Project X


9/09 Collaboration Meeting


Project X DocDB Home

Simple document list
(61 extra documents)

Full Title: Collaboration Meeting, September 11-12, 2009
Date & Time: 11 Sep 2009 at 09:00
Event Location: Fermilab

No talks in agenda


Other documents for this event

Project X-doc-# Title Author(s) Topic(s) Last Updated
257-v4 Status of the MI rf R&D effort Joseph E Dey MI RF
Main Injector
28 Oct 2009
255-v5 Foil heating and cooling, Injection beam dump Alexandr Drozhdin et al. Transfer Line
06 Oct 2009
309-v1 Preliminary estimations of laser stripping for project x ICD-2 Slava Danilov RCS
12 Sep 2009
308-v1 SNS Ring injection experience Michael Plum RCS
12 Sep 2009
307-v1 RCS Injection issues Pranab K Saha RCS
12 Sep 2009
278-v2 RFQ Studies John Staples Collaboration
LE Linac
Presentations
12 Sep 2009
306-v1 325 MHz Couplers Timergali Khabiboulline Collaboration
LE Linac
Presentations
12 Sep 2009
305-v1 1.3 GHz Couplers Chris Adolphsen Collaboration
Presentations
HE Linac
12 Sep 2009
304-v1 Triple Spoke Cavities for a CW Linac Peter N Ostroumov Collaboration
LE Linac
Presentations
12 Sep 2009
303-v1 Linac Design: Single Spoke Cavities Vyacheslav P. Yakovlev Collaboration
LE Linac
Presentations
12 Sep 2009
302-v1 Front End Derun Li Collaboration
LE Linac
Presentations
12 Sep 2009
301-v1 Overall Linac Design, 1.3 GHz Cavities Nikolay A. Solyak Collaboration
Presentations
HE Linac
12 Sep 2009
300-v1 RF Working Group Summary Leigh Harwood et al. LLRF
Collaboration
LE Linac
Presentations
HE Linac
12 Sep 2009
299-v1 RCS and Transfer Line WG Summary David E. Johnson et al. Transfer Line
RCS
Collaboration
Presentations
12 Sep 2009
295-v2 Summary Instrumentation & Controls Working Group Willem Blokland Controls
Presentations
Instrumentation
12 Sep 2009
297-v1 Cavities and Cryomodules Working Group Summary Mark Champion SRF
Presentations
12 Sep 2009
298-v2 Cryomodule Development at Fermilab Donald Mitchell SRF
Presentations
12 Sep 2009
294-v2 Linac WG summary Sergei Nagaitsev Collaboration
Presentations
Linac
12 Sep 2009
277-v2 Project X ICD-1 and ICD-2 Overview Sergei Nagaitsev Collaboration
Presentations
12 Sep 2009
293-v1 MI and RR Rings, Wworking Group Report Ioanis Kourbanis Recycler
Main Injector
12 Sep 2009
288-v1 TiN Coating at SLAC Uli Wienands Main Injector
12 Sep 2009
289-v1 Space Charge Simulations at Berkeley Ji Qiang Recycler
Main Injector
12 Sep 2009
290-v2 Cavity Simulations in SLAC Liling Xiao MI RF
12 Sep 2009
264-v3 xTCA for Physics Standards - Progress & Applications Summary for Project X Collaboration Ray Larsen Controls
Presentations
Instrumentation
12 Sep 2009
291-v2 Longitudinal Laser Wire for Project X / HINS John M Byrd Presentations
Instrumentation
12 Sep 2009
292-v1 Cryogenic Working Group Report Arkadiy Klebaner Cryogenics
12 Sep 2009
286-v1 Cryogenic plant for CW operation Dana Arenius Cryogenics
11 Sep 2009
281-v2 MI/RR Space Charge Simulations with Synergia James F Amundson et al. Collaboration
Space Charge Effects
Simulations
Presentations
Main Injector
11 Sep 2009
258-v2 Cryomodule design changes for ICD-2 Arkadiy Klebaner Presentations
11 Sep 2009
285-v1 325 MHz Cryomodule Design Status and Plans Thomas H. Nicol Collaboration
LE Linac
11 Sep 2009
284-v5 RCS High Power RF System John S Reid Presentations
11 Sep 2009
254-v4 Injection simulations into RCS Leonid Vorobiev H- Injection
Simulations
11 Sep 2009
283-v1 Project X ICD-2 Brian E Chase LLRF
11 Sep 2009
282-v1 Project X Control System Jim Patrick Controls
Presentations
11 Sep 2009
270-v3 Linac Design - Chopper Ideas Bob Webber Presentations
Linac
11 Sep 2009
280-v1 MI/RR RIngs. Introduction/Update Ioanis Kourbanis Recycler
Main Injector
11 Sep 2009
279-v1 HINS as a Beam Diagnostics Test Facility Vic E Scarpine Presentations
Instrumentation
11 Sep 2009
274-v1 2 GeV linac RF block diagram, Ralph J. Pasquinelli SRF
11 Sep 2009
275-v1 basis of Linac RF costing Ralph J. Pasquinelli SRF
11 Sep 2009
276-v1 cost estimate for CW linac RF systems Ralph J. Pasquinelli SRF
11 Sep 2009
273-v1 RCS for Project-X Valeri A Lebedev Space Charge Effects
Presentations
11 Sep 2009
272-v1 Electron Cloud Experimental Upgrade in the Main Injector Cheng-Yang Tan et al. Instabilities
Main Injector
11 Sep 2009
271-v1 Project X Physics Program Review Bob Tschirhart Collaboration
Presentations
11 Sep 2009
262-v1 Fermi Timing Systems and Project X Gregory L. Vogel Controls
Presentations
Instrumentation
10 Sep 2009
266-v1 Bunch Shape Monitor for HINS Wai-Ming Tam Presentations
Instrumentation
10 Sep 2009
268-v1 E-Beam Scanner R&D Randy M Thurman-Keup Presentations
Instrumentation
10 Sep 2009
265-v1 Experience on SNS Beam Instrumentation Collaborations Willem Blokland Controls
Presentations
Instrumentation
10 Sep 2009
263-v1 Collaboration Opportunities on Project X Beam Instrumentation Manfred Wendt Presentations
Instrumentation
10 Sep 2009
256-v1 Status of Microwave Measurements in the Main Injector Nathan Eddy Main Injector
Instrumentation
10 Sep 2009
253-v3 Review Transfer/Injection R&D Plan – Siting Issues David E. Johnson Transfer Line
Collaboration
Presentations
10 Sep 2009
269-v1 Status of Ecloud Build-Up Simulations for the FNAL MI- Sept. 2009 Miguel A Furman Instabilities
Main Injector
10 Sep 2009
267-v1 Titanium Nitride Magnetron Sputtering Linda Valerio Main Injector
10 Sep 2009
261-v1 Design Considerations for CW SRF Linacs Arkadiy Klebaner et al. Cryogenics
Presentations
10 Sep 2009
259-v1 Project X ICD-2 Cryogenic System Overview Jay C. Theilacker Cryogenics
Presentations
10 Sep 2009
260-v1 Superconduction accelerator segmentation overview Arkadiy Klebaner Cryogenics
10 Sep 2009
250-v5 Project X: Introduction, Strategy, and Collaboration Meeting Goals Steve Holmes Presentations
10 Sep 2009
251-v1 Project X ICD-1 Cryogenics and associated RD&D Plan Overview Arkadiy Klebaner Cryogenics
Presentations
10 Sep 2009
252-v1 J-PARC RCS Injection Issues Pranab K Saha H- Injection
Other Labs
Absorbers
Collaboration
Presentations
10 Sep 2009

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.33 usr + 0.07 sys = 0.40 CPU)