiation Damage Assessment of High Power Accelerator Targets Nikolaos Simos Presentations
Targetting
01 Oct 2008
65-v1 Issues with Liquid vs. Solid Targets John C Sheppard Presentations
Targetting
01 Oct 2008
64-v1 IHEP 2 Megawatt Target Design James Hylen Presentations
Targetting
01 Oct 2008
63-v1 High Power Targets for Project X and Beyond Kirk T McDonald Presentations
Targetting
01 Oct 2008
62-v1 Activation and Remote Handling John C Sheppard Presentations
Targetting
01 Oct 2008
61-v1 Engineering Issues for the NuMI Beamline at 2 MW Patrick G Hurh Presentations
Targetting
01 Oct 2008
60-v1 Modeling of Ring Performance Robert D Ryne Recycler
Presentations
Simulations
Main Injector
01 Oct 2008
59-v1 Injection and Extraction David E. Johnson Recycler
Transfer Line
Presentations
Main Injector
01 Oct 2008
58-v1 Transverse Damper Phil Adamson Recycler
Presentations
Instabilities
Main Injector
01 Oct 2008
57-v1 RF System and Beam Loading Compensation John S Reid Recycler
Presentations
Main Injector
01 Oct 2008
56-v1 Transition Crossing Simulations Ioanis Kourbanis Presentations
Simulations
Main Injector
01 Oct 2008
55-v1 Gamma Transition Jump Weiren Chou et al. Presentations
Main Injector
01 Oct 2008
54-v1 Present MI Operation and Near Future Plans Ioanis Kourbanis Operations
Presentations
Main Injector
01 Oct 2008
53-v1 SNS Laser Stripping Development Aleksandrov V Aleksandrov Other Labs
Presentations
H- Injection
01 Oct 2008
52-v1 Transfer lines, H- stripping and injection Deepak Raparia Transfer Line
Presentations
H- Injection
01 Oct 2008
51-v1 Present RR operation Consolato Gattuso Recycler
Operations
Presentations
01 Oct 2008
50-v1 Beam Loss and Collimation Nikolai Mokhov Presentations
Absorbers
Main Injector
01 Oct 2008
49-v1 Electron Cloud, EP Instability and Requirements for Vacuum Miguel A Furman Recycler
Presentations
Instabilities
Main Injector
01 Oct 2008
48-v1 Theoretical Expectations for Instabilities Alexey V Burov Recycler
Presentations
Instabilities
Main Injector
01 Oct 2008
47-v1 Experimental Observations of Instabilities at Main Injector Ioanis Kourbanis Presentations
Instabilities
Main Injector
01 Oct 2008
46-v1 SNS Ring Beam Status Slava Danilov Other Labs
Main Injector
01 Oct 2008
45-v1 Linac Instrumentation Nathan Eddy Presentations
Linac
Instrumentation
01 Oct 2008
44-v1 Electron source at a 2-GeV location Philippe Piot Presentations
Linac
01 Oct 2008
43-v1 MSU Collaboration Report - Beta 0.8 Cavities Walter Hartung Other Labs
Presentations
Linac
01 Oct 2008
42-v1 Automated Linac Re-tuning John D Galambos Presentations
Linac
01 Oct 2008
41-v1 PrX Civil Construction and Layout Dixon Bogert Conventional Facilities
Presentations
Linac
01 Oct 2008
40-v1 Cryo Systems Needed for Project X Arkadiy Klebaner Presentations
Linac
Cryogenics
01 Oct 2008
39-v1 Berkeley Collaboration Report - Buncher Cavities and LLRF Alessandro Ratti Other Labs
Presentations
LE Linac
01 Oct 2008
38-v1 Brookhaven Collaboration Report - Instrumentation Roger Connolly Other Labs
Presentations
Instrumentation
LE Linac
01 Oct 2008
37-v1 Argonne Collaboration Report - Accelerator Physics and Spoke Cavities Donald F Geesaman Other Labs
Presentations
LE Linac
01 Oct 2008
36-v1 History of SNS Design and Decisions Robert L Kustom Other Labs
Presentations
LE Linac
01 Oct 2008
35-v1 LLRF Challenges Brian E Chase Presentations
HE Linac
01 Oct 2008
34-v1 RF Distribution for Project X Christopher Nantista Presentations
HE Linac
01 Oct 2008
33-v1 Project X and ILC: Differences and Similarities Chris Adolphsen Presentations
HE Linac
01 Oct 2008
31-v1 SC Spoke Cavity Design and Status Timergali Khabiboulline Presentations
LE Linac
01 Oct 2008
32-v1 Superconducting Solenoid Design Iouri Terechkine Presentations
LE Linac
01 Oct 2008
30-v1 Room Temperature Cavity Design Gennady Romanov Presentations
LE Linac
30 Sep 2008
29-v1 325 MHz RF Distribution Alfred Moretti Presentations
LE Linac
30 Sep 2008
28-v1 SNS Superconducting Linac operating experience and issues Isidoro E Campisi Other Labs
Presentations
Linac
30 Sep 2008
27-v1 What It Will Take to Produce 1 Cryomodule per Month Robert D Kephart Presentations
Cryogenics
30 Sep 2008
26-v1 Linac Simulation Results and Issues Jean-Paul Carneiro Linac
Simulations
30 Sep 2008
25-v1 Linac Beam Physics Design and Special Requirements of H- vs e Peter N Ostroumov Linac
H- Injection
30 Sep 2008
24-v1 120 GeV Targeting Overview James Hylen Presentations
Targetting
30 Sep 2008
23-v1 Main Injector Overview Valeri A Lebedev Presentations
Main Injector
30 Sep 2008
22-v1 Recycler Overview Alexander A Valishev Recycler
Presentations
30 Sep 2008
20-v1 Low Energy Linac Overview Bob Webber Presentations
LE Linac
30 Sep 2008
19-v1 Project X Overview Dave McGinnis Presentations
30 Sep 2008
18-v1 Introductory Remarks Steve Holmes Presentations
30 Sep 2008
493-v1 ORBIT ECloud and Injection Painting Update Leonid Vorobiev Unassigned
16 Sep 2008
5-v1 Project X ICD: High-energy linac parameters Sergei Nagaitsev Controls
Conventional Facilities
Linac
Cryogenics
H- Injection
Main Injector
29 Aug 2008
4-v1 Project X Linac Front-end Thoughts and Facts Bob Webber Linac
28 Aug 2008
491-v1 Compare proton vs H- Multiturn Injection David E. Johnson Unassigned
15 Aug 2008
490-v1 A First Look at H- Stripping for Project X Robert M. Zwaska Unassigned
12 Aug 2008
489-v1 Painting modeling using ORBIT for Project-X Leonid Vorobiev Unassigned
12 Aug 2008
488-v1 Space Charge Compensation by electron columns Vladimir Shiltsev Unassigned
08 Aug 2008
487-v1 Electron Cloud Results from ILCDR08 Robert M. Zwaska Unassigned
22 Jul 2008
486-v1 RFA Design Cheng-Yang Tan Unassigned
22 Jul 2008
571-v1 Autosave at HINS Sharon L. Lackey HINS
21 Jul 2008
485-v1 Geometry Considerations for the Project X Injection Absorber David E. Johnson Unassigned
07 Jul 2008
484-v1 Simulations of Various RFAs for Future Designs Cheng-Yang Tan Unassigned
03 Jul 2008
478-v1 Project X FY08 Resource Requirements & Agreement Elaine McCluskey Unassigned
30 Jun 2008
483-v1 Project X Transport & Injection: Foil and Laser Stripping R&D Kick-off Meeting David E. Johnson Unassigned
30 Jun 2008
482-v1 Project X Transport & Injection: Injection Painting R&D Kick-off Meeting David E. Johnson Unassigned
27 Jun 2008
480-v1 Project X Absorber and Collimation RnD kick-off Meeting David E. Johnson Unassigned
20 Jun 2008
570-v1 Saving and Restoring Epics devices at HINS and HTS Sharon L. Lackey Controls
HINS
17 Jun 2008
479-v1 HINS with 8 ILC-units at 31.5 MV/m : Acceleration of H- (15 mA) and e- (1 nC) Jean-Paul Carneiro HINS
12 Jun 2008
569-v1 HINS Alarms Sharon L. Lackey Controls
HINS
07 Jun 2008
477-v1 HINS SULFUR HEXAFLUORIDE SYSTEM POLICIES AND PROCEDURES Robyn L. Madrak HINS
15 May 2008
568-v1 DESIGN STATUS OF THE FNAL PROTON DRIVER AS OF 15-MAY-08. Jean-Paul Carneiro Proton Driver
15 May 2008
476-v1 Preliminary RFA Design Cheng-Yang Tan Unassigned
06 May 2008
475-v1 HINS Talk to AD Controls Dept - April 2008 Bob Webber Controls
HINS
29 Apr 2008
473-v1 Project X and the Future of the Fermilab Accelerator Complex Steve Holmes Unassigned
23 Apr 2008
472-v1 Test of New Stripping Foils in the Booster Weiren Chou et al. Operations
31 Mar 2008
471-v1 H- Ion Source Spec for HINS and Considerations for Project X H- Ion Source Charles W. Schmidt et al. HINS
Ion Source
19 Mar 2008
470-v1 Project X WBS Elaine McCluskey Unassigned
17 Mar 2008
469-v1 Survey of RFAs (Retarding Field Analysers) Cheng-Yang Tan Unassigned
26 Feb 2008
468-v1 A New Vision for Evolution of Controls Charles Briegel et al. Controls
21 Feb 2008
467-v1 HINS Presentation to AD Instrumentation Department 2/20/2008 Bob Webber Instrumentation
HINS
20 Feb 2008
466-v1 Generic VME Digitizer , 12 Channel, 16bit, 10 MHz, by the AD Instrumentation Dep Tom Meyer et al. Hardware
Instrumentation
08 Feb 2008
465-v1 Project X feedback infrastructure requirements Jim Patrick Controls
30 Jan 2008
455-v1 Draft Requirements for Ctrl-X Application Infrastructure Denise S. Finstrom et al. Controls
30 Jan 2008
464-v1 Project X Network Requirements Dan Stenman Unassigned
10 Jan 2008
576-v1 Project X Controls Hardware and Operating System Requirements Denise S. Finstrom et al. Unassigned
10 Jan 2008
460-v1 Project X "Low-Level" Requirements Charles Briegel et al. Unassigned
10 Jan 2008
463-v1 Project X Controls Machine Protection System Requirements Linden R. Carmichael et al. Controls
10 Jan 2008
459-v1 Project X Controls High Level Application Requirements Suzanne Gysin et al. Controls
Instrumentation
10 Jan 2008
462-v1 Project X Legacy Controls Interface Requirements Jim Patrick Unassigned
08 Jan 2008
567-v1 Final Report on Design and Test of a 325 MHz Hybrid and Circulator for Fermilab Proton Driver Ding Sun Proton Driver
HINS
28 Dec 2007
458-v1 Report on Accelerator Physics and Technology Workshop for Project X Dave McGinnis Unassigned
26 Dec 2007
561-v1 Testing 325 MHz Cavities in the ILC IB1 Vertical Test System Bob Webber HINS
14 Dec 2007
566-v1 Bandwidth Effects of Superconducting RF Cavity Controlled with a Vector Phase Modulator Dave McGinnis Unassigned
13 Dec 2007
565-v1 A Model for Lorentz Detuning in a Superconducting RF Cavity Controlled with a Vector Phase Modulator Dave McGinnis Unassigned
11 Dec 2007
564-v1 Overview of HINS Operations and Radiation Shielding Considerations in MDB Bob Webber HINS
05 Nov 2007
562-v1 High Power Tests of Novel Fast Phase/Amplitude Modulators for HINS Robyn L. Madrak et al. HINS
01 Nov 2007
559-v1 A Fast Chopper for HINS Robyn L. Madrak HINS
01 Nov 2007
560-v1 A Simple Model for a Superconducting RF cavity with a Vector Phase Modulator Dave McGinnis Unassigned
27 Oct 2007
558-v1 High Power RF Distribution and Control in the HINS Alfred Moretti HINS
11 Oct 2007
557-v1 HINS with 8 ILC-units at 45 mA: jitter studies. Jean-Paul Carneiro HINS
12 Jul 2007
556-v1 Epics Interlock Applications Build & Install instructions Dennis J. Nicklaus Unassigned
11 Jul 2007
555-v1 Using an ILC-Style 8 GeV H- Linac for a Muon to Electron Conversion Experiment Chuck Ankenbrandt et al. Experiments
14 Jun 2007
554-v1 HINS Test Facility RF Fanback Distribution Jim Steimel HINS
31 May 2007
553-v1 HINS with 8 ILC-units at 45 mA : misalignment and jitter studies. Jean-Paul Carneiro HINS
26 Apr 2007
534-v1 High Intensity Proton Source Naming Convention Sharon L. Lackey et al. Controls
18 Apr 2007
552-v1 Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber Proton Driver
16 Apr 2007
551-v1 H- Stripping Equations and Application to the High Intensity Neutrino Source. Jean-Paul Carneiro Unassigned
11 Apr 2007
550-v1 HINS with 8 ILC-units at 45 mA Jean-Paul Carneiro HINS
29 Mar 2007
548-v1 Waveguide Coupler Monitors and RF Interlock Detector Cable Distribution and Attenuation Jim Steimel Unassigned
21 Mar 2007
547-v1 Isolation Verification of HINS Meson Power RF Distribution Components Jim Steimel HINS
21 Mar 2007
546-v1 HINS Presentation to AD Department Heads Bob Webber HINS
16 Mar 2007
532-v1 Benchmarking TRACK and ASTRA for the FNAL High Intensity Proton Source. Jean-Paul Carneiro Unassigned
08 Mar 2007
535-v1 HINS/PD Meson Planning Meeting Minutes Jim Steimel et al. HINS
02 Mar 2007
544-v1 LCW Cooling Analysis Meson HINS-ILCTA Maurice Ball HINS
28 Feb 2007
545-v1 Meson HINS/ILCTA LCW System Block Diagram/ Schematic Maurice Ball HINS
28 Feb 2007
543-v1 TRACK, ASTRA, MAD, ELEGANT and HINS Jean-Paul Carneiro HINS
07 Feb 2007
540-v1 HINS Test Facility at Meson Non-Ionizing Radiation Safety System Jim Steimel HINS
12 Jan 2007
539-v1 survey of H- ion sources for accelerators Jens Peters Ion Source
09 Jan 2007
536-v1 Electron Cloud Instabilities Robert M. Zwaska Instabilities
Main Injector
06 Dec 2006
533-v1 HINS Program Overview for CD Controls Management Meeting Bob Webber Controls
HINS
09 Oct 2006
530-v1 Modifications to Main Injector Lattice to Create Symmetric Straight Section for H- injection David E. Johnson Unassigned
26 Sep 2006
531-v1 Proposed Proton Driver/HINS Beam Operations at Meson Detector Building Bob Webber Proton Driver
HINS
15 Aug 2006
529-v1 ASTRA simulations for FNAL Proton Driver Jean-Paul Carneiro Proton Driver
05 Apr 2006
528-v1 Proton Driver H- transport and injection David E. Johnson Proton Driver
30 Mar 2006
584-v1 SNS visit David E. Johnson Transfer Line
28 Mar 2006
527-v1 Brief Report from the BNL Trip on Feb 14-15, 2006 Henryk Piekarz Ion Source
14 Mar 2006
526-v1 Site visit to Brookhaven National Laboratory Doug Moehs Ion Source
14 Mar 2006
525-v1 RF Ion Source Topics Discussed at DESY Doug Moehs Ion Source
14 Mar 2006

Number of documents found: 1073

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 11 wallclock secs ( 2.09 usr + 0.31 sys = 2.40 CPU)